← Back
Three families
470 PUTNAM AVENUE
BROOKLYN · BIN 3052068
💬 Discuss this project
1915Year Built
3Stories
C0Building Class
R6BZoning
3,760 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION INC503/22/2026
MANRE503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2022$1.8M—Private party → Private party$479/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OPERA STUDIO ARCHITECTURE, LLC708/16/2023
FADY HABEEL211/11/2022
OMFPE CONSULTING PLLC109/15/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANRE LLCGeneral Contractor403/21/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
NEW ERA MECH SERVICE INCFire Protection107/08/2026
KATAN P & H INCPlumbing107/08/2026
TRUE NORTH MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OPERA STUDIO ARCHITECTURE5970608/16/2023
INTEGRITY CONSULTING SERV666306/01/2023
GFC CONSULTING ENGINEER P4127109/15/2022
Building Lifecycle
All (78)Filed (10)Permit Issued (6)Signed Off (4)Violation (23)Inspection (7)Special Inspection (28)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
08/16/2023
Filed — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-P8
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
06/22/2023
Signed off — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-S2
06/21/2023
Signed off — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-S4
06/21/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B08019336-I1
06/02/2023
Signed off — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-I1
06/01/2023
Filed — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-P7
03/24/2023
Violation issued (HPD, open)
A
03/01/2023
Filed — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-P2
03/01/2023
Filed — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-P1
02/26/2023
Special inspection requirement — Mechanical Systems
Thomas Barry
02/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
02/26/2023
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
02/26/2023
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
02/26/2023
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
02/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
02/26/2023
Special inspection requirement — Final
Thomas Barry
02/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Thomas Barry
02/26/2023
Special inspection requirement — Footing and Foundation
ALEKSANDR LEVIN
02/26/2023
Special inspection requirement — Air barrier - visual inspection
Thomas Barry
02/26/2023
Special inspection requirement — Fenestration areas
Thomas Barry
02/26/2023
Special inspection requirement — Fenestration air leakage
Thomas Barry
02/26/2023
Special inspection requirement — Concrete - Cast-In-Place
ALEKSANDR LEVIN
02/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
02/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
02/26/2023
Special inspection requirement — Insulation placement and R values
Thomas Barry
02/26/2023
Special inspection requirement — Metering
Thomas Barry
02/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
02/26/2023
Special inspection requirement — Interior lighting power
Thomas Barry
02/26/2023
Special inspection requirement — Shutoff dampers
Thomas Barry
02/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
02/26/2023
Special inspection requirement — Ventilation and air distribution system
Thomas Barry
02/26/2023
Special inspection requirement — Maintenance information
Thomas Barry
02/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
02/03/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/31/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/31/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/31/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
12/27/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/15/2022
Permit issued — Plumbing
B00759159-S1-PL
11/16/2022
Permit issued — Construction Fence
B00759159-S4-FN
11/11/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B08019336-P1
11/10/2022
Violation issued (HPD, open)
I
11/03/2022
Filed — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-S4
10/14/2022
Violation issued (ECB, closed)
Unknown
10/13/2022
Permit issued — Supported Scaffold
B08019336-I1-SF
10/12/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B08019336-I1
10/12/2022
Violation issued (ECB, closed)
Unknown
09/26/2022
Permit issued — Sprinklers
B00759159-S2-EW-SP
09/23/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/15/2022
Filed — Alteration
Subsequent filing to modify existing sprinkler heads as indicated.
B00759159-S2
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKATAN P & H INC12/15/2022
DOB NOWConstruction FenceSigned-offMANRE LLC11/16/2022
DOB NOWSupported ScaffoldSigned-offKAJ NY CONSTRUCTION INC10/13/2022
DOB NOWSprinklersSigned-offNEW ERA MECH SERVICE INC09/26/2022
DOB NOWPlumbingSigned-offTRUE NORTH MECHANICAL LLC06/28/2022
DOB NOWGeneral ConstructionSigned-offMANRE LLC06/22/2022
1 project · most recent 08/16/2023
FiledStatusContractorScope
08/16/2023Signed-offNEW ERA MECH SERVICE INC—
1 project · most recent 06/01/2022
General Wiring
FiledStatusContractorScope
06/01/2022CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
12/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/21/2023Fire-Resistant Penetrations and JointsThomas Barryspecial
08/11/2023Fire-Resistant Penetrations and JointsThomas Barryspecial
02/26/2023Mechanical SystemsThomas Barryspecial
02/26/2023Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
02/26/2023Structural Steel - DetailsALEKSANDR LEVINspecial
02/26/2023Structural Steel - High Strength BoltingALEKSANDR LEVINspecial
02/26/2023Structural Steel - WeldingALEKSANDR LEVINspecial
02/26/2023Energy Code Compliance InspectionsThomas Barryprogress
02/26/2023FinalThomas Barryprogress
02/26/2023Fire-Resistance Rated ConstructionThomas Barryprogress
02/26/2023Footing and FoundationALEKSANDR LEVINprogress
02/26/2023Air barrier - visual inspectionThomas Barryenergy_progress
02/26/2023Fenestration areasThomas Barryenergy_progress
02/26/2023Fenestration air leakageThomas Barryenergy_progress
02/26/2023Concrete - Cast-In-PlaceALEKSANDR LEVINspecial
02/26/2023Fenestration and door U-factor and product ratingsThomas Barryenergy_progress
02/26/2023HVAC-R and service water heating equipmentThomas Barryenergy_progress
02/26/2023Insulation placement and R valuesThomas Barryenergy_progress
02/26/2023MeteringThomas Barryenergy_progress
02/26/2023HVAC-R and service water heating system controlsThomas Barryenergy_progress
02/26/2023Interior lighting powerThomas Barryenergy_progress
02/26/2023Shutoff dampersThomas Barryenergy_progress
02/26/2023HVAC-R and service water piping design and insulationThomas Barryenergy_progress
02/26/2023Ventilation and air distribution systemThomas Barryenergy_progress
02/26/2023Maintenance informationThomas Barryenergy_progress
Latest 25 of 28.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08019336-P1Request digital key ↗
08/28/2026B08019336-I1Request digital key ↗
08/27/2026B00759159-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08019336-I1Open ↗
08/28/2026B08019336-P1Open ↗
08/27/2026B00759159-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026B00759159-P1Open ↗
08/28/2026B00759159-S1Open ↗
08/28/2026B00759159-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B00759159-P2Open ↗
08/28/2026B00759159-P2Open ↗
08/28/2026B00759159-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026B00759159-I1Open ↗
08/27/2026B00759159-S1Open ↗
08/27/2026B00759159-S2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00759159-I1Open ↗