47 3 AVENUE
MANHATTAN · BIN 1087710
💬 Discuss this project
2006Year Built
6Stories
RMBuilding Class
C6-2AZoning
41,323 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 47 THIRD VENTURE,LLC · 6,726 sf lot · 6.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscapeGeneralOther
Roof9p · 7 filings · 20 docs
Floor 21p · 1 filing · 8 docs
Floor 120p · 11 filings · 20 docs
Cellar12p · 6 filings · 20 docs
Basement1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MGT PROPERTY MANAGEMENT907/08/2026
SLATE PROPERTY GROUP703/22/2026
47 THIRD VENTURE,LLC DOUG403/22/2026
SD BUILDERS AND CONSTRUCT603/22/2026
47 THIRD VENTURE,LLC203/22/2026
47-3RD VENTURE2103/22/2026
47 THIRD AVE VENTURE LLC103/22/2026
10/3 REALTY CORP203/22/2026
47 THIRD RESIDENTIAL INVESTORS1003/21/2026
47 THIRD RESIDENTIAL1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP2603/21/2026
RIP CC603/21/2026
BUILDING BROTHERS403/21/2026
BOHLER ENGINEERING NY1003/21/2026
CONSTRUCTION PERMIT SERVICES603/21/2026
EA DESIGN GROUP603/21/2026
GGONZALEZ BOHLERENG COM203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONTRACTING NYC LLCGeneral Contractor903/21/2026
JACOBS TELECOMMUN. INCGeneral Contractor707/08/2026
360 PRESTIGE CONTRACTINGGeneral Contractor607/08/2026
R.W. DAKE & CO.,INCGeneral Contractor607/08/2026
ULTIMATE SIGNS DESIGNSScaffold407/08/2026
PROCORE MECHANICAL CORPPlumbing307/08/2026
HUDSON PLMBING & MCH, LLCPlumbing307/08/2026
V&D MECHANICAL INCGeneral Contractor203/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
GUY FORDElectrical103/21/2026
FORD, GUYElectrical103/21/2026
ANTHONY RANIERIElectrical103/21/2026
AURA PLUMBING INCPlumbing107/08/2026
M&T PLBG AND HTG CO., INCPlumbing107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
PALACE SAMUELElectrical103/21/2026
AI FANG WUElectrical103/21/2026
SAMUEL PALACEElectrical103/21/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544311/15/2024
AK ENGINEERING PC678411/13/2024
TAN ENGINEERING, P.C.1291110/04/2024
CITY-WIDE TESTING INC416803/19/2024
ANGELOS GEORGOPOULOS, P.C2955106/20/2023
R MARSAC CONSULTING LLC329305/27/2022
AKS ARCHITECTURAL & ENGIN1957304/27/2021
Building Lifecycle
All (230)Filed (33)Permit Issued (26)Signed Off (22)Violation (60)Inspection (23)Objection (36)Special Inspection (30)
05/12/2026
Signed off — Alteration
Installation of new AT&T site. Install 4 sectors (16 antennas), 16 RRH units, & new equipment platform with equipment cabinet on roof. Related conduits through floor 1-6 to basement. In conformance with TPPN 5/98. No change in use, egress, or occupancy
M00396997-I1
07/25/2025
Signed off — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR RETAIL SPACE FOR NEW ADA COMPLIANT BATHROOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01013193-I1
07/24/2025
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 1ST FLOOR RETAIL SPACE FOR NEW ADA COMPLIANT BATHROOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01013192-I1
07/07/2025
Permit issued — General Construction
M01013192-I1-GC
03/13/2025
Signed off — Alteration
Filing for interior removal of and infill at the first floor. No change to use, egress, or occupancy
M01112928-I1
03/11/2025
Signed off — Alteration
M01100243-I1
03/11/2025
Signed off — Alteration
M01100346-I1
02/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2024
Permit issued — Structural
M01112928-I1-ST
11/15/2024
Filed — Alteration
Filing for interior removal of and infill at the first floor. No change to use, egress, or occupancy
M01112928-I1
11/15/2024
Signed off — Alteration
Installation of new gas piping from cellar to floors 1-6 to roof. Related generator filed under separate application # M00397009. No change in use, egress, or occupancy.
M00397023-I1
11/13/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR RETAIL SPACE FOR NEW ADA COMPLIANT BATHROOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01013193-P1
10/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/22/2024
Permit issued — Plumbing
M00397023-I1-PL
10/10/2024
Permit issued — Mechanical Systems
M01100346-I1-MS
10/07/2024
Filed — Alteration
M01100243-I1
10/04/2024
Filed — Alteration
M01100346-I1
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
10/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
09/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
09/04/2024
Special inspection requirement — Ventilation and air distribution system
Roger Tan
09/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
09/04/2024
Special inspection requirement — Shutoff dampers
Roger Tan
09/04/2024
Special inspection requirement — Maintenance information
Roger Tan
09/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
09/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
08/22/2024
Special inspection requirement — Mechanical Systems
Roger Tan
08/22/2024
Special inspection requirement — Final
Roger Tan
05/15/2024
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
05/14/2024
Filed — No Work
M00992892-P3
05/14/2024
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
04/18/2024
Objection resolved — Addressed
04/16/2024
Objection raised — Other
04/15/2024
Signed off — Alteration
Install Construction Fence for Facade work. No Change in Use Egress Or Occupancy
M00929609-I1
04/10/2024
Signed off — Alteration
Construction of a new elevator from the first floor to cellar. Installation of interior partitions as per plans, countertops, electrical, lighting, rough in for plumbing fixtures to be installed under a separate applications. no change in use or egress
M00822947-I1
04/09/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
04/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
04/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
04/08/2024
Special inspection requirement — Interior lighting power
ELIAS RASABI
04/08/2024
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
04/08/2024
Special inspection requirement — Lighting controls
ELIAS RASABI
04/03/2024
Filed — No Work
M00992892-P2
04/03/2024
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
03/25/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/20/2024
Objection raised — Other
03/20/2024
Objection resolved — Addressed
03/19/2024
Filed — Alteration
Construction of a new elevator from the first floor to cellar. Installation of interior partitions as per plans, countertops, electrical, lighting, rough in for plumbing fixtures to be installed under a separate applications. no change in use or egress
M00822947-P2
03/19/2024
Permit issued — Plumbing
M01013193-I1-PL
03/19/2024
Special inspection requirement — Lighting controls
ELIAS RASABI
03/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
03/19/2024
Special inspection requirement — Interior lighting power
ELIAS RASABI
03/19/2024
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
03/15/2024
Objection resolved — Addressed
03/14/2024
Objection resolved — Addressed
Latest 60 of 230 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCONTRACTING NYC LLC07/07/2025
DOB NOWStructuralSigned-offCONTRACTING NYC LLC11/25/2024
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC10/22/2024
DOB NOWMechanical SystemsSigned-offV&D MECHANICAL INC10/10/2024
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP03/19/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.10/13/2023
DOB NOWConstruction FenceSigned-off360 PRESTIGE CONTRACTING10/05/2023
DOB NOWMechanical SystemsSigned-off360 PRESTIGE CONTRACTING10/05/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG10/02/2023
DOB NOWGeneral ConstructionSigned-off360 PRESTIGE CONTRACTING08/10/2023
DOB NOWGeneral ConstructionSigned-off360 PRESTIGE CONTRACTING06/22/2023
DOB NOWGeneral ConstructionSigned-offR.W. DAKE & CO.,INC05/09/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO01/11/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO01/11/2022
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP12/23/2021
DOB NOWPlumbingSigned-offM&T PLBG AND HTG CO., INC11/05/2021
DOB NOWMechanical SystemsSigned-offR.W. DAKE & CO.,INC11/05/2021
DOB NOWGeneral ConstructionSigned-offR.W. DAKE & CO.,INC11/05/2021
DOB NOWStructuralSigned-offR.W. DAKE & CO.,INC11/05/2021
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC10/08/2021
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR09/03/2021
DOB NOWGeneral ConstructionSigned-offARMENTUM DIGITAL INFRASTR08/26/2021
DOB NOWMechanical SystemsSigned-offARMENTUM DIGITAL INFRASTR08/24/2021
DOB NOWPlumbingSigned-offAURA PLUMBING INC08/18/2021
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/10/2021
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/10/2021
BISPLISSUEDARCO PLBG AND HTG INC10/16/2019
BIS—ISSUEDSD BUILDERS AND CONSTRUCT05/13/2019
BISSDISSUEDARCO PLBG AND HTG INC02/19/2019
BISSDISSUEDARCO PLBG AND HTG INC12/06/2018
BISPLISSUEDARCO PLBG AND HTG INC09/18/2018
BISEQISSUEDBAYPORT CONSTRUCTION CORP.09/07/2018
BISEQISSUEDBAYPORT CONSTRUCTION CORP.09/07/2018
BISOTISSUEDSD BUILDERS AND CONSTRUCT09/06/2018
BISEQISSUEDBAYPORT CONSTRUCTION CORP.07/13/2018
BISEQISSUEDBAYPORT CONSTRUCTION CORP.07/13/2018
BISEQISSUEDBAYPORT CONSTRUCTION CORP.07/13/2018
BISOTISSUEDSD BUILDERS AND CONSTRUCT06/05/2018
BIS—ISSUEDSD BUILDERS AND CONSTRUCT05/11/2018
BISSDISSUEDARCO PLBG AND HTG INC02/05/2018
+ 36 more permits on file
14 projects · most recent 04/28/2025
General Wiring Lighting
FiledStatusContractorScope
04/28/2025CompleteKWONG MING ELECTRIC INCGeneral Wiring
04/23/2025CompleteH. & L. ELECTRIC INCGeneral Wiring
08/02/2024CompleteUNITED ELEC'L CONT'G CORPGeneral Wiring
08/02/2024CompleteUNITED ELEC'L CONT'G CORP—
11/16/2023CompleteERIC & NG ELEC'L, INC.General Wiring
07/25/2023CompleteJ Y ELECTRIC INC—
11/16/2022CompleteH. & L. ELECTRIC INC—
10/03/2022CompleteULTIMATE SIGNS & ELEC COR—
10/03/2022CompleteULTIMATE SIGNS & ELEC COR—
08/27/2022CompleteGOTHAM WIRING LICENSED61 meters, 3 new_meters
08/10/2022CompleteGOTHAM WIRING LICENSEDGeneral Wiring
12/15/2021CompleteSRM ELECTRICAL SVC INCGeneral Wiring, Lighting
09/27/2021Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
05/26/2020Permit IssuedDYNAMIC ELEC'L CONTRS INC56 meters, 28 new_meters
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
02/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/25/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/04/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
01/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
10/31/2024Fire-Resistant Penetrations and JointsAri Kamospecial
10/31/2024Tenant Protection Plan Compliance—special
10/01/2024Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
10/01/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
09/04/2024Ventilation and air distribution systemRoger Tanenergy_progress
09/04/2024HVAC-R and service water heating system controlsRoger Tanenergy_progress
09/04/2024Duct leakage testing, insulation and designRoger Tanenergy_progress
09/04/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
09/04/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
09/04/2024Shutoff dampersRoger Tanenergy_progress
09/04/2024Maintenance informationRoger Tanenergy_progress
08/22/2024Mechanical SystemsRoger Tanspecial
08/22/2024FinalRoger Tanprogress
05/15/2024Public Assembly Emergency LightingMARCH CHADWICKprogress
05/14/2024Public Assembly Emergency LightingMARCH CHADWICKprogress
04/08/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
04/08/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
04/08/2024Interior lighting powerELIAS RASABIenergy_progress
04/08/2024Lighting controlsELIAS RASABIenergy_progress
04/08/2024Post-installed AnchorsELIAS RASABIspecial
04/08/2024Tenant Protection Plan ComplianceELIAS RASABIspecial
04/03/2024Public Assembly Emergency LightingMARCH CHADWICKprogress
03/19/2024Post-installed AnchorsELIAS RASABIspecial
03/19/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
03/19/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
Latest 25 of 76.
▾Documents — 647 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch19
09/03/2026M00515427-I1Request digital key ↗
09/03/2026M00515456-I1Request digital key ↗
09/03/2026M00541637-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/03/2026M00470645-I1Request digital key ↗
09/03/2026M00397023-I1Request digital key ↗
08/15/2026M00397023-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly3
08/27/2026M00992892-P3Request digital key ↗
08/15/2026M00992892-I1Request digital key ↗
08/15/2026M00992892-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00467291-P1Request digital key ↗
08/15/2026M00467291-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00470154-I1Request digital key ↗
09/03/2026M00397009-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
09/03/2026M00396997-I1Request digital key ↗
08/14/2026M00396997-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/03/2026M00470092-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00471137-I1Request digital key ↗
▸Applications & Permits140
▸BISPLAN / WORK APPROVAL APPLICATION85
09/25/2025122332706Open ↗
09/24/2025122332706Open ↗
04/14/2025122769281Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION54
05/14/2019121961868Open ↗
02/20/2019122769281Open ↗
12/11/2018121961868Open ↗
Showing 3 of 54 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications203
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
07/01/2019121961868Open ↗
06/05/2019121961868Open ↗
06/05/2019121961868Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/03/2026M00467291-I1Open ↗
09/03/2026M00467291-P1Open ↗
09/03/2026M00470645-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026M00992892-I1Open ↗
09/02/2026M00822947-I1Open ↗
09/02/2026M00822947-P1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
09/21/2017123336121Open ↗
Showing 1 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026M00822947-I1Open ↗
09/02/2026M00822947-I1Open ↗
09/02/2026M00822947-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
10/13/2017140707215Open ↗
09/21/2017123336121Open ↗
Showing 2 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
10/13/2017140707215Open ↗
Showing 1 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
10/13/2017140707215Open ↗
Showing 1 of 8 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/08/2019123019456Open ↗
04/12/2019121961868Open ↗
Showing 2 of 10 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
04/19/2019123253898Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/19/2024121961868Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026M00822947-I1—
▸Safety & Tenant Protection15
▸BISTENANT PROTECTION PLAN AND NOTES7
03/06/2024121961868Open ↗
10/13/2017140707215Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWTenant Protection Plan5
09/03/2026M00396997-I1Open ↗
08/13/2026M00397023-P1Open ↗
08/13/2026M00397023-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
10/10/2024121961868Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/21/2017123336121Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
06/05/2019121961868Open ↗
06/05/2019121961868Open ↗
05/07/2019121961868Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/03/2026M00470154-I1Open ↗
08/15/2026M00467291-I1Open ↗
08/13/2026M00397009-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
06/05/2019121961868Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/25/2020123336121Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/13/2017140707215Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/29/2019121961868Open ↗
09/21/2017121961868Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
05/25/2018121961868Open ↗
09/20/2017121961868Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
11/25/2020123336121Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
01/25/2018122769281Open ↗
▸Approvals, Objections & Sign-offs80
▸BISSCHEDULE A - OCCUPANCY / USE31
05/16/2024121961868Open ↗
05/15/2024121961868Open ↗
05/10/2024121961868Open ↗
Showing 3 of 31 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
04/14/2025122769281Open ↗
11/25/2020123336121Open ↗
08/17/2020121961868Open ↗
Showing 3 of 22 on file for this type
▸BISSUPERSEDING LETTER11
12/11/2018121961868Open ↗
10/29/2018140691133Open ↗
10/29/2018140707215Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/01/2019121961868Open ↗
07/13/2018140668007Open ↗
Showing 2 of 5 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT23
09/21/2017123336121Open ↗
Showing 1 of 23 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE9
05/14/2019121961868Open ↗
05/14/2018121961868Open ↗
Showing 2 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/28/2025122769281Open ↗
11/25/2020123336121Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms70
▸BISADDITIONAL INFORMATION29
05/16/2023121961868Open ↗
03/24/2021121961868Open ↗
04/29/2019121961868Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM18
02/21/2020121961868Open ↗
12/12/2019121961868Open ↗
09/20/2019121961868Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET14
02/14/2019123253898Open ↗
09/21/2017123336121Open ↗
Showing 2 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
10/13/2017140707215Open ↗
Showing 1 of 9 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/01/2019121961868Open ↗
07/01/2019121961868Open ↗
07/01/2019121961868Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type