| Owner | Filings | Most Recent |
|---|---|---|
| CLASSIC CONSULTING GROUP | 8 | 09/15/2026 |
| SKYLINE SCAFFOLDING GROUP | 30 | 07/08/2026 |
| ROCK GROUP NY | 5 | 07/08/2026 |
| MC SUPERSTRUCTURE INC. | 7 | 03/22/2026 |
| CONSIGLI CONSTRUCTION | 4 | 03/22/2026 |
| ACADIA P/A SHERMAN LLC | 2 | 03/22/2026 |
| AQOZFL INWOOD LLC/ C/O TH | 1 | 03/22/2026 |
| CONSTRUCTION CO CONSIGLI | 1 | 03/22/2026 |
| C/O THE ARDEN GROUP AQOZF | 1 | 03/22/2026 |
| 4650 TIC LLC | 4 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 11/12/2019 | $54.0M | — | — → — | — not available |
| 04/17/2018 | $26.0M | — | ACADIA-P/A SHERMAN AVENUE LLC → 4650 BROADWAY HOLDINGS LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| PELLOVERTON LLC | 8 | 08/19/2026 |
| ALSIEUX ARCHITECTURE, LLC. | 6 | 07/30/2026 |
| HANDEL ARCHITECTS LLP | 15 | 07/29/2026 |
| COSENTINI ASSOCIATES | 24 | 05/13/2026 |
| AMA CONSULTING ENGINEERS, PC | 7 | 05/11/2026 |
| ZENITH HOME INSPECTIONS | 1 | 03/24/2026 |
| LANGAN ENGINEERING | 7 | 12/17/2025 |
| APPLIED HVAC ENGINEERING, PLLC | 8 | 09/04/2025 |
| MURDOCH ENGINEERING | 4 | 08/18/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 2 | 08/08/2025 |
| DESIMONE CONSULTING ENGINEERS | 8 | 05/22/2025 |
| CHAN ASCHER ARCHITECTURE PLLC | 2 | 03/31/2025 |
| PAUL PERDEK, PROF. ENG. PLLC | 11 | 08/15/2024 |
| G. BLINN CONSULTING, LLC | 1 | 08/09/2024 |
| GGA STUDIOS, DPC | 2 | 05/07/2024 |
| PLAN B ENGINEERING | 5 | 04/05/2024 |
| KN3 ENGINEERING LLC | 2 | 01/25/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 01/26/2023 |
| JOEL PHAGOO P.E. PLLC | 2 | 12/06/2022 |
| VELOCITY MONITORING & INSTRUMENTATI | 1 | 02/23/2022 |
| KZ ENGINEERING, P.C | 4 | 01/19/2022 |
| S.M. BERGER ARCHITECTURE PC | 1 | 08/20/2019 |
| STROH ENGINEERING SERVICES, P.C. | 1 | 08/06/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE | 26 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 4 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 142 | 03/21/2026 |
| AE DESIGN SOLUTION | 16 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| SKYLINE ACCESS | 2 | 03/21/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 03/21/2026 |
| DANICO SERVICES | 2 | 03/21/2026 |
| DOMANI CONSULTING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CONSIGLI CONSTRUCTION CO | General Contractor | 38 | 07/08/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 31 | 07/08/2026 |
| GDI CONSTRUCTION LLC | General Contractor | 6 | 03/21/2026 |
| CLASSIC CONSULTING GROUP | General Contractor | 5 | 08/20/2026 |
| POWER ELECTRICAL CONTS IN 005126 | General Contractor | 4 | 03/22/2026 |
| PACE PLUMBING CORP | Plumbing | 4 | 07/08/2026 |
| PEAK FIRE PROTECTION LLC | Fire Protection | 4 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 3 | 07/08/2026 |
| SKYTRAC ACCESS GROUP, LLC | General Contractor | 3 | 07/08/2026 |
| PACE PLUMBING CORP | Fire Protection | 3 | 07/08/2026 |
| NEPTUNE SIGNS AWNINGS | Scaffold | 2 | 07/08/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 2 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 2 | 03/21/2026 |
| ROCK GROUP NY CORP | General Contractor | 2 | 07/08/2026 |
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 2 | 07/08/2026 |
| SNG BRICK AND STONE INC | General Contractor | 2 | 04/08/2026 |
| TITAN INDUSTRIAL SVC CORP | General Contractor | 2 | 07/08/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 2 | 07/08/2026 |
| TT MECHANICAL CORP | Plumbing | 2 | 07/08/2026 |
| B.A.C.C BUILDERS INC | General Contractor | 1 | 07/22/2026 |
| TTM GROUP CORP | Fire Protection | 1 | 07/08/2026 |
| WHITESTONE PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| ZEREGA CONTRACTING CORP | Plumbing | 1 | 07/10/2026 |
| CITY SIGNS | Scaffold | 1 | 07/08/2026 |
| DEMAR MECHANICAL INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| COLE TECHNOLOGIES/CONTROL | 1290 | 61 | 07/29/2026 |
| SOCOTEC, INC. | 301 | 11 | 07/29/2026 |
| LEO Y LEE ASSOCIATES | 2481 | 4 | 09/04/2024 |
| DESIMONE CONSULTING ENGIN | 5942 | 5 | 07/12/2023 |
| LANGAN ENG, ENV, SURVEYIN | 1265 | 3 | 04/18/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Signed-off | CLASSIC CONSULTING GROUP | 08/19/2026 |
| DOB NOW | General Construction | Signed-off | B.A.C.C BUILDERS INC | 07/20/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CLASSIC CONSULTING GROUP | 07/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | ZEREGA CONTRACTING CORP | 07/08/2026 |
| DOB NOW | Construction Fence | Signed-off | CLASSIC CONSULTING GROUP | 06/25/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITOL FIRE SPRINKLER CO | 06/09/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | CLASSIC CONSULTING GROUP | 06/02/2026 |
| DOB NOW | Construction Fence | Signed-off | CLASSIC CONSULTING GROUP | 06/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WESBUILT CONSTRUCTION MAN | 05/22/2026 |
| DOB NOW | General Construction | Permit Issued | WESBUILT CONSTRUCTION MAN | 05/20/2026 |
| DOB NOW | Sign | Signed-off | ELMER DAWSON | 03/27/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYTRAC ACCESS GROUP, LLC | 11/03/2025 |
| DOB NOW | Curb Cut | Signed-off | CONSIGLI CONSTRUCTION CO | 10/14/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 10/14/2025 |
| DOB NOW | Curb Cut | Signed-off | CONSIGLI CONSTRUCTION CO | 10/10/2025 |
| DOB NOW | Supported Scaffold | Signed-off | MC SUPERSTRUCTURE INC | 06/25/2025 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 06/09/2025 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 06/09/2025 |
| DOB NOW | Structural | Signed-off | GDI CONSTRUCTION LLC | 04/01/2025 |
| DOB NOW | Sprinklers | Signed-off | TT MECHANICAL CORP | 03/25/2025 |
| DOB NOW | Plumbing | Signed-off | TT MECHANICAL CORP | 03/25/2025 |
| DOB NOW | Sprinklers | Signed-off | TTM GROUP CORP | 03/24/2025 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 01/13/2025 |
| DOB NOW | Plumbing | Signed-off | WHITESTONE PLUMBING CORP | 12/23/2024 |
| DOB NOW | General Construction | Signed-off | GDI CONSTRUCTION LLC | 11/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | GDI CONSTRUCTION LLC | 11/27/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/05/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYTRAC ACCESS GROUP LLC | 09/05/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYTRAC ACCESS GROUP LLC | 08/09/2024 |
| DOB NOW | Standpipe | Signed-off | ADVANCED AUTO SPR.CO.,INC | 07/30/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYLINE RESTORATION INC | 06/12/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYLINE RESTORATION INC | 06/11/2024 |
| DOB NOW | Supported Scaffold | Signed-off | SNG BRICK AND STONE INC | 05/20/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/10/2024 |
| DOB NOW | Construction Fence | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/10/2024 |
| DOB NOW | Plumbing | Signed-off | PACE PLUMBING CORP | 05/02/2024 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED AUTO SPR.CO.,INC | 04/25/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/29/2026 | Permit Issued | CONSIGLI CONSTRUCTION CO | Cooling Towers, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Carrier 50PCH036WWCEECF9 3 tons · Heat Pump Outdoor ×10 50HQP072NWC5B1TP 8 tons · Heat Pump Outdoor ×5 50HQP096NWC5B1TV 8 tons · Heat Pump Outdoor ×5 50PCH036PWCEECF9 3 tons · Heat Pump Outdoor ×5 50PCH036YWCEECF9 3 tons · Heat Pump Outdoor ×5 50PCH042WWCEECF9 3 tons · Heat Pump Outdoor ×5 50PCH042YWCEECF9 3 tons · Heat Pump Outdoor ×5 50PCH048NWCEECF9 4 tons · Heat Pump Outdoor ×5 50PCH048WWCEECF9 4 tons · Heat Pump Outdoor ×5 50PCV036JWCEECF9 3 tons · Heat Pump Outdoor ×5 50VQP240FWL5A1TM 20 tons · Heat Pump Outdoor ×5 RXYQ72XAYDA 6 tons · Vrf Outdoor ×1 — RXYQ72XAYDA 6 tons · Condensing Unit ×4 |
| 05/11/2026 | Permit Issued | WESBUILT CONSTRUCTION MAN | Heating and Air Conditioning Systems | Heat / Cool Dunham-Bush ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Signed-off | TTM GROUP CORP | Sprinkler System |
| 05/11/2026 | Permit Issued | CAPITOL FIRE SPRINKLER CO | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Signed-off | TT MECHANICAL CORP | Gas, Storm, Water/Sanitary |
| 05/11/2026 | Permit Issued | ZEREGA CONTRACTING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/18/2026 | Permit Issued | CLOONAGH ELECTRICAL CORP | General Wiring |
| 06/10/2026 | Complete | KOBRYN ELEC'L SERVICES IN | General Wiring |
| 04/29/2026 | Permit Issued | RICHARD NEU | — |
| 11/12/2025 | Complete | POWER ELECTRICAL CONTS IN | General Wiring |
| 07/31/2025 | Complete | LIPPOLIS ELECTRIC, INC. | 7 meters |
| 06/13/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 06/13/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 05/29/2025 | Permit Issued | AGIR ELEC'L LTD. D/B/A | General Wiring |
| 04/30/2025 | Complete | CENTRIFUGAL ELECTRIC LLC | General Wiring |
| 03/07/2025 | Permit Issued | EMPIRE STATE ELEC MAINT & | General Wiring |
| 11/03/2022 | Complete | AGIR ELEC'L LTD. D/B/A | 1 meters, 1 new_meters |
| 11/02/2022 | Complete | AGIR ELEC'L LTD. D/B/A | — |
| 10/13/2022 | Permit Issued | JAM ELECTRICAL CORP | — |
| 08/30/2022 | Permit Issued | P & M ELECT'L CONTR. CORP | General Wiring |
| 08/26/2022 | Complete | TOP SHELF ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Signed-off | TT MECHANICAL CORP | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Signed-off | CLASSIC CONSULTING GROUP | Sidewalk Shed |
| 05/08/2026 | Signed-off | CLASSIC CONSULTING GROUP | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Signed-off | TT MECHANICAL CORP | Dewatering, Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/29/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/22/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 09/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/05/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/29/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/10/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/22/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/21/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/14/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/14/2024 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 08/14/2024 | Certified StandPipe - SD - Fire StandPipe - SD - Roughing | Certified | View ↗ |
| 08/14/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/12/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/24/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/24/2024 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 06/12/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/23/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/21/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/17/2024 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 05/14/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | Vestibules | Jennifer Sze | energy_progress |
| 08/13/2026 | Exterior lighting power | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Fire-Resistance Rated Construction | GEORGE ANDERSEN | progress |
| 08/13/2026 | Lighting controls | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Interior lighting power | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Wall Panels, Curtain Walls, and Veneers | Jennifer Sze | special |
| 08/13/2026 | Fenestration air leakage | Jennifer Sze | energy_progress |
| 08/13/2026 | Lighting in dwelling units | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Exterior Insulation and Finish Systems (EIFS) | Jennifer Sze | special |
| 08/13/2026 | Electrical motors and elevators | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Fenestration areas | Jennifer Sze | energy_progress |
| 08/13/2026 | Luminous Exit Path Markings | GEORGE ANDERSEN | special |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | GEORGE ANDERSEN | special |
| 08/13/2026 | Protection of exposed foundation insulation | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Fenestration and door U-factor and product ratings | Jennifer Sze | energy_progress |
| 08/13/2026 | Maintenance information | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Metering | GEORGE ANDERSEN | energy_progress |
| 08/13/2026 | Subsurface Investigations (Borings/Test Pits) | Saul Shapiro | special |
| 08/13/2026 | Air barrier - visual inspection | Jennifer Sze | energy_progress |
| 08/13/2026 | Insulation placement and R values | Jennifer Sze | energy_progress |
| 08/12/2026 | Public Assembly Emergency Lighting | GEORGE ANDERSEN | progress |
| 08/12/2026 | Public Assembly Emergency Lighting | GEORGE ANDERSEN | progress |
| 05/29/2026 | Air barrier - visual inspection | Jennifer Sze | energy_progress |
| 05/29/2026 | Lighting in dwelling units | GEORGE ANDERSEN | energy_progress |
| 05/29/2026 | Maintenance information | GEORGE ANDERSEN | energy_progress |