← Back
Public elementary, junior or senior high
Grammar School No. 9
460 WEST END AVENUE · BIN 1032754
💬 Discuss this project
1896Year Built
5Stories
W1Building Class
R10AZoning
48,200 sfGross Floor Area
2Units
LL97 Covered9 Open Violations 3 unresolved · 6 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 15,325 sf lot · 3.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 20 docs
Floor 52p · 1 filing · 10 docs
Floor 42p · 1 filing · 10 docs
Floor 32p · 1 filing · 10 docs
Floor 22p · 1 filing · 10 docs
Floor 13p · 2 filings · 20 docs
Cellar8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCSCA6808/06/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE PS 841 040103/22/2026
DEPARTMENT OF EDUCATION 01003/22/2026
DOE - PS 53403/22/2026
DEPARTMENT OF EDUCATION1403/22/2026
DEPT OF EDUCATION PS811 0203/22/2026
DOE PS 811 040303/22/2026
DEPT OF EDUCATION PS 811303/22/2026
DOE - PS 811/ PS 53103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AME SERVICES803/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EURO CASTLE CONSTRUCTIONGeneral Contractor1107/08/2026
EVERLAST SCAFFOLDING INCGeneral Contractor907/08/2026
CENTRAL MECHANICAL SYSTEMS INCGeneral Contractor608/06/2026
THERMO TECH MECHANICAL I*General Contractor507/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
STANCO SYSTEM ELEC'L CONTElectrical303/22/2026
KEL-TECH CONSTRUCTION INCGeneral Contractor307/15/2026
JOSHUA ANDERSONElectrical203/21/2026
WHITESTONE CONSTRUCTION CORPGeneral Contractor207/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SAMCO ELECTRIC CORP.Electrical103/22/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS ENGINEERS, P.C.7715209/15/2024
20/20 INSPECTIONS INC1471510/11/2023
JPC LOGISTICS DBA JPCL EN351108/04/2022
Building Lifecycle
All (167)Filed (17)Permit Issued (34)Signed Off (1)Violation (60)Inspection (13)Objection (12)Special Inspection (30)
08/07/2026
Filed — Alteration
Boiler and heating system update
M01437548-S1
08/06/2026
Special inspection requirement — Post-installed Anchors
08/06/2026
Special inspection requirement — Electrical motors and elevators
08/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/06/2026
Special inspection requirement — Maintenance information
08/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/06/2026
Special inspection requirement — Final
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
08/06/2026
Special inspection requirement — Mechanical Systems
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/06/2026
Special inspection requirement — Chimneys and vents
08/06/2026
Special inspection requirement — Heating Systems
08/05/2026
Filed — Alteration
Boiler and heating system update
M01437548-I1
08/05/2026
Permit issued — Mechanical Systems
M01108403-S2-MS
08/05/2026
Permit issued — Construction Fence
M01108403-I1-FN
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Objection resolved — Addressed
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/22/2026
Special inspection requirement — Maintenance information
07/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2026
Permit issued — Sidewalk Shed
M00930690-I1-SH
06/29/2026
Objection raised — Other
06/11/2026
Filed — Alteration
M01373407-S1
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2026
Filed — Alteration
M01373407-I1
06/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2026
Permit issued — Sidewalk Shed
M00930690-I1-SH
03/31/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2026
Permit issued — General Construction
M00682828-I1-GC
03/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
03/05/2026
Violation issued (ECB, open)
Construction
03/02/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
02/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2026
Permit issued — Plumbing
M00682828-S3-PL
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/24/2025
Permit issued — Construction Fence
M01108403-I1-FN
09/24/2025
Permit issued — Mechanical Systems
M01108403-S2-MS
09/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/05/2025
Permit issued — Sidewalk Shed
M00930690-I1-SH
07/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/14/2025
Violation issued (ECB, closed)
Construction
04/14/2025
Violation issued (ECB, open)
Construction
04/14/2025
Violation issued (ECB, open)
Construction
04/14/2025
Violation issued (ECB, closed)
Construction
04/14/2025
Violation issued (ECB, closed)
Construction
03/28/2025
Permit issued — Mechanical Systems
M00682828-S2-MS
01/28/2025
Permit issued — Sidewalk Shed
M00930690-I1-SH
01/28/2025
Permit issued — Supported Scaffold
M00930682-I1-SF
01/13/2025
Permit issued — Sidewalk Shed
M00930690-I1-SH
01/13/2025
Permit issued — Supported Scaffold
M00930682-I1-SF
01/09/2025
Permit issued — Plumbing
M00682828-S3-PL
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEMS INC08/05/2026
DOB NOWConstruction FencePermit IssuedCENTRAL MECHANICAL SYSTEMS INC08/05/2026
DOB NOWSidewalk ShedPermit IssuedKEL-TECH CONSTRUCTION INC07/14/2026
DOB NOWSidewalk ShedPermit IssuedKEL-TECH CONSTRUCTION INC04/01/2026
DOB NOWGeneral ConstructionPermit IssuedEURO CASTLE CONSTRUCTION03/30/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/08/2026
DOB NOWConstruction FencePermit IssuedCENTRAL MECHANICAL SYSTEM09/24/2025
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEM09/24/2025
DOB NOWSidewalk ShedPermit IssuedKEL-TECH CONSTRUCTION INC08/05/2025
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/28/2025
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING01/28/2025
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING01/28/2025
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING01/13/2025
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING01/13/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/09/2025
DOB NOWConstruction FencePermit IssuedEURO CASTLE CONSTRUCTION01/08/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedEURO CASTLE CONSTRUCTION01/08/2025
DOB NOWGeneral ConstructionPermit IssuedEURO CASTLE CONSTRUCTION01/08/2025
DOB NOWStructuralPermit IssuedEURO CASTLE CONSTRUCTION01/08/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/04/2024
DOB NOWMechanical SystemsPermit IssuedCENTRAL MECHANICAL SYSTEM10/02/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/02/2024
DOB NOWConstruction FencePermit IssuedCENTRAL MECHANICAL SYSTEM10/02/2024
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/28/2024
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*01/16/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/09/2024
DOB NOWGeneral ConstructionPermit IssuedEURO CASTLE CONSTRUCTION01/08/2024
DOB NOWStructuralPermit IssuedEURO CASTLE CONSTRUCTION01/08/2024
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING01/05/2024
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING01/05/2024
DOB NOWConstruction FencePermit IssuedEURO CASTLE CONSTRUCTION01/05/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedEURO CASTLE CONSTRUCTION01/02/2024
DOB NOWSidewalk ShedSigned-offWHITESTONE CONSTRUCTION CORP03/21/2023
DOB NOWSidewalk ShedSigned-offWHITESTONE CONSTRUCTION CORP03/16/2022
BISOTISSUEDI.S.M. ELECTRIC INC05/19/2025
BISOTISSUEDI.S.M. ELECTRIC INC05/06/2025
BISOTISSUEDI.S.M. ELECTRIC INC06/29/2023
BISPLISSUEDFRANCO BELLI PLMG&HTG SON01/07/2021
BISOTISSUEDJ & N CONSTRUCTION GROUP12/28/2020
BISEQISSUEDJ & N CONSTRUCTION GROUP04/22/2020
+ 44 more permits on file
3 projects · most recent 08/07/2026
Heating Systems Heating and Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026——Heating Systems
Heating
Weil-Mclain Weil Mclain BGL 1588-W-Series 2 4,809,000 BTU · Boiler ×2
08/04/2022——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU36RLAVS 36,000 BTU · Condensing Unit ×1
ASUB36TLAV1 34,000 BTU · Fan Coil Indoor ×1
03/18/2022Permit IssuedEURO CASTLE CONSTRUCTIONAssociated Ducts and Piping—
1 project · most recent 03/18/2022
Storm
FiledStatusContractorScope
03/18/2022Permit IssuedVARSITY PLBG AND HTG INCStorm
16 projects · most recent 02/03/2026
General Wiring Lighting
FiledStatusContractorScope
02/03/2026CompleteLION HEART ELECTRIC CORPGeneral Wiring
10/28/2025CompleteANCO ELECTL CONTCTNG INC—
09/14/2025Permit IssuedASCUATECH ELECTRICAL CORPLighting
07/25/2025Permit IssuedSTANCO SYSTEM ELEC'L CONT—
09/23/2024Permit IssuedSTANCO SYSTEM ELEC'L CONT—
02/12/2024CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
01/08/2024CompleteANCO ELECTL CONTCTNG INC—
08/31/2023CompleteEVS ELECTRIC CORPGeneral Wiring
06/21/2023CompleteGEMINI ELECTRIC CO., INC.—
11/16/2022CompleteSTANCO SYSTEM ELEC'L CONT—
06/20/2022Permit IssuedP.S. MARCATO ELEV. CO INC—
10/08/2021CompleteSTANCO SYSTEM ELEC'L CONT—
07/07/2021CompleteSTANCO SYSTEM ELEC'L CONT—
06/14/2021Permit IssuedSAMCO ELECTRIC CORP.—
02/23/2021CompleteI.S.M. ELECTRIC, INC.General Wiring
3 projects · most recent 09/15/2024
Fence Sidewalk Shed
FiledStatusContractorScope
09/15/2024Permit IssuedCENTRAL MECHANICAL SYSTEMFence
10/11/2023Permit IssuedKEL-TECH CONSTRUCTION INCSidewalk Shed
09/18/2023Permit IssuedEURO CASTLE CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/06/2026Post-installed Anchors—special
08/06/2026Electrical motors and elevators—energy_progress
08/06/2026HVAC-R and service water heating system controls—energy_progress
08/06/2026Maintenance information—energy_progress
08/06/2026HVAC-R and service water piping design and insulation—energy_progress
08/06/2026Duct leakage testing, insulation and design—energy_progress
08/06/2026HVAC-R and service water heating equipment—energy_progress
08/06/2026Final—progress
08/06/2026Energy Code Compliance Inspections—progress
08/06/2026Mechanical Systems—special
08/06/2026Fire-Resistant Penetrations and Joints—special
08/06/2026Chimneys and vents—special
08/06/2026Heating Systems—special
08/04/2026Fire-Resistant Penetrations and Joints—special
07/22/2026HVAC-R and service water piping design and insulation—energy_progress
07/22/2026Maintenance information—energy_progress
06/11/2026Fire-Resistant Penetrations and Joints—special
06/10/2026Fire-Resistance Rated Construction—progress
06/10/2026Fire-Resistant Penetrations and Joints—special
09/26/2024Post-installed AnchorsMohamed Shahidspecial
09/26/2024Chimneys and ventsMohamed Shahidspecial
09/09/2024Mechanical SystemsMohamed Shahidspecial
09/09/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMohamed Shahidspecial
09/09/2024FinalMohamed Shahidprogress
08/02/2022FinalAsma Hashmiprogress
Latest 25 of 39.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 811EducationRoof
Project M01437548 Alteration · Plan Examiner Review · 08/05/2026
Project M00682828 Alteration · Permit Entire · 02/17/2022
Ps 811mEducation—
Project M00943350 Alteration · Permit Entire · 10/11/2023
Project M00930699 Alteration · Permit Entire · 09/18/2023
The Mickey Mantle SchoolEducation—
Project M00785698 Alteration · Approved · 08/04/2022
Ps811m (sped)Education—
Project M00589145 Alteration · LOC Issued · 12/14/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00589145-I1Request digital key ↗
09/02/2026M00682828-S3Request digital key ↗
09/02/2026M00682828-S2Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit7
09/02/2026M00682828-S3Open ↗
08/13/2026M00682828-S1Open ↗
08/13/2026M00682828-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
01/07/2014121666615Open ↗
01/07/2014121666606Open ↗
▸BISWORK PERMIT APPLICATION2
01/07/2014121666615Open ↗
01/07/2014121666606Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00589145-I1Open ↗
09/02/2026M00682828-I1Open ↗
09/02/2026M00682828-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M01108403-S1Open ↗
09/01/2026M00682828-S2Open ↗
09/01/2026M00682828-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00682828-S2Open ↗
09/01/2026M00682828-S1Open ↗
08/30/2026M01108403-S2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/07/2014121666615Open ↗
01/07/2014121666606Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/07/2014121666606Open ↗
01/07/2014121666615Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/07/2014121666615Open ↗
01/07/2014121666606Open ↗
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/13/2026M00930699-I1Open ↗
08/13/2026M01108403-I1Open ↗
08/13/2026M00589145-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/07/2014121666615Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026M01108403-S2Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/03/2026M00589145-I1Open ↗
09/02/2026M00682828-S2Open ↗
09/02/2026M00682828-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
09/02/2026M00682828-S3Open ↗
08/16/2026M01437548-S1Open ↗
08/16/2026M01437548-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/02/2026M00682828-S3Open ↗
08/13/2026M00682828-I1Open ↗
08/13/2026M00930699-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter4
09/02/2026M00682828-S2Open ↗
09/02/2026M00682828-S3Open ↗
09/02/2026M00682828-I1Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
01/07/2014121666615Open ↗
01/07/2014121666606Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
09/02/2026M00682828-S3Open ↗
08/16/2026M01437548-S1Open ↗
08/16/2026M01437548-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00682828-I1Open ↗
08/13/2026M00785698-I1Open ↗