1975Year Built
2Stories
W8Building Class
R3-1Zoning
7,422 sfGross Floor Area
1Units
0 Open Violations
Other private school · 11,040 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Roof43p · 2 filings · 20 docs
Floor 340p · 2 filings · 20 docs
Floor 240p · 2 filings · 20 docs
Floor 166p · 5 filings · 20 docs
Cellar39p · 2 filings · 20 docs
Site & exterior58p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS607/08/2026
Bnos Chaya School303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC2209/17/2025
ASHRAF CORP107/13/2023
CAVALRY ASSOCIATES210/27/2022
KL INNOVATIVE DESIGN INC109/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY4403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVALRY LLCGeneral Contractor707/08/2026
ALEF CONSTRUCTION INCGeneral Contractor707/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
KAUFMAN GROUP INCGeneral Contractor107/08/2026
CREATIVE PLUMBING INPlumbing107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAL H CHUN ENGINEER PC19721009/17/2025
M. INT'L ENGINEERING PLLC31291111/05/2024
AR-TECH ENGINEERING, P.C.6659209/01/2021
Building Lifecycle
All (110)Filed (26)Permit Issued (14)Signed Off (8)Violation (6)Inspection (11)Objection (15)Special Inspection (30)
10/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2025
Special inspection requirement — Air barrier — testing
JAMES CHUN
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
10/10/2025
Special inspection requirement — Fenestration air leakage
JAMES CHUN
10/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
10/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JAMES CHUN
10/10/2025
Special inspection requirement — Fenestration areas
JAMES CHUN
10/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
10/10/2025
Special inspection requirement — Insulation placement and R values
JAMES CHUN
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
10/10/2025
Special inspection requirement — Interior lighting power
JAMES CHUN
10/10/2025
Special inspection requirement — Lighting controls
JAMES CHUN
10/10/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JAMES CHUN
09/17/2025
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-A5
09/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
09/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
09/17/2025
Special inspection requirement — Fenestration areas
JAMES CHUN
09/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
09/17/2025
Special inspection requirement — Interior lighting power
JAMES CHUN
09/17/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JAMES CHUN
09/17/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JAMES CHUN
09/17/2025
Special inspection requirement — Fenestration air leakage
JAMES CHUN
09/17/2025
Special inspection requirement — Lighting controls
JAMES CHUN
09/17/2025
Special inspection requirement — Insulation placement and R values
JAMES CHUN
09/17/2025
Special inspection requirement — Air barrier — testing
JAMES CHUN
08/05/2025
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-A4
08/05/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JAMES CHUN
08/05/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JAMES CHUN
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
08/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
05/09/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
03/25/2025
Objection raised — Fire_Protection
03/25/2025
Objection raised — Fire_Protection
03/25/2025
Objection raised — Fire_Protection
03/25/2025
Objection raised — Zoning
03/18/2025
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-A3
01/08/2025
Objection raised — Scope
01/03/2025
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-A2
11/25/2024
Signed off — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-S4
11/25/2024
Signed off — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-S1
11/22/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/14/2024
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-A1
11/07/2024
Permit issued — Curb Cut
S08040396-S4-CC
11/05/2024
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-P9
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Signed off — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-S2
09/25/2024
Objection resolved — Addressed
08/27/2024
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-P8
08/23/2024
Objection raised — Scope
08/15/2024
Filed — Alteration CO
ENLARGEMENT OF EXISTING 2 STORY MIXED USE TO 3 STORY COMMUNITY FACILITY
S08040396-P7
07/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/21/2024
Permit issued — Plumbing
S08040396-S2-EW-SP
06/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
S00901124-I1
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCAVALRY LLC11/07/2024
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP06/21/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS06/14/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC08/30/2023
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC08/30/2023
DOB NOWMechanical SystemsSigned-offCAVALRY LLC08/30/2023
DOB NOWGeneral ConstructionSigned-offCAVALRY LLC08/30/2023
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS07/14/2023
DOB NOWStructuralSigned-offALEF CONSTRUCTION INC07/06/2023
DOB NOWStructuralSigned-offALEF CONSTRUCTION INC07/06/2023
DOB NOWConstruction FencePermit IssuedALEF CONSTRUCTION INC06/30/2023
DOB NOWGeneral ConstructionSigned-offALEF CONSTRUCTION INC11/09/2022
DOB NOWGeneral ConstructionSigned-offKAUFMAN GROUP INC09/15/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN08/20/2021
BIS—ISSUEDALL TIME CONSTRUCTION INC05/13/2015
BISPLISSUEDROCK E SMALL PLBG&HTG INC08/12/2014
BISPLISSUEDROCK E SMALL PLBG&HTG INC04/01/2014
BISMHISSUEDTEAPE CONSTRUCTION SERVIC03/27/2014
BISPLISSUEDROCK E SMALL PLBG&HTG INC06/04/2013
BIS—ISSUEDALL TIME CONSTRUCTION INC04/23/2013
BISEQISSUEDTEAPE CONSTRUCTION SERVIC02/05/2013
BIS—ISSUEDGINERBREAD LEARNING CENTER INC09/16/2008
1 project · most recent 09/17/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2025Signed-offCAVALRY LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM 60,000 BTU · Heat Pump Outdoor ×6
MXZ-SM48NAM 48,000 BTU · Heat Pump Outdoor ×2
PUHY-EP144TNU-A <H> 144,000 BTU · Vrf Outdoor ×2
PUHY-EP168TNU-A <H> 188,000 BTU · Vrf Outdoor ×2
Daikin RXL24UMVJUA 24,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 09/17/2025
Sprinkler System
FiledStatusContractorScope
09/17/2025Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
1 project · most recent 09/17/2025
Storm Water/Sanitary
FiledStatusContractorScope
09/17/2025Signed-offCREATIVE PLUMBING INStorm, Water/Sanitary
3 projects · most recent 07/01/2024
General Wiring
FiledStatusContractorScope
07/01/2024CompleteCONTACT ELECTRIC CORPGeneral Wiring
05/14/2024CompleteDENALI ELECTRIC CORP—
07/05/2023CompleteRICHARD NEU—
1 project · most recent 09/17/2025
Fence
FiledStatusContractorScope
09/17/2025Signed-offCAVALRY LLCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/22/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2023Pass-Final Fence WithdrawalPassView ↗
10/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/10/2025Fenestration areasJAMES CHUNenergy_progress
10/10/2025Air barrier — testing JAMES CHUNenergy_progress
10/10/2025Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
10/10/2025Interior lighting powerJAMES CHUNenergy_progress
10/10/2025Lighting controlsJAMES CHUNenergy_progress
10/10/2025Fenestration air leakageJAMES CHUNenergy_progress
10/10/2025Insulation placement and R valuesJAMES CHUNenergy_progress
10/10/2025Energy Code Compliance InspectionsJAMES CHUNprogress
10/10/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
10/10/2025Exterior Insulation and Finish Systems (EIFS)JAMES CHUNspecial
10/10/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
10/10/2025Construction Operations Influencing Adjacent StructuresJAMES CHUNspecial
10/10/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
09/17/2025Energy Code Compliance InspectionsJAMES CHUNprogress
09/17/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
09/17/2025Air barrier — testing JAMES CHUNenergy_progress
09/17/2025Insulation placement and R valuesJAMES CHUNenergy_progress
09/17/2025Lighting controlsJAMES CHUNenergy_progress
09/17/2025Fenestration air leakageJAMES CHUNenergy_progress
09/17/2025Interior lighting powerJAMES CHUNenergy_progress
09/17/2025Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
09/17/2025Fenestration areasJAMES CHUNenergy_progress
09/17/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
09/17/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
09/17/2025Exterior Insulation and Finish Systems (EIFS)JAMES CHUNspecial
Latest 25 of 150.
▾Documents — 369 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/25/2026S00558603-I1Request digital key ↗
08/25/2026S00586721-I1Request digital key ↗
08/23/2026S08025318-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION17
06/15/2023540250592Open ↗
07/30/2015520106938Open ↗
07/25/2014520106938Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION7
05/14/2015520106938Open ↗
04/07/2014520184915Open ↗
03/28/2014520184915Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS2
03/18/2025540250592Open ↗
11/24/2015520106509Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
10/10/2024540250592Open ↗
07/17/2013520106509Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/28/2014520106938Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
05/13/2013520106509Open ↗
▸Zoning, Tax Lot & Property Records23
▸DOB NOWZD1: DOB Zoning Diagram10
08/13/2026S08040396-A5Open ↗
08/13/2026S08040396-A3Open ↗
08/13/2026S08040396-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)10
08/13/2026S08040396-A4Open ↗
08/13/2026S08040396-A2Open ↗
08/13/2026S08040396-P1Open ↗
Showing 3 of 10 on file for this type
▸BISZONING DIAGRAM1
08/16/2012520106938Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/03/2016520106938Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08040396-I1Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature29
09/05/2026S00586721-I1Open ↗
09/02/2026S08040396-P5Open ↗
09/02/2026S08040396-P5Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/25/2026S00558603-I1Open ↗
08/23/2026S00893393-P2Open ↗
08/23/2026S00893393-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/05/2026S00586721-I1Open ↗
09/02/2026S08040396-P5Open ↗
09/02/2026S08040396-P9Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/17/2015520106938Open ↗
07/14/2015520106938Open ↗
06/26/2014520184915Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/20/2014520184915Open ↗
10/16/2012520112994Open ↗
07/26/2012520106938Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/16/2012520112994Open ↗
07/26/2012520106938Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/20/2014520184915Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/15/2023540250592Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/15/2023540250592Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING4
08/23/2013520106938Open ↗
08/09/2013520106938Open ↗
07/26/2012520106938Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
08/15/2014520106938Open ↗
06/09/2014520184915Open ↗
09/11/2013520106938Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/25/2014520106938Open ↗
02/20/2014520184915Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/09/2014520184915Open ↗
▸BISEQUIPMENT USE PERMITS1
06/26/2014520184915Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/31/2014520144344Open ↗
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist10
08/13/2026S08040396-A3Open ↗
08/13/2026S08040396-A2Open ↗
08/13/2026S08040396-P4Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
11/24/2015520106509Open ↗
11/06/2015520106938Open ↗
▸BISSTREET TREE CHECKLIST2
07/26/2012520106938Open ↗
05/30/2008510037381Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
02/03/2016520106938Open ↗
▸BISSTREET TREES SITE PLAN1
01/25/2016520106938Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/26/2008510037381Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08040396-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/25/2026S00558603-I1Open ↗
08/23/2026S00893393-P2Open ↗
08/23/2026S00893393-I1Open ↗
Showing 3 of 23 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/16/2013520144344Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/23/2012520106938Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/02/2008510037381Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/17/2015520106938Open ↗
06/26/2014520184915Open ↗
02/20/2014520184915Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/03/2016520106938Open ↗
07/22/2015520106938Open ↗
06/26/2014520184915Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/24/2024540250592Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/15/2023540250592Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
10/10/2024540250592Open ↗
07/17/2013520106509Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/17/2015520106938Open ↗
08/16/2012520106938Open ↗
▸BISSOIL PERCOLATE TEST-DRY WELL RS16-P1131
08/23/2012520106938Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/16/2012520106938Open ↗
▸BISPROVIDE CONCRETE DELIVERY TICKET.1
03/18/2025540250592Open ↗
▸BISBPP: FIELD INSPECTION1
03/18/2025540250592Open ↗
▸BISBORINGS - TEST PITS (TR-4) 27-7201
08/23/2012520106938Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/23/2026S00893393-P2Open ↗
08/23/2026S00893393-I1Open ↗
08/23/2026S00893393-P1Open ↗
Showing 3 of 26 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/03/2016520106938Open ↗
11/06/2015520106938Open ↗
07/24/2015520106938Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/20/2014520184915Open ↗
07/03/2013520144344Open ↗
10/16/2012520112994Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/30/2015520106938Open ↗
07/26/2012520106938Open ↗
05/19/2008510037381Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff3
03/18/2025540250592Open ↗
10/10/2024540250592Open ↗
07/17/2013520106509Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT6
02/03/2016520106938Open ↗
08/21/2014520144344Open ↗
06/26/2014520184915Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/14/2015520106938Open ↗
04/30/2013520106938Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
03/18/2025540250592Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
11/24/2015520106509Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
02/20/2014520184915Open ↗
07/03/2013520144344Open ↗
10/16/2012520112994Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
11/01/2013520106938Open ↗
05/14/2013520106509Open ↗
07/26/2012520106938Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
06/15/2023540250592Open ↗
07/17/2013520106509Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/15/2023540250592Open ↗
▸Other Documents52
▸DOB NOWSite Survey: Initial10
08/13/2026S08040396-A5Open ↗
08/13/2026S08040396-A2Open ↗
08/13/2026S08040396-A1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWPlot Diagram10
08/13/2026S08040396-P7Open ↗
08/13/2026S08040396-A1Open ↗
08/13/2026S08040396-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification10
08/18/2026S08040396-I1Open ↗
08/18/2026S08040396-P3Open ↗
08/18/2026S08040396-A4Open ↗
Showing 3 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/24/2015520106509Open ↗
08/07/2013520106509Open ↗
08/07/2013520106509Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
10/10/2024540250592Open ↗
10/10/2024540250592Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
03/18/2025540250592Open ↗
▸BISPLOT DIAGRAM1
07/26/2012520106938Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/18/2025540250592Open ↗
▸BISBPP: WAIVER OF GRADE FILING1
06/25/2013520106509Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/10/2024540250592Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/15/2023540250592Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08040396-I1Open ↗