← Back
Elevator cooperative
300 WEST 83 STREET
MANHATTAN · Upper West Side (Central) · BIN 1033803
💬 Discuss this project
1924Year Built
15Stories
D4Building Class
R10AZoning
99,435 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized144 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 473 OWNERS CORP · 7,950 sf lot · 12.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 15 docs
Floor 142 filings
Floor 13
Floor 12
Floor 114p · 1 filing
Floor 101 filing
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing
Floor 3
Floor 21 filing
Floor 11 filing
Cellar1p · 1 filing · 3 docs
Site & exteriorUnder Construction3 filings · 11 docs
Filed — no permit issued1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.5109/17/2026
473 OWNERS3103/22/2026
C O MIDBORO MANAGEMENT1603/21/2026
RSP Companies907/08/2026
C O AKAM ASSOCIATES303/21/2026
473 WEST END OWNERS203/21/2026
BMH REALTY LTD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOWARD L ZIMMERMAN ARCHITECTS1203/21/2026
JENNY FLORES EXPEDITING503/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
CJS EXPEDITING203/21/2026
NEW YORK DESIGN ARCHITECTS203/21/2026
RIMKUS NEW YORK PLLC203/21/2026
ASAP ASSOCIATES CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor609/10/2026
SYSTEMS 2000 PLUMBING SERGeneral Contractor603/21/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing407/08/2026
SEAMLESS BUILDERS INCGeneral Contractor303/21/2026
A W R GROUP INCGeneral Contractor309/17/2026
AERO ELECTRIC CORPElectrical203/21/2026
G.BASSOLINO PLUMBING LTDFire Protection107/08/2026
AATZ CONTRACTING INCGeneral Contractor107/08/2026
ZORAN VUJICICElectrical103/21/2026
FISHBAUM, LEONARDElectrical103/21/2026
BENJAMIN ROSE BUILD DESIGNGeneral Contractor107/08/2026
HOME SOLUTIONS INCGeneral Contractor107/08/2026
NU-WAY HEATING & COOLINGGeneral Contractor104/09/2026
REAL DEAL DECORATION LLCGeneral Contractor107/08/2026
FELIX ALEXISElectrical103/21/2026
EL GHAZIRI, ASSEMElectrical103/21/2026
CARRERAS HOME IMPROV INCPlumbing107/08/2026
COSME PLBG & HTG CORPPlumbing107/08/2026
GEORGE BASSOLINOPlumbing103/21/2026
ALEXIS FELIXElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665308/04/2026
HOWARD L ZIMMERMAN ARCHIT1712605/18/2026
RIMKUS NEW YORK, PLLC8123304/28/2026
A2 ARCHITECT, PC2504505/07/2025
STRUCT. ENGINEERING INTEG4174106/13/2022
THEODORE G RIEPER ARCHITE4447112/27/2021
Building Lifecycle
All (206)Filed (26)Permit Issued (26)Signed Off (9)Facade (FISP) (21)Violation (60)Inspection (15)Objection (19)Special Inspection (30)
09/16/2026
Permit issued — General Construction
M01380474-I1-GC
09/09/2026
Permit issued — Sidewalk Shed
M01409582-I1-SH
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
C
08/26/2026
Violation issued (HPD, open)
A
08/24/2026
Violation issued (ECB, open)
Construction
08/12/2026
Permit issued — Suspended Scaffold
M01437394-I1-SC
08/04/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair with material hoist.
M01437394-I1
07/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/13/2026
Permit issued — General Construction
M01380474-I1-GC
07/01/2026
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repair with material hoist.
M01119317-I1
06/30/2026
Objection resolved — Resolved
06/20/2026
Violation issued (ECB, closed)
Cranes and Derricks
06/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01409582-I1
06/16/2026
Permit issued — Sidewalk Shed
M01409582-I1-SH
06/11/2026
Objection raised — Scope
05/18/2026
Filed — Alteration
New domestic gas system. New gas master meter installation. No change in egress, use or occupancy.
M01107943-P1
05/04/2026
Signed off — Alteration
New sprinkler installation for laundry room. No change in use, egress or occupancy.
M01326673-I1
05/04/2026
Permit issued — Plumbing
M01107943-I1-PL
04/28/2026
Filed — Alteration
Exterior facade repairs and reconstruction as necessary and per plans submitted. No Change in use, occupancy or egress proposed under this application.
M01380474-I1
04/17/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
04/17/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
04/10/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair with material hoist.
M01119317-P2
03/30/2026
Special inspection requirement — Final
JAMES MONAHAN
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MONAHAN
03/30/2026
Special inspection requirement — Masonry
JAMES MONAHAN
03/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Cycle 10 facade report signed — SWARMP
01/12/2026
Permit issued — Sprinklers
M01326673-I1-EW-SP
01/12/2026
Cycle 10 facade inspection completed
12/02/2025
Filed — Alteration
New sprinkler installation for laundry room. No change in use, egress or occupancy.
M01326673-I1
12/01/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01114943-I1
11/17/2025
Cycle 10 facade report submitted
10/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/22/2025
Violation issued (HPD, open)
A
10/22/2025
Violation issued (HPD, open)
A
10/22/2025
Violation issued (HPD, open)
A
10/22/2025
Violation issued (HPD, open)
B
10/22/2025
Violation issued (HPD, open)
A
10/21/2025
Signed off — Alteration
HERBEY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN APARTMENT 4B LOCATED ON THE 4TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01119696-S3
10/21/2025
Signed off — Alteration
HERBEY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN APARTMENT 4B LOCATED ON THE 4TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01119696-I1
10/17/2025
Signed off — Alteration
HERBEY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN APARTMENT 4B LOCATED ON THE 4TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01119696-S1
09/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2025
Permit issued — Sidewalk Shed
M01114943-I1-SH
09/13/2025
Violation issued (HPD, open)
B
09/13/2025
Violation issued (HPD, open)
A
09/13/2025
Violation issued (HPD, open)
A
09/13/2025
Violation issued (HPD, open)
B
09/13/2025
Violation issued (HPD, open)
A
09/13/2025
Violation issued (HPD, open)
A
09/13/2025
Violation issued (HPD, open)
B
09/13/2025
Violation issued (HPD, open)
A
09/13/2025
Violation issued (HPD, open)
A
09/13/2025
Violation issued (HPD, open)
C
09/13/2025
Violation issued (HPD, open)
B
Latest 60 of 206 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA W R GROUP INC09/16/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/09/2026
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC08/12/2026
DOB NOWGeneral ConstructionPermit IssuedA W R GROUP INC07/13/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/16/2026
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL05/04/2026
DOB NOWSprinklersSigned-offG.BASSOLINO PLUMBING LTD01/12/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/22/2025
DOB NOWSuspended ScaffoldSigned-offA W R GROUP INC09/02/2025
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL08/13/2025
DOB NOWGeneral ConstructionPermit IssuedSYSTEMS 2000 PLUMBING SER08/13/2025
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL06/30/2025
DOB NOWGeneral ConstructionSigned-offA W R GROUP INC06/20/2025
DOB NOWMechanical SystemsSigned-offNU-WAY HEATING & COOLING05/09/2025
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC10/24/2024
DOB NOWGeneral ConstructionSigned-offWISE CONSTRUCTION SAFETY10/23/2024
DOB NOWPlumbingSigned-offCARRERAS HOME IMPROV INC10/23/2024
DOB NOWSuspended ScaffoldSigned-offA W R GROUP INC10/15/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/25/2024
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL09/10/2024
DOB NOWGeneral ConstructionPermit IssuedSYSTEMS 2000 PLUMBING SER08/21/2024
DOB NOWGeneral ConstructionSigned-offHOME SOLUTIONS03/21/2023
DOB NOWPlumbingPermit IssuedCOSME PLBG & HTG CORP03/31/2022
DOB NOWGeneral ConstructionPermit IssuedAATZ CONTRACTING INC03/25/2022
DOB NOWGeneral ConstructionSigned-offSEAMLESS BUILDERS INC02/25/2022
DOB NOWGeneral ConstructionSigned-offBENJAMIN ROSE BUILD DESIG05/27/2021
BISOTISSUEDARTHUR LANGE CONS INC10/20/2020
BISMHISSUEDNORTHLAKE CONSTRUCTION10/06/2020
BISPLISSUEDNEW YORK STANDARD MECH CORP06/11/2020
BISOTISSUEDNORTHLAKE CONSTRUCTION10/01/2019
BISPLISSUEDMACREDDIN PLBG & HTG INC03/27/2019
BISOTISSUEDNORTHLAKE CONSTRUCTION03/26/2019
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT08/31/2018
BISEQISSUEDCS BRIDGE CORP05/15/2018
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT01/11/2018
BISMHISSUEDICS BUILDERS, INC10/30/2017
BISOTISSUEDRENOTAL CONSTRUCTION INC10/11/2017
BISPLISSUEDDEMAR PLUMBING CORP09/25/2017
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT08/21/2017
BISOTISSUEDRENOTAL CONSTRUCTION INC08/10/2017
+ 36 more permits on file
4 projects · most recent 05/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/18/2026Signed-offSYSTEMS 2000 PLBG SVCS LLGas
05/01/2025Signed-offSYSTEMS 2000 PLBG SVCS LLWater/Sanitary
12/27/2021Permit IssuedCOSME PLBG & HTG CORPWater/Sanitary
06/06/2021——Water/Sanitary
14 projects · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026Permit IssuedK & G ELECTRIC CO., INCGeneral Wiring
05/28/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
05/06/2026Permit IssuedA TO Z NY ELECTRICAL CONTRACTOR INCGeneral Wiring
02/11/2026CompleteWISE ELECTRIC SOLUTIONSGeneral Wiring
01/07/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
10/02/2024CompleteBOROWIDE ELECT'L CONTR'S—
07/26/2024Permit IssuedELECTL CONTG SOLUTIONS CO—
03/28/2023CompleteGLENDALE ELECTL CONTNG IN—
01/17/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
06/06/2021CompleteHORSEPOWER ELECTRIC.&General Wiring
10/20/2020Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
09/18/2019CompleteLEONE ELECTRIC CO. INCGeneral Wiring
03/30/2019CompleteCAVAN ELECTRIC CORP.General Wiring
08/31/2018Permit IssuedKOPP ELECTRIC CORPGeneral Wiring
1 project · most recent 06/16/2026
Sidewalk Shed
FiledStatusContractorScope
06/16/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
2 projects · most recent 08/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/04/2026Permit IssuedA W R GROUP INCSuspended Scaffold (SC)
04/10/2026Signed-offA W R GROUP INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/17/2026Post-installed AnchorsKarol Zdancewiczspecial
04/17/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/30/2026FinalJAMES MONAHANprogress
03/30/2026Tenant Protection Plan ComplianceJAMES MONAHANspecial
03/30/2026MasonryJAMES MONAHANspecial
05/08/2025Tenant Protection Plan ComplianceJon Colatrellaspecial
05/08/2025Tenant Protection Plan ComplianceJon Colatrellaspecial
05/08/2025FinalJon Colatrellaprogress
05/08/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
05/02/2025Maintenance informationAnn Macklinenergy_progress
05/02/2025HVAC-R and service water piping design and insulationAnn Macklinenergy_progress
05/02/2025HVAC-R and service water heating system controlsAnn Macklinenergy_progress
05/02/2025HVAC-R and service water heating equipmentAnn Macklinenergy_progress
05/02/2025Energy Code Compliance InspectionsAnn Macklinprogress
04/30/2025Tenant Protection Plan Compliance—special
04/30/2025Tenant Protection Plan Compliance—special
04/30/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
04/30/2025FinalJon Colatrellaprogress
02/18/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
02/14/2025FinalAnn Macklinprogress
02/14/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
02/14/2025Energy Code Compliance InspectionsAnn Macklinprogress
02/14/2025Lighting in dwelling unitsAnn Macklinenergy_progress
02/10/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
02/10/2025Lighting in dwelling unitsAnn Macklinenergy_progress
Latest 25 of 44.
▾Documents — 516 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch25
09/04/2026M00490106-I1Request digital key ↗
09/02/2026M00679308-I1Request digital key ↗
08/26/2026M00942597-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00454312-I1Request digital key ↗
▸Applications & Permits118
▸BISPLAN / WORK APPROVAL APPLICATION53
12/23/2021120552918Open ↗
10/16/2020140947037Open ↗
07/17/2020123600362Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION46
10/20/2020140947037Open ↗
10/06/2020123600362Open ↗
09/30/2020123600362Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWLPC Approval/Permit19
09/04/2026M00490106-I1Open ↗
08/26/2026M00942597-I1Open ↗
08/26/2026M00942597-S1Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications114
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
03/19/2020102249345Open ↗
03/06/2020102249345Open ↗
05/15/2019140494882Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/04/2026M01119696-S3Open ↗
09/04/2026M01119696-S3Open ↗
09/04/2026M01119696-S3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/04/2026M00490106-I1Open ↗
09/03/2026M00454312-I1Open ↗
09/03/2026M00644530-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/04/2026M01119696-S3Open ↗
09/02/2026M01380474-I1Open ↗
09/02/2026M01380474-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/12/2016140494882Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/09/2020140947037Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/12/2016140494882Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/12/2016140494882Open ↗
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING10
07/17/2020123600362Open ↗
06/25/2020102249345Open ↗
06/22/2020102249345Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
03/20/2020123600362Open ↗
03/06/2020102249345Open ↗
03/05/2020123600362Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes7
09/09/2020140947037Open ↗
08/21/2018123600362Open ↗
05/02/2018123600362Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/02/2018122811056Open ↗
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/04/2026M00490106-I1Open ↗
09/03/2026M00454312-I1Open ↗
08/26/2026M00942597-S1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
09/30/2020140947037Open ↗
09/09/2020140947037Open ↗
05/02/2018123600362Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/24/2026M01097154-I1Open ↗
08/13/2026M00942597-I1Open ↗
08/13/2026M00942597-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
05/02/2018123600362Open ↗
08/14/2017123324688Open ↗
07/21/2016122811056Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/23/2021140947037Open ↗
06/23/2021140947037Open ↗
09/09/2020140947037Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/13/2020123600362Open ↗
07/29/2016122403265Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/04/2026M00490106-I1Open ↗
08/13/2026M00454312-I1Open ↗
08/13/2026M00679308-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/09/2020140947037Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/23/2021140947037Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/12/2016140494882Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY12
06/23/2021140947037Open ↗
06/23/2021140947037Open ↗
06/23/2021140947037Open ↗
Showing 3 of 12 on file for this type
▸BISFINAL INSPECTION2
06/23/2021140947037Open ↗
10/09/2020140947037Open ↗
▸Approvals, Objections & Sign-offs46
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
06/23/2021140947037Open ↗
10/08/2020123600362Open ↗
07/24/2020122751469Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
06/12/2020102249345Open ↗
05/15/2019140494882Open ↗
05/16/2018140494882Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL6
09/30/2020140947037Open ↗
08/21/2018123600362Open ↗
08/11/2017123324688Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
05/16/2018140494882Open ↗
07/18/2017122751469Open ↗
Showing 2 of 3 on file for this type
▸BISLANDMARKS SIGNOFF2
06/23/2021140947037Open ↗
10/08/2020123600362Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
05/16/2018140494882Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
06/23/2021140947037Open ↗
10/08/2020123600362Open ↗
09/09/2020140947037Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms49
▸BISEFILING COVER SHEET17
10/16/2020140947037Open ↗
05/02/2018123600362Open ↗
07/21/2016122811056Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION17
09/30/2020140947037Open ↗
01/07/2020123600362Open ↗
05/22/2019123324688Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM13
06/12/2020102249345Open ↗
03/20/2020123600362Open ↗
03/19/2020102249345Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/12/2016140494882Open ↗
Showing 1 of 2 on file for this type
▸Other Documents19
▸DOB NOWManufacturer's Specifications4
08/26/2026M01119317-I1Open ↗
08/26/2026M01119317-P2Open ↗
08/16/2026M01437394-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/26/2026M01119317-I1Open ↗
08/26/2026M01119317-P2Open ↗
08/16/2026M01437394-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/26/2026M00942597-I1Open ↗
08/13/2026M01107943-I1Open ↗
08/13/2026M01107943-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/06/2020123600362Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/23/2021140947037Open ↗
10/20/2020140947037Open ↗
▸BISAS PER 1 RCNY 102-04 PAY THE VIOLATION_35477674M1
10/09/2020140947037Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00454312-I1Open ↗