| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00680157 ↗ | 603 6 AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/31/2022 | 09/01/2026 | Design OUTPOST ARCHITECTURE DPC Contractor A & S SCULLARI CONSTRUCTI | UNDERPINNING FILED IN CONJUNCTION WITH RENOVATION OF 4 STORY RESIDENTIAL BUILDING. ALT-CO FILED UNDER B00680157-I1. SOE FILED UNDER B0068015… |
| B01043132 ↗ | 641 BALTIC STREET BROOKLYN | Alteration | Signed-off | 05/03/2024 | 07/20/2026 | Design GCF CONSULTING ENGINEERS Contractor QBK PLUMBING & HTNG INC | Herewith filing removal, replacement and installation of plumbing fixtures, as per plans submitted. There is no change to use, egress or oc… |
| M00469735 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Permit Issued | 08/25/2021 | 06/30/2026 | Design HER DESIGN ARCHITECTURE PLLC Contractor BROWNSTONE MANAGEMENT LLC | INTERIOR RENOVATION OF APT# 73 INCLUDING MINOR RELOCATION OF INTERIOR PARTITION WALLS, UPDATING AND RELOCATING THE KITCHEN AND KITCHEN FIXTU… |
| B01270953 ↗ | 40 PARK PLACE BROOKLYN | Alteration CO | Permit Issued | 08/22/2025 | 06/17/2026 | Design GCF CONSULTING ENGINEERS Contractor HAPPY CARPENTERS INC | Herewith filing structural work consisting of masonry, steel and framing, as per plans submitted |
| B00672794 ↗ | 603 6 AVENUE BROOKLYN | Alteration | Permit Issued | 09/15/2022 | 05/13/2026 | Design GCF CONSULTING ENGINEERS Contractor A & S SCULLARI CONSTRUCTI | MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATED 4-STORY RESIDENTIAL BUILDING. INSTALL NEW SPLIT MECHANICAL SYSTEM, KITCHEN AND TOILET EX… |
| B01170989 ↗ | 253 WARREN STREET BROOKLYN | Alteration | Permit Issued | 01/27/2025 | 04/20/2026 | Design GCF CONSULTING ENGINEERS Contractor WILLOWFIELD DEVELOPMENT | New mechanical system in conjunction with renovation. |
| Name | Projects together | Most recent |
|---|---|---|
| GCF CONSULTING ENGINEERS | 61 | 09/02/2026 |
| OUTPOST ARCHITECTURE DPC | 3 | 06/04/2026 |
| ALFRED V SAULO, ARCHITECT PC | 2 | 12/10/2024 |
| AURA ARCHITECTURE D.P.C. | 2 | 05/18/2022 |
| HER DESIGN ARCHITECTURE PLLC | 2 | 10/12/2023 |
| ABRACHITECTURE | 1 | 10/05/2022 |
| ARCHITECTURE AF | 1 | 09/11/2020 |
| AZA ENGINEERING LLC | 1 | 09/02/2026 |
| BANGIA AGOSTINHO ARCHITECTURE DPC | 1 | 03/31/2026 |
| FRAMEWORK ENGINEERING PC | 1 | 06/05/2026 |
| GASBARRO STRUCTURAL ENGINEERING | 1 | 03/31/2026 |
| GILLEN - KONUK ARCHITECTURE, DPC | 1 | 01/31/2022 |
| IVAN DESIGN ENG. ANALYSIS, PLLC | 1 | 06/04/2026 |
| JOHN PATRICK CUNNINGHAM | 1 | 05/08/2022 |
| JOSEPH K. BLUM CO. LLP | 1 | 05/01/2026 |
| LEVIN ENGINEERING PLLC | 1 | 04/07/2026 |
| MARTOS ENGINEERING | 1 | 03/29/2026 |
| MINIMAL ARCHITECTURE PLLC | 1 | 10/04/2024 |
| NIZA WORKS OF ARCHITECTURE PLLC | 1 | 08/11/2026 |
| OMFPE CONSULTING PLLC | 1 | 08/16/2023 |
| OPERA STUDIO ARCHITECTURE, LLC | 1 | 08/16/2023 |
| REN PLUS ARCHITECTS | 1 | 03/29/2026 |
| RYBAK ARCHITECTS, P.C. | 1 | 09/13/2025 |
| SERMAN ENGINEERING | 1 | 01/06/2023 |
| WUNDERGROUND LLC | 1 | 05/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A & S SCULLARI CONSTRUCTI | 2 | 05/01/2026 |
| BROWNSTONE MANAGEMENT LLC | 2 | 09/10/2021 |
| EXPERT FIRE SPRINKLER,LLC | 2 | 12/21/2024 |
| FSL PAINTING AND DESIGN | 2 | 10/12/2023 |
| HAPPY CARPENTERS INC | 2 | 03/31/2026 |
| J3R BUILDERS CONTRACTING | 2 | 06/04/2026 |
| PAINTLY CORP | 2 | 10/05/2022 |
| ROSELAND CONSTRUCTION COR | 2 | 08/10/2025 |
| SAMUEL & SONS P & H INC | 2 | 04/26/2022 |
| SMART PLBG & HTG CORP | 2 | 09/13/2025 |
| US LEVIN GRP CORP | 2 | 09/13/2025 |
| 212 RENOVATIONS GROUP LLC | 1 | 05/18/2022 |
| A C INTERIOR GROUP INC | 1 | 03/29/2023 |
| A. M. PLUMBING COMPANY | 1 | 09/07/2021 |
| ABACUS BUILDING INNOVATIO | 1 | 04/07/2026 |
| ABR CONSTRUCTION GROUP LL | 1 | 05/10/2022 |
| ALL PRO PLBG & HTG INC | 1 | 10/05/2022 |
| ALLTYPE FIRE PROTECT LLC | 1 | 04/07/2026 |
| ALTAIR PLUMBING AND HEAT | 1 | 09/15/2022 |
| AMC PLBG, HTG & CLNG, INC | 1 | 06/21/2021 |
| AMN SPRINKLER INC | 1 | 09/03/2024 |
| APTEL CONSTRUCTION LLC | 1 | 10/04/2024 |
| ARANDA PLBG & HTG CORP | 1 | 04/11/2025 |
| ARIANA CONTRACTING INC | 1 | 02/05/2024 |
| AZCC BUILDERS INC | 1 | 05/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| 363 WASHINGTON LLC | 3 | 10/09/2024 |
| TRG | 3 | 09/13/2025 |
| JDS REALTY HOLDINGS, LLC | 2 | 12/10/2024 |
| JT REALTY ADVISORS LLC | 2 | 06/21/2021 |
| Triton Construction | 2 | 04/21/2025 |
| 30-33 29TH STREET REALTY LLC | 1 | 04/07/2026 |
| ALLIED PARTNERS | 1 | 01/09/2023 |
| AMA PROPERTIES & HOLDINGS LLC | 1 | 12/14/2021 |
| BUCHBINDER & WARREN LLC | 1 | 02/26/2020 |
| PRO BUILDING MANAGEMENT LLC | 1 | 06/05/2026 |
| REBECCA REALTY MGMT | 1 | 04/26/2022 |
| TRIHILL MANAGEMENT | 1 | 06/06/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| ANZALONE ARCHITECTURE, PLLC | 14 | 06/04/2026 |
| J. CALLAHAN CONSULTING, INC. | 10 | 09/02/2026 |
| NEXUS CONSULTING NYC, INC | 3 | 11/21/2025 |
| VSS CONSULTANTS INC. | 2 | 12/10/2024 |
| ADAM MAISER | 1 | 01/31/2022 |
| AGOUTI CONSTRUCTION CONSULTING | 1 | 05/12/2023 |
| ANTHONY BONSIGNORE, RA | 1 | 03/29/2026 |
| BMB BUILDING CONSULTING INC. | 1 | 04/07/2026 |
| BOUTIQKEY LLC | 1 | 10/04/2024 |
| GAMILL ENGINEERING, PC | 1 | 01/23/2026 |
| JENNY FLORES EXPEDITING | 1 | 05/08/2022 |
| LEVIN ENGINEERING PLLC | 1 | 04/07/2026 |
| METROPOLIS GROUP INC | 1 | 01/09/2023 |
| MMSR CONSULTING GROUP LLC | 1 | 06/05/2026 |
| SOL BUILDING CONSULTING SERVICES | 1 | 09/03/2024 |
| Z ARCHITECTURE PLLC | 1 | 04/07/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00680157 ↗ | 603 6 AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/31/2022 | 09/01/2026 | Design OUTPOST ARCHITECTURE DPC Contractor A & S SCULLARI CONSTRUCTI | UNDERPINNING FILED IN CONJUNCTION WITH RENOVATION OF 4 STORY RESIDENTIAL BUILDING. ALT-CO FILED UNDER B00680157-I1. SOE FILED UNDER B0068015… |
| B01043132 ↗ | 641 BALTIC STREET BROOKLYN | Alteration | Signed-off | 05/03/2024 | 07/20/2026 | Design GCF CONSULTING ENGINEERS Contractor QBK PLUMBING & HTNG INC | Herewith filing removal, replacement and installation of plumbing fixtures, as per plans submitted. There is no change to use, egress or oc… |
| M00469735 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Permit Issued | 08/25/2021 | 06/30/2026 | Design HER DESIGN ARCHITECTURE PLLC Contractor BROWNSTONE MANAGEMENT LLC | INTERIOR RENOVATION OF APT# 73 INCLUDING MINOR RELOCATION OF INTERIOR PARTITION WALLS, UPDATING AND RELOCATING THE KITCHEN AND KITCHEN FIXTU… |
| B01270953 ↗ | 40 PARK PLACE BROOKLYN | Alteration CO | Permit Issued | 08/22/2025 | 06/17/2026 | Design GCF CONSULTING ENGINEERS Contractor HAPPY CARPENTERS INC | Herewith filing structural work consisting of masonry, steel and framing, as per plans submitted |
| B00672794 ↗ | 603 6 AVENUE BROOKLYN | Alteration | Permit Issued | 09/15/2022 | 05/13/2026 | Design GCF CONSULTING ENGINEERS Contractor A & S SCULLARI CONSTRUCTI | MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATED 4-STORY RESIDENTIAL BUILDING. INSTALL NEW SPLIT MECHANICAL SYSTEM, KITCHEN AND TOILET EX… |
| B01170989 ↗ | 253 WARREN STREET BROOKLYN | Alteration | Permit Issued | 01/27/2025 | 04/20/2026 | Design GCF CONSULTING ENGINEERS Contractor WILLOWFIELD DEVELOPMENT | New mechanical system in conjunction with renovation. |
| B01363858 ↗ | 330 CLERMONT AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 03/27/2026 | — | Design MARTOS ENGINEERING Filer ANTHONY BONSIGNORE, RA | — |
| B01171542 ↗ | 253 WARREN STREET BROOKLYN | Alteration | Permit Issued | 01/27/2025 | 02/02/2026 | Design GCF CONSULTING ENGINEERS Contractor METROTECH MECHANICAL CORP | Sprinkler work in conjunction with alteration |
| Q00762035 ↗ | 12-10 166 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/25/2022 | 01/27/2026 | Design FRAMEWORK ENGINEERING PC Contractor TRI CITY CONSTRUCTION COR | Structural application filed in conjunction with enlarging of one family house filed under job # Q00762035-I1 |
| B00673252 ↗ | 603 6 AVENUE BROOKLYN | Alteration | Permit Issued | 09/15/2022 | 12/23/2025 | Design GCF CONSULTING ENGINEERS Contractor ALTAIR PLUMBING AND HEAT | PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATED 4-STORY RESIDENTIAL BUILDING. INSTALL ALL NEW FIXTURES AND RELATED PIPING. NEW COMBINED DO… |
| M01310811 ↗ | 25 ANN STREET MANHATTAN | Alteration | Filed — no permit on record | 12/15/2025 | — | Design GCF CONSULTING ENGINEERS | — |
| M01232335 ↗ | 117 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 08/10/2025 | 09/24/2025 | Design GCF CONSULTING ENGINEERS Contractor ROSELAND CONSTRUCTION COR | Replace a 54000 BTU/HR split system that is no longer operational. |
| Q00817126 ↗ | 30-33 29 STREET QUEENS | New Building | Permit Issued | 01/23/2023 | 08/06/2025 | Design LEVIN ENGINEERING PLLC Contractor ABACUS BUILDING INNOVATIO Filer Z ARCHITECTURE PLLC | STRUCTURAL DESIGN FOR 7 STORY RESIDENTIAL CONCRETE BUILDING |
| M01098498 ↗ | 2305 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 09/24/2024 | 07/14/2025 | Design GCF CONSULTING ENGINEERS Owner TRG Contractor US LEVIN GRP CORP | SUBSEQUENT FILING FOR MECHANICAL WORK TYPE. |
| B00820727 ↗ | 336 PARK PLACE BROOKLYN | Alteration CO | Permit Issued | 06/22/2023 | 06/06/2025 | Contractor J3R BUILDERS CONTRACTING | SPRINKLER INSTALLATION IN CONJUNCTION WITH RENOVATION OF EXISTING BUILDING. FULLY SPRINKLER THE BUILDING. SPRINKLER WATER SERVICE FILED UNDE… |
| M00419078 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Permit Issued | 09/10/2021 | 05/27/2025 | Design GCF CONSULTING ENGINEERS Contractor BROWNSTONE MANAGEMENT LLC | INSTALL NEW ROOFTOP AC UNIT, AIR HANDLERS AND ASSOCIATED DUCTS AND PIPING, NEW RADIANT HEAT FLOORS AND EXHAUST FANS IN BATHROOMS AND NEW RAD… |
| B00820769 ↗ | 336 PARK PLACE BROOKLYN | Alteration | Signed-off | 06/30/2023 | 05/12/2025 | Design GCF CONSULTING ENGINEERS Contractor HERTLER NADILE P & H, INC | PLUMBING WORK FILED IN CONJUNCTION WITH CONVERSION FROM 3- TO 1-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES & RELATED PIPING. INSTALL NEW CO… |
| B00828221 ↗ | 47 NORTH 8 STREET BROOKLYN | Alteration | Filed — no permit on record | 04/21/2025 | — | Design GCF CONSULTING ENGINEERS Owner Triton Construction | — |
| B01195165 ↗ | 47 NORTH 8 STREET BROOKLYN | Alteration | Filed — no permit on record | 04/21/2025 | — | Design GCF CONSULTING ENGINEERS Owner Triton Construction | — |
| B00828123 ↗ | 47 NORTH 8 STREET BROOKLYN | Alteration | Filed — no permit on record | 04/18/2025 | — | Design OUTPOST ARCHITECTURE DPC | — |
| B00812928 ↗ | 4415 1 AVENUE BROOKLYN | Alteration | Signed-off | 01/25/2023 | 01/31/2025 | Design ALFRED V SAULO, ARCHITECT PC Owner JDS REALTY HOLDINGS, LLC Contractor DELPHI PLUMBING & HEATING Filer VSS CONSULTANTS INC. | SP RELATED WORK ASSOCIATED WITH APPROVED INTERIOR ALTERATON PER APPROVED APPLICATION; B00812928. |
| M00681941 ↗ | 311 WEST 102 STREET MANHATTAN | Alteration | Signed-off | 03/11/2022 | 01/21/2025 | Design GCF CONSULTING ENGINEERS Contractor DV PLUMBING INC Filer GAMILL ENGINEERING, PC | PLUMBING WORK IN CONJUNCTION WITH ALTERATION #M00577861. REPLACE, RELOCATE & NEW PLUMBING AS INDICATED ON PLAN. |
| M01129939 ↗ | 487 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 11/11/2024 | — | Design GCF CONSULTING ENGINEERS | — |
| M00936585 ↗ | 425 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/14/2023 | 11/10/2024 | Design MINIMAL ARCHITECTURE PLLC Contractor APTEL CONSTRUCTION LLC Filer BOUTIQKEY LLC | PLUMBING FOR THE COMBINATION AND RENOVATION OF APARTMENTS 42D AND EXISTING DUPLEX 42C/43C ON THE 42ND AND 43RD FLOORS. AS PER PLANS FILED HE… |
| B01042349 ↗ | 641 BALTIC STREET BROOKLYN | Alteration | Signed-off | 05/03/2024 | 08/27/2024 | Design GCF CONSULTING ENGINEERS Contractor HAPPY CARPENTERS INC | Herewith filing for the installation of a new mechanical system, as per plans submitted. There is no change to use, egress or occupancy und… |
| B00820756 ↗ | 336 PARK PLACE BROOKLYN | Alteration | Signed-off | 06/30/2023 | 06/07/2024 | Design GCF CONSULTING ENGINEERS Contractor J3R BUILDERS CONTRACTING | MECHANICAL WORK FILED IN CONJUNCTION WITH CONVERSION FROM 3- TO 1-FAMILY RESIDENCE. INSTALL SPLIT A/C SYSTEM, EXHAUST FANS. GENERAL CONSTRUC… |
| B00651883 ↗ | 155 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 01/05/2022 | 06/06/2024 | Design GCF CONSULTING ENGINEERS Contractor EXPERT FIRE SPRINKLER,LLC | SPRINKLER ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT, |
| B00644620 ↗ | 155 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 01/05/2022 | 05/13/2024 | Design GCF CONSULTING ENGINEERS Contractor ARANDA PLBG & HTG CORP | plumbing work associate with the vertical and horizontal enlargement of property, Change in dwelling units from 3 to 2. |
| M08016993 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/09/2023 | 04/19/2024 | Design GCF CONSULTING ENGINEERS Owner ALLIED PARTNERS Contractor CENTRAL AIR CONDITIONING Filer METROPOLIS GROUP INC | Mechanical |
| M00417885 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Permit Issued | 09/07/2021 | 03/05/2024 | Design GCF CONSULTING ENGINEERS Contractor A. M. PLUMBING COMPANY | RENOVATION OF KITCHEN, BATHROOMS AND LAUNDRY IN APARTMENT 73 IN CONJUNCTION WITH APT RENOVATION, INCLUDING REPLACEMENT, RELOCATION AND INSTA… |
| X00597793 ↗ | 421 EAST 139 STREET BRONX | Alteration CO | Permit Issued | 10/01/2021 | 02/20/2024 | Design JOHN PATRICK CUNNINGHAM Contractor CMD CONSTR PARTNERS Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR THE RENOVATION AND CONVERSION FROM 1 FAMILY TO 2 FAMILY DWELLING. |
| B00847126 ↗ | 209 STUYVESANT AVENUE BROOKLYN | Alteration | Signed-off | 03/29/2023 | 01/25/2024 | Design GCF CONSULTING ENGINEERS Contractor A C INTERIOR GROUP | Install HVAC system for classrooms in the 3rd Fl. |
| B00618728 ↗ | 363 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 11/05/2021 | 12/15/2023 | Design GCF CONSULTING ENGINEERS Owner 363 WASHINGTON LLC Contractor COPPER MECHANICAL INC | Plumbing work as per plans submitted |
| M00935418 ↗ | 90 MORTON STREET MANHATTAN | Alteration | Signed-off | 10/12/2023 | 10/30/2023 | Design GCF CONSULTING ENGINEERS Contractor AJC SPRINKLER CORP | MINOR SPRINKLER MODIFICATIONS TO EXISTING APARTMENT 6B, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00643430 ↗ | 118 RUTLAND ROAD BROOKLYN | Alteration | Signed-off | 01/27/2022 | 09/14/2023 | Design GCF CONSULTING ENGINEERS Contractor SQUARE INDIGO INC | Install AC units (Condensers) on roof and associated piping and equipment throughout. No change to egress, occupancy or use. |
| M00725261 ↗ | 97 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/26/2022 | 08/22/2023 | Design GCF CONSULTING ENGINEERS Owner REBECCA REALTY MGMT Contractor SIGNORE & SONS PLBG CORP | Install (02) automatic sprinklers on the laundry room. |
| M08023203 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Signed-off | 01/09/2023 | 06/07/2023 | Design GCF CONSULTING ENGINEERS Contractor HI-TECH PLUMBING & HEATIN | RELOCATE KITCHEN AND RENOVATE AND BATHROOMS IN APARTMENT #53. NO CHANGE IN USE, OCCUPANCY OR EGRESS. GC AND MS FILED SEPARATELY. |
| B00618919 ↗ | 363 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 11/09/2021 | 05/31/2023 | Design GCF CONSULTING ENGINEERS Owner 363 WASHINGTON LLC Contractor ARIANA CONTRACTING INC | Installation of sprinkler system as per plans submitted |
| M00871717 ↗ | 2305 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 05/17/2023 | 05/24/2023 | Design GCF CONSULTING ENGINEERS Owner TRG Contractor HF GROUP PLMBG & SPNKLER | PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FILED IN CONJUNCTION WITH ALTERATION APPLICATION #M00811268. NO CHANGE IN USE, EGRESS, BULK OR OCC… |
| M00819511 ↗ | 2305 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 05/09/2023 | 05/18/2023 | Design GCF CONSULTING ENGINEERS Owner TRG Contractor US LEVIN GRP CORP | MECHANICAL WORK FILED IN CONJUNCTION WITH ALTERATION APPLICATION #M00811268. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY UNDER THIS APPLICAT… |
| M08023211 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Signed-off | 01/09/2023 | 04/20/2023 | Design GCF CONSULTING ENGINEERS Contractor FSL PAINTING AND DESIGN | INSTALL NEW KITCHEN & BATHROOM EXHAUST AND REPLACE HVAC SYSTEM IN APARTMENT 53. INSTALL NEW CONDENSER ON ROOF. RELATED GC AND PL FILED SEPAR… |
| M08043512 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Signed-off | 12/28/2022 | 04/20/2023 | Design HER DESIGN ARCHITECTURE PLLC Contractor FSL PAINTING AND DESIGN | RENOVATION OF EXISTING 5TH FLOOR APARTMENT #53. THE SCOPE OF WORK SHALL INCLUDE MINOR RELOCATION OF INTERIOR PARTITION WALLS, RELOCATION OF … |
| B00651828 ↗ | 155 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 01/06/2022 | 03/28/2023 | Design GCF CONSULTING ENGINEERS Contractor ISLAND INTERIORS DESIGN | Mechanical work associated with the renovation/conversion from 3 family 2 family residence with mix use, vertical and horizontal enlargement |
| M08013878 ↗ | 42 WEST 28 STREET MANHATTAN | Alteration | Permit Issued | 10/05/2022 | 03/02/2023 | Design GCF CONSULTING ENGINEERS Contractor PRECISION SPKLR SVCS LLC | INSTALLATION OF FIXTURES FOR 3RD FLOOR TENANT FIT OUT INTERIOR RENOVATION. MODIFY EXISTING SPRINKLER SYSTEM AT 3RD FLOOR INCLUDING NEW SP HE… |
| B00759159 ↗ | 470 PUTNAM AVENUE BROOKLYN | Alteration | Signed-off | 06/20/2022 | 12/15/2022 | Contractor MANRE LLC | Subsequent filing to modify existing sprinkler heads as indicated. |
| M08013903 ↗ | 42 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 10/05/2022 | 12/14/2022 | Design GCF CONSULTING ENGINEERS Contractor PAINTLY CORP | MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION FOR A TENANT FIT OUT AT 3RD FLOOR. |
| M08013906 ↗ | 42 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 10/05/2022 | 12/14/2022 | Design ABRACHITECTURE Contractor PAINTLY CORP | INTERIOR RENOVATION FOR A TENANT FIT OUT AT 3RD FLOOR INCLUDING NONLOAD BEARING PARTITIONS AND FINISHES. |
| M00608439 ↗ | 1153 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2021 | 12/13/2022 | Design AURA ARCHITECTURE D.P.C. Contractor SJB INTERIORS INC | Renovation of existing apartment 6N on floor 007. Architectural work. There is to be no change of use, occupancy, or egress. |
| B00581442 ↗ | 414 5 STREET BROOKLYN | Alteration | Signed-off | 09/27/2021 | 11/23/2022 | Design GCF CONSULTING ENGINEERS Contractor ABR CONSTRUCTION GROUP LL | Herewith filing for the installation of a mechanical system, as per plans submitted. |
| B00673426 ↗ | 603 6 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/15/2022 | — | Design GCF CONSULTING ENGINEERS | — |
| B00618720 ↗ | 363 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 11/05/2021 | 09/12/2022 | Design GCF CONSULTING ENGINEERS Owner 363 WASHINGTON LLC Contractor THINK CONSTRUCTION LLC | Installation of mechanical system with related piping, as per plans submitted. |
| B00790961 ↗ | 101 LAFAYETTE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/07/2022 | — | Design GCF CONSULTING ENGINEERS | — |
| M00732215 ↗ | 40 EAST 80 STREET MANHATTAN | Alteration | Signed-off | 05/18/2022 | 08/05/2022 | Design AURA ARCHITECTURE D.P.C. Contractor 212 RENOVATIONS GROUP LLC | INTERIOR RENOVATION OF APARTMENT 23A ON THE 23RD FLOOR INCLUDING REMOVAL, REPAIR, AND INSTALLATION OF PARTITIONS, FIXTURES, AND FINISHES AS … |
| B00674247 ↗ | 100 JAY STREET BROOKLYN | Alteration | Signed-off | 03/03/2022 | 07/07/2022 | Design WUNDERGROUND LLC Contractor AZCC BUILDERS INC | MODIFICATIONS TO EXISTING PLUMBING SYSTEM IN EXISTING APARTMENT #24A, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00608401 ↗ | 1153 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2021 | 05/21/2022 | Design GCF CONSULTING ENGINEERS Contractor STANLEY RUTH CO LLC | Renovation of existing apartment 6N on floor 007. Mechanical work. There is to be no change of use, occupancy, or egress. |
| M00683867 ↗ | 135 READE STREET MANHATTAN | Alteration | Permit Issued | 03/11/2022 | 04/12/2022 | Design GCF CONSULTING ENGINEERS Owner TRIHILL MANAGEMENT Contractor ORBIT PLBG & HTG INC | Relocate (01) Range, (01) Grill and (01) Fryer. Install (01) New Fryer |
| M00658202 ↗ | 1648 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/16/2022 | 03/31/2022 | Design GCF CONSULTING ENGINEERS Contractor ROSELAND CONSTRUCTION COR | Installation of a new HVAC system for 3 offices |
| M00681892 ↗ | 311 WEST 102 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/11/2022 | — | Design GCF CONSULTING ENGINEERS | — |
| B00322650 ↗ | 737 JEROME STREET BROOKLYN | Alteration | Signed-off | 03/10/2020 | 12/23/2021 | Design GCF CONSULTING ENGINEERS Contractor CRAFTMEN ASSOCIATED CORP | Herewith file plans to installCombi Gas fired boilers, flues and heating elements throughout. |
| B00595323 ↗ | 4415 1 AVENUE BROOKLYN | New Building | Filed — no permit on record | 12/23/2021 | — | Design GCF CONSULTING ENGINEERS Owner JDS REALTY HOLDINGS, LLC Filer VSS CONSULTANTS INC. | — |
| B00339000 ↗ | 737 JEROME STREET BROOKLYN | Alteration | Signed-off | 03/31/2020 | 11/04/2021 | Design GCF CONSULTING ENGINEERS Contractor SAMUEL & SONS P & H INC | relocate 16 fixtures, install 12 fixtures |
| M00516886 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Filed — no permit on record | 11/04/2021 | — | Design GCF CONSULTING ENGINEERS | — |
| B00486373 ↗ | 564 WILSON AVENUE BROOKLYN | New Building | Filed — no permit on record | 08/13/2021 | — | — | |
| M00347618 ↗ | 1864 ADAM C POWELL BLVD MANHATTAN | Alteration | Signed-off | 01/28/2021 | 08/03/2021 | Design GCF CONSULTING ENGINEERS Contractor NIKPRELA CONSTRUCTION COR | Install new HVAC in conjunction with renovation of apartment #63. General Construction and Plumbing filed separately. No change in use, occu… |
| M00489200 ↗ | 25 WEST 54 STREET MANHATTAN | Alteration | Signed-off | 04/12/2021 | 07/26/2021 | Contractor KILLOWEN CONSTRUCTION IN Filer ADAM MAISER | ARCHITECTURAL WORK FILED FOR ENCLOSURE OF EXISTING ELECTRICAL CONDUIT IN 2 HR RATED SHAFT WALL. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B00322562 ↗ | 737 JEROME STREET BROOKLYN | Alteration | Signed-off | 03/10/2020 | 07/12/2021 | Design GCF CONSULTING ENGINEERS Contractor EXPERT FIRE SPRINKLER,LLC | Herewith file plans to install new wet sprinkler system complying to NFPA-13R, 2007 (appex Q) requirements on 1st, 2nd, and basement level. |
| B00347185 ↗ | 430 MAYFAIR DRIVE SOUTH BROOKLYN | Alteration | Signed-off | 06/28/2020 | 07/12/2021 | Design GCF CONSULTING ENGINEERS Contractor IP STATE BUILDER INC | INSTALLATION OF MECHANICAL SYSTEM INCLUDING CONDENSER UNITS, AIR HANDLERS, BOILER, AND ASSOCIATED LOUVERS, DUCTS, FLUES. NO CHANGES TO EGRE… |
| Q00364123 ↗ | 155-02 90 AVENUE QUEENS | Alteration | Signed-off | 08/07/2020 | 12/02/2020 | Design GCF CONSULTING ENGINEERS Owner JT REALTY ADVISORS LLC Contractor AMC PLBG, HTG & CLNG, INC | Proposed renovation of residential units, including kitchens and bathrooms, cellars and exterior walls. No proposed change in use, egress o… |
| M00302277 ↗ | 70 EAST 77 STREET MANHATTAN | Alteration | Signed-off | 02/10/2020 | 10/21/2020 | Design GCF CONSULTING ENGINEERS Contractor LECH W CONSTRUCTION | RENOVATION OF EXISTING RESIDENTIAL APARTMENT 3A ON 3RD FLOOR. MECHANICAL WORK TYPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. ASSOCIATED PLUMB… |
| B00351258 ↗ | 430 MAYFAIR DRIVE SOUTH BROOKLYN | Alteration | Signed-off | 06/28/2020 | 09/03/2020 | Design GCF CONSULTING ENGINEERS Contractor EMR MECHANICAL CORP | INSTALLATION OF ROOF DRAINS AND INTERIOR PLUMBING WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| Q00364166 ↗ | 155-02 90 AVENUE QUEENS | Alteration | Filed — no permit on record | 08/07/2020 | — | Design GCF CONSULTING ENGINEERS Owner JT REALTY ADVISORS LLC | — |
| M00275863 ↗ | 200 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 02/03/2020 | 06/23/2020 | Design ARCHITECTURE AF Contractor SIMPLE CHOICE PLBG AND HT | Installation and modification of plumbing fixtures at existing residence on floor 006. Plumbing Work. There is to be no change of use, occup… |
| M00319958 ↗ | 180 9 AVENUE MANHATTAN | Alteration | Signed-off | 02/26/2020 | 06/18/2020 | Design GCF CONSULTING ENGINEERS Owner BUCHBINDER & WARREN LLC Contractor HENRYSMITH PROPERTY MGMT | INSTALLATION OF HOOD AND ASSOCIATED DUCT WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| B00171360 ↗ | 219 58 STREET BROOKLYN | Alteration | Filed — no permit on record | 10/24/2019 | — | Design GCF CONSULTING ENGINEERS | — |
| B00232884 ↗ | 218 57 STREET BROOKLYN | Alteration | Filed — no permit on record | 10/24/2019 | — | Design GCF CONSULTING ENGINEERS | — |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/14/2026 | Fire-Resistant Penetrations and Joints | 253 WARREN STREET | Giap Flores | special |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | 336 PARK PLACE | Giap Flores | special |
| 06/04/2026 | Structural Stability – Alterations of existing buildings | 336 PARK PLACE | Ivan Luk | special |
| 06/04/2026 | Energy Code Compliance Inspections | 336 PARK PLACE | JOHN GEISLER | progress |
| 06/04/2026 | Fire-Resistance Rated Construction | 336 PARK PLACE | JOHN GEISLER | progress |
| 06/04/2026 | Metering | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Air barrier - visual inspection | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Fenestration and door U-factor and product ratings | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Fenestration air leakage | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Fenestration areas | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Interior lighting power | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Permanent certificate | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 06/04/2026 | Insulation placement and R values | 336 PARK PLACE | JOHN GEISLER | energy_progress |
| 03/25/2026 | HVAC-R and service water piping design and insulation | 330 CLERMONT AVENUE | Giap Flores | energy_progress |
| 03/25/2026 | Energy Code Compliance Inspections | 330 CLERMONT AVENUE | Giap Flores | progress |
| 03/25/2026 | Fire-Resistant Penetrations and Joints | 330 CLERMONT AVENUE | Giap Flores | special |
| 03/25/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 330 CLERMONT AVENUE | Giap Flores | special |
| 02/05/2026 | HVAC-R and service water piping design and insulation | 311 WEST 102 STREET | Giap Flores | energy_progress |
| 02/05/2026 | Fire-Resistant Penetrations and Joints | 311 WEST 102 STREET | Giap Flores | special |
| 01/30/2026 | Mechanical Systems | 641 BALTIC STREET | Giap Flores | special |
| 01/30/2026 | Final | 641 BALTIC STREET | Giap Flores | progress |
| 01/30/2026 | Duct leakage testing, insulation and design | 641 BALTIC STREET | Giap Flores | energy_progress |
| 01/30/2026 | HVAC-R and service water heating equipment | 641 BALTIC STREET | Giap Flores | energy_progress |
| 01/30/2026 | Maintenance information | 641 BALTIC STREET | Giap Flores | energy_progress |
| 01/30/2026 | Shutoff dampers | 641 BALTIC STREET | Giap Flores | energy_progress |
| 01/30/2026 | Fireplaces | 641 BALTIC STREET | Giap Flores | energy_progress |
| 01/30/2026 | HVAC-R and service water heating system controls | 641 BALTIC STREET | Giap Flores | energy_progress |
| 01/12/2026 | HVAC-R and service water piping design and insulation | 311 WEST 102 STREET | Giap Flores | energy_progress |
| 01/12/2026 | Fire-Resistant Penetrations and Joints | 311 WEST 102 STREET | Giap Flores | special |
| 12/08/2025 | Shutoff dampers | 25 ANN STREET | Giap Flores | energy_progress |
| 12/08/2025 | HVAC-R and service water piping design and insulation | 25 ANN STREET | Giap Flores | energy_progress |
| 12/08/2025 | HVAC-R and service water heating system controls | 25 ANN STREET | Giap Flores | energy_progress |
| 12/08/2025 | HVAC-R and service water heating equipment | 25 ANN STREET | Giap Flores | energy_progress |
| 11/24/2025 | Mechanical Systems | 155 WYTHE AVENUE | Giap Flores | special |
| 11/24/2025 | Final | 155 WYTHE AVENUE | Giap Flores | progress |
| 11/24/2025 | Duct leakage testing, insulation and design | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/24/2025 | HVAC-R and service water heating equipment | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/24/2025 | HVAC-R and service water piping design and insulation | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/24/2025 | Fireplaces | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/24/2025 | Shutoff dampers | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/24/2025 | Maintenance information | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/24/2025 | HVAC-R and service water heating system controls | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/10/2025 | Final | 155 WYTHE AVENUE | Giap Flores | progress |
| 11/10/2025 | Mechanical Systems | 155 WYTHE AVENUE | Giap Flores | special |
| 11/10/2025 | Fireplaces | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/10/2025 | HVAC-R and service water heating equipment | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/10/2025 | Maintenance information | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/10/2025 | Duct leakage testing, insulation and design | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/10/2025 | Shutoff dampers | 155 WYTHE AVENUE | Giap Flores | energy_progress |
| 11/10/2025 | HVAC-R and service water piping design and insulation | 155 WYTHE AVENUE | Giap Flores | energy_progress |