← Back
Condo, residential unit in 2-10 unit building
The 470 Second Street Condominium
470 2 STREET · BIN 3020999
💬 Discuss this project
1920Year Built
3Stories
R1Building Class
R6BZoning
4,651 sfGross Floor Area
2Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: SE SECOND STREET LLC · 1,900 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof11p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 38p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar8p · 2 filings · 20 docs
Basement8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS407/08/2026
SE SECOND STREET LLC203/22/2026
BUILDERS CONSTRUCTION NYC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1107/20/2023
MOHAMMAD AHEAD, PE106/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY803/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS CONSTRUCTION NYCGeneral Contractor1307/08/2026
JRL SKYLINE INCGeneral Contractor1003/21/2026
FULL CIRCLE PLUMBING CORP.Plumbing307/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131007/20/2023
Building Lifecycle
All (97)Filed (12)Permit Issued (14)Signed Off (6)Violation (16)Inspection (5)Objection (14)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
07/25/2023
Special inspection requirement — Fenestration areas
Fran Huang
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
07/25/2023
Special inspection requirement — Maintenance information
Fran Huang
07/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
07/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
07/25/2023
Special inspection requirement — Fenestration air leakage
Fran Huang
07/25/2023
Special inspection requirement — Insulation placement and R values
Fran Huang
07/25/2023
Special inspection requirement — Air barrier - visual inspection
Fran Huang
07/25/2023
Special inspection requirement — Interior lighting power
Fran Huang
07/25/2023
Special inspection requirement — Masonry
Fran Huang
07/25/2023
Special inspection requirement — Permanent certificate
Fran Huang
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/20/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT OF EXISTING 4 STORY BUILDING. CONVERT EXISTING 4 FAMILIES TO 2 FAMILIES. WORK ON OPEN SPACE, CELLAR, BAS, 1ST FLOOR THRU. 3RD FLOOR & ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00727722-P2
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/20/2023
Special inspection requirement — Permanent certificate
Fran Huang
07/20/2023
Special inspection requirement — Interior lighting power
Fran Huang
07/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
07/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
07/20/2023
Special inspection requirement — Air barrier - visual inspection
Fran Huang
07/20/2023
Special inspection requirement — Maintenance information
Fran Huang
07/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
07/20/2023
Special inspection requirement — Fenestration areas
Fran Huang
07/20/2023
Special inspection requirement — Insulation placement and R values
Fran Huang
07/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/20/2023
Special inspection requirement — Masonry
Fran Huang
07/20/2023
Special inspection requirement — Fenestration air leakage
Fran Huang
07/18/2023
Signed off — Alteration
B00727754-I1
07/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/07/2023
Signed off — Alteration
FILING TEMPORARY SOLID FENCE FOR MAIN BUILDING CONSTRUCTION. IN CONJUNCTION WITH GC APPLICATION#B00728516.
B00782251-I1
07/07/2023
Signed off — Alteration
B00882700-I1
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
07/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/30/2023
Filed — Alteration
B00727754-P2
06/30/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/26/2023
Filed — Alteration
B00727754-P1
06/16/2023
Signed off — Alteration
Propose excavation with support work in conjunction with enlargement job#B00727722.
B00751185-I1
06/16/2023
Signed off — Alteration
PROPOSED FOOTING, FOUNDATION AND STRUCTURAL WORK IN CONJUNCTION WITH ENLARGEMENT JOB# B00727722.
B00728516-I1
06/14/2023
Signed off — Alteration
PROPOSED MECHANICAL WORK ON OPEN SPACE, CEL, BASEMENT, 1st TO 3rd FLOOR, AND ROOF. AS PER PLAN.
B00727759-I1
06/13/2023
Filed — Alteration
PROPOSED MECHANICAL WORK ON OPEN SPACE, CEL, BASEMENT, 1st TO 3rd FLOOR, AND ROOF. AS PER PLAN.
B00727759-P1
06/13/2023
Objection raised — Scope
06/13/2023
Objection resolved — Addressed
06/12/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT OF EXISTING 4 STORY BUILDING. CONVERT EXISTING 4 FAMILIES TO 2 FAMILIES. WORK ON OPEN SPACE, CELLAR, BAS, 1ST FLOOR THRU. 3RD FLOOR & ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00727722-P1
06/05/2023
Filed — Alteration
B00882700-I1
06/05/2023
Permit issued — Supported Scaffold
B00882700-I1-SF
05/31/2023
Permit issued — Plumbing
B00727754-I1-PL
05/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2023
Permit issued — Support of Excavation
B00751185-I1-SE
04/18/2023
Permit issued — Mechanical Systems
B00727759-I1-MS
04/18/2023
Permit issued — General Construction
B00727722-I1-GC
04/18/2023
Permit issued — Construction Fence
B00782251-I1-FN
04/17/2023
Permit issued — Foundation
B00728516-I1-GC-CX
03/17/2023
Violation issued (HPD, open)
A
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS06/05/2023
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP05/31/2023
DOB NOWSupport of ExcavationSigned-offJRL SKYLINE04/18/2023
DOB NOWMechanical SystemsSigned-offJRL SKYLINE04/18/2023
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE04/18/2023
DOB NOWConstruction FenceSigned-offJRL SKYLINE04/18/2023
DOB NOWFoundationSigned-offJRL SKYLINE04/17/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS CONSTRUCTION NYC09/20/2022
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP09/15/2022
DOB NOWConstruction FenceSigned-offBUILDERS CONSTRUCTION NYC08/03/2022
DOB NOWFoundationSigned-offBUILDERS CONSTRUCTION NYC06/23/2022
DOB NOWSupport of ExcavationSigned-offBUILDERS CONSTRUCTION NYC06/23/2022
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP06/14/2022
DOB NOWMechanical SystemsSigned-offBUILDERS CONSTRUCTION NYC06/10/2022
4 projects · most recent 07/07/2023
General Wiring
FiledStatusContractorScope
07/07/2023CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
07/03/2023CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
08/30/2022CompleteRIGHTWAY ELECTRICAL INC—
01/17/2020CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
1 project · most recent 07/20/2023
FiledStatusContractorScope
07/20/2023Permit IssuedJRL SKYLINE INC1 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/30/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
07/25/2023MasonryFran Huangspecial
07/25/2023Fire-Resistant Penetrations and JointsFran Huangspecial
07/25/2023Structural Stability – Alterations of existing buildingsFran Huangspecial
07/25/2023Energy Code Compliance InspectionsFran Huangprogress
07/25/2023Fire-Resistance Rated ConstructionFran Huangprogress
07/25/2023Permanent certificateFran Huangenergy_progress
07/25/2023Fenestration areasFran Huangenergy_progress
07/25/2023Maintenance informationFran Huangenergy_progress
07/25/2023Air barrier - visual inspectionFran Huangenergy_progress
07/25/2023Interior lighting powerFran Huangenergy_progress
07/25/2023Fenestration air leakageFran Huangenergy_progress
07/25/2023Insulation placement and R valuesFran Huangenergy_progress
07/25/2023Fenestration and door U-factor and product ratingsFran Huangenergy_progress
07/20/2023Fire-Resistant Penetrations and JointsFran Huangspecial
07/20/2023Permanent certificateFran Huangenergy_progress
07/20/2023Insulation placement and R valuesFran Huangenergy_progress
07/20/2023Fenestration areasFran Huangenergy_progress
07/20/2023Maintenance informationFran Huangenergy_progress
07/20/2023Air barrier - visual inspectionFran Huangenergy_progress
07/20/2023Fenestration and door U-factor and product ratingsFran Huangenergy_progress
07/20/2023Fenestration air leakageFran Huangenergy_progress
07/20/2023MasonryFran Huangspecial
07/20/2023Structural Stability – Alterations of existing buildingsFran Huangspecial
07/20/2023Energy Code Compliance InspectionsFran Huangprogress
07/20/2023Fire-Resistance Rated ConstructionFran Huangprogress
Latest 25 of 88.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/29/2026B00728516-I1Request digital key ↗
08/29/2026B00751185-I1Request digital key ↗
08/29/2026B00727759-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/13/2022322110559Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00727722-P2Open ↗
08/13/2026B00727722-I1Open ↗
08/13/2026B00727722-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00727722-P2Open ↗
08/13/2026B00727722-I1Open ↗
08/13/2026B00727722-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/17/2022322110559Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/17/2022322110559Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00727722-I1Open ↗
▸Seals & Professional Certifications102
▸DOB NOWProgress Inspector Seal & Signature62
09/19/2026B00727722-P1Open ↗
09/19/2026B00727722-P1Open ↗
09/19/2026B00727722-P1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/19/2026B00727722-P1Open ↗
09/19/2026B00727722-P1Open ↗
09/19/2026B00727722-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00751185-I1Open ↗
08/29/2026B00727759-P1Open ↗
08/29/2026B00727759-I1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00727722-I1Open ↗
08/13/2026B00727722-P2Open ↗
08/13/2026B00727722-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026B00751185-I1Open ↗
08/29/2026B00727759-I1Open ↗
08/29/2026B00727759-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/29/2026B00727759-I1Open ↗
08/29/2026B00727754-I1Open ↗
08/13/2026B00727722-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/13/2022322110559Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026B00727722-P1Open ↗
08/13/2026B00727722-P2Open ↗
08/13/2026B00727722-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00727722-P2Open ↗
08/13/2026B00727722-P1Open ↗
08/13/2026B00727722-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00727722-P1Open ↗
08/13/2026B00727722-I1Open ↗
08/13/2026B00727722-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/27/2026B00727722-P2Open ↗
08/15/2026B00727722-P1Open ↗
08/15/2026B00727722-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/17/2022322110559Open ↗
▸DOB NOWAdjoining Owners Notification1
08/29/2026B00751185-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00727722-I1Open ↗