← Back
BuildNYC
Adult care facility
Sunrise of New Dorp
470 NEW DORP LANE · BIN 5171390
💬 Discuss this project
2020Year Built
4Stories
I7Building Class
C4-1Zoning
84,137 sfGross Floor Area
95Units
0 Active ViolationsFDNY Report ↗
Adult care facility · Owner of record: Sunrise of New Dorp Propco · 123,474 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSunrise Senior Living2p · 1 filing · 3 docs
Floor 4Sunrise Senior Living4p · 2 filings · 5 docs
Floor 3Sunrise Senior Living3p · 1 filing · 3 docs
Floor 2Sunrise Senior Living3p · 1 filing · 3 docs
Floor 1Sunrise Senior Living3p · 1 filing · 3 docs
Site & exteriorSunrise Senior Living4p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sunrise Development4507/08/2026
FM Construction Group203/21/2026
FNC Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Meyer Architects104/25/2025
Bohler Engineering NY601/06/2022
Levin Engineering107/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bohler Engineering203/21/2026
Metropolis Group203/21/2026
Sol Building Consulting Services103/21/2026
Ggonzalez Bohlereng Company603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDC Custom Design & Dime*General Contractor203/21/2026
KbenyGeneral Contractor207/08/2026
A & F Fire Protection CoFire Protection207/08/2026
Rock Group NYScaffold107/08/2026
Z-Car-DSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843104/25/2025
MT Group798202/15/2021
Building Lifecycle
All (51)Filed (8)Permit Issued (7)Signed Off (5)Violation (15)Objection (12)Special Inspection (4)
10/08/2025
Permit issued — General Construction
S01208996-I1-GC
04/25/2025
Filed — Alteration
General Construction Installing a set of secure doors in the existing 4th floor corridor to convert 11 currently memory care resident units to assisted living units.
S01208996-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2022
Signed off — Alteration
S00657961-I1
01/21/2022
Permit issued — General Construction
S00657961-I1-GC
01/06/2022
Filed — Alteration
S00657961-I1
07/22/2021
Signed off — Alteration
FILING HEREWITH INSTALLATION OF 19.38 SF SIGN
S00468763-I1
07/19/2021
Permit issued — Sign
S00468763-I1-SG
05/18/2021
Signed off — Alteration
FILING HEREWITH FOUNDATION FOR PYLON SIGN
S00470421-I1
05/10/2021
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE
S00407813-I1
04/01/2021
Permit issued — General Construction
S00470421-I1-GC
02/23/2021
Objection raised — Admin
02/23/2021
Objection resolved — Addressed
02/23/2021
Objection raised — Admin
02/23/2021
Objection resolved — Addressed
02/23/2021
Objection raised — Admin
02/23/2021
Objection resolved — Addressed
02/23/2021
Objection raised — Admin
02/23/2021
Objection resolved — Addressed
02/23/2021
Objection raised — Admin
02/23/2021
Objection resolved — Addressed
02/23/2021
Objection raised — Admin
02/23/2021
Objection resolved — Addressed
02/15/2021
Filed — Alteration
FILING HEREWITH INSTALLATION OF 19.38 SF SIGN
S00468763-I1
02/15/2021
Filed — Alteration
FILING HEREWITH FOUNDATION FOR PYLON SIGN
S00470421-I1
02/15/2021
Special inspection requirement — Concrete - Cast-In-Place
PAUL HESSEL
02/15/2021
Special inspection requirement — Subgrade Inspections
PAUL HESSEL
02/15/2021
Special inspection requirement — Final
KARTHIKEYAN SHANMUGAM
02/10/2021
Special inspection requirement — Final
KARTHIKEYAN SHANMUGAM
02/05/2021
Permit issued — Construction Fence
S00407813-I1-FN
02/04/2021
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE
S00407813-P2
01/28/2021
Signed off — Alteration
S00363112-I1
01/20/2021
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE
S00407813-P1
01/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2020
Violation issued (ECB, closed)
Construction
11/13/2020
Violation issued (ECB, closed)
Unknown
10/27/2020
Violation issued (ECB, closed)
Construction
10/27/2020
Violation issued (ECB, closed)
Construction
10/27/2020
Violation issued (ECB, closed)
Unknown
10/27/2020
Violation issued (ECB, closed)
Construction
10/02/2020
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE
S00407813-I1
07/06/2020
Permit issued — Sprinklers
S00363112-I1-EW-SD
07/06/2020
Permit issued — Sprinklers
S00363112-I1-EW-SP
07/02/2020
Filed — Alteration
S00363112-I1
04/10/2020
Violation issued (ECB, closed)
Unknown
04/10/2020
Violation issued (ECB, closed)
Construction
04/10/2020
Violation issued (ECB, closed)
Site Safety
03/07/2020
Violation issued (ECB, closed)
Construction
03/07/2020
Violation issued (ECB, closed)
Construction
03/07/2020
Violation issued (ECB, closed)
Construction
04/17/1991
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCDC Custom Design Dime*10/08/2025
DOB NOWGeneral ConstructionSigned-offKbeny01/21/2022
DOB NOWSignSigned-offZ-Car-D07/19/2021
DOB NOWGeneral ConstructionSigned-offKbeny04/01/2021
DOB NOWConstruction FenceSigned-offRock Group NY02/05/2021
DOB NOWStandpipeSigned-offAdvanced Automatic Sprinkler Co07/06/2020
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co07/06/2020
BIS—ISSUEDKbeny04/02/2021
BISPLISSUEDAccess Plumbing01/05/2021
BISEQISSUEDFM Construction Group08/25/2020
BIS—ISSUEDKbeny04/01/2020
BIS—ISSUEDKbeny04/01/2020
BIS—ISSUEDKbeny03/30/2020
BIS—ISSUEDKbeny03/30/2020
BISPLISSUEDAccess Plumbing01/16/2020
BISOTISSUEDKbeny10/04/2019
BIS—ISSUEDKbe Building09/25/2019
2 projects · most recent 10/09/2020
General Wiring
FiledStatusContractorScope
10/09/2020CompleteNTS Electrical—
02/21/2020CompleteTop Shelf ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/15/2021Concrete - Cast-In-PlacePAUL HESSELspecial
02/15/2021Subgrade InspectionsPAUL HESSELspecial
02/15/2021FinalKARTHIKEYAN SHANMUGAMprogress
02/10/2021FinalKARTHIKEYAN SHANMUGAMprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Sunrise Senior LivingResidentialFloors 1–4, Roof
Project S01208996 Alteration · Permit Entire · 04/25/2025
Project S00657961 Alteration · LOC Issued · 01/06/2022
Project S00363112 Alteration · LOC Issued · 07/02/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Construction Fence3
08/25/2026S00407813-I1Request digital key ↗
08/15/2026S00407813-P2Request digital key ↗
08/15/2026S00407813-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/24/2026S00657961-I1Request digital key ↗
08/19/2026S01208996-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026S00470421-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/26/2026S00363112-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/26/2026S00363112-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/15/2026S00468763-I1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION37
02/09/2023520366782Open ↗
09/30/2021520288590Open ↗
09/17/2021520288590Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION9
08/25/2020540181319Open ↗
04/01/2020520366782Open ↗
04/01/2020520366782Open ↗
Showing 3 of 9 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION4
06/04/2020520366782Open ↗
05/08/2020520366782Open ↗
04/23/2020520366782Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/23/2019520359451Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/30/2020520366782Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED4
08/13/2019520366782Open ↗
07/31/2019520366782Open ↗
04/23/2019520372962Open ↗
Showing 3 of 4 on file for this type
▸BISVERIFY TAX LOT1
10/26/2021520366782Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/27/2021520366782Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/26/2021520366782Open ↗
▸BISZONING DIAGRAM1
09/24/2019520366782Open ↗
▸BISZONING EXHIBIT I,3CERTIFICATION1
05/14/2021520366782Open ↗
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/28/2021520366782Open ↗
11/20/2019520366782Open ↗
10/07/2019520392520Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026S00363112-I1Open ↗
08/25/2026S00407813-P1Open ↗
08/25/2026S00407813-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/18/2020540181319Open ↗
10/07/2019520392520Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S00470421-I1Open ↗
09/02/2026S00470421-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/04/2026S00468763-I1Open ↗
09/02/2026S00470421-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/18/2020540181319Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING4
05/25/2021520366782Open ↗
04/26/2021520366782Open ↗
12/21/2020520366782Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
07/31/2019520366782Open ↗
12/22/2022520366782Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
06/28/2021520366782Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/02/2021520366782Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
07/26/2021520366782Open ↗
▸BISSTANDPIPE (SD) SIGNOFF1
06/28/2021520366782Open ↗
▸BISEQUIPMENT USE PERMITS1
07/26/2021520366782Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
07/26/2021520366782Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/11/2018520366782Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/28/2021520366782Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST6
09/24/2019520366782Open ↗
07/31/2019520366782Open ↗
02/20/2019520372962Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT2
07/31/2019520366782Open ↗
05/23/2019520359451Open ↗
▸BISSTREET TREE SIGNOFF1
11/22/2021520366782Open ↗
▸BISSTREET TREES SITE PLAN1
03/04/2022520366782Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/20/2019520366782Open ↗
12/11/2018520366782Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/17/2021520366782Open ↗
03/17/2021520366782Open ↗
03/17/2021520366782Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/26/2021520366782Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
05/14/2021520366782Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
05/14/2021520366782Open ↗
05/14/2021520366782Open ↗
05/14/2021520366782Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
05/27/2020520366782Open ↗
03/10/2020520366782Open ↗
12/05/2019520366782Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/08/2021520392520Open ↗
03/26/2021520366782Open ↗
12/04/2020520366782Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
05/23/2019520359451Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/20/2020540181319Open ↗
▸Approvals, Objections & Sign-offs39
▸BISSCHEDULE A - OCCUPANCY / USE15
02/09/2023520366782Open ↗
05/07/2021520366782Open ↗
04/28/2021520366782Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/04/2020520366782Open ↗
05/27/2020520366782Open ↗
05/08/2020520366782Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
10/07/2019520392520Open ↗
Showing 1 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/08/2021520392520Open ↗
02/04/2021540181319Open ↗
08/24/2020540181319Open ↗
▸BISFINAL1
08/24/2020540181319Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
07/26/2021520366782Open ↗
▸BISDCP APPROVAL FOR CROSS ACCESS CONNECTION,1
05/14/2021520366782Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
03/04/2022520366782Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/23/2019520359451Open ↗
▸BISLetter from Homeowner for Withdrawal1
09/30/2021520288590Open ↗
▸BISCURB CUT (CC) SIGNOFF1
07/26/2021520366782Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
07/26/2021520366782Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE5
04/01/2020520366782Open ↗
03/17/2020520366782Open ↗
12/12/2019520366782Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
04/08/2021520392520Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms42
▸BISADDITIONAL INFORMATION21
10/18/2021520366782Open ↗
05/14/2021520366782Open ↗
05/14/2021520366782Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM10
06/04/2020520366782Open ↗
05/27/2020520366782Open ↗
05/07/2020520366782Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET9
10/07/2019520392520Open ↗
02/20/2019520372962Open ↗
12/11/2018520366782Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/18/2020540181319Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/23/2019520359451Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/17/2018520359451Open ↗
12/11/2018520366782Open ↗
▸BISPLOT DIAGRAM2
08/13/2019520366782Open ↗
12/11/2018520366782Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
03/26/2021520366782Open ↗