← Back
BuildNYC
Elevator cooperative
Second Atlantic Terminal Housing Corporation
475 CARLTON AVENUE · Fort Greene · BIN 3321981
💬 Discuss this project
1974Year Built
15Stories
D4Building Class
R7-2Zoning
476,450 sfGross Floor Area
306Units
LL97 CoveredRent Stabilized388 Active Violations 372 unresolved · 16 paperwork only 2 likely answered 6 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator cooperative · Owner of record: Second Atlantic Terminal Housing · 125,150 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPrestige Management INC.Under Construction2 filings
RoofPrestige Management INC.Under Construction3p · 2 filings · 16 docs
Floor 1Prestige Management INC.Under Construction1p · 2 filings · 3 docs
CellarPrestige Management INC.Under Construction2p · 4 filings · 3 docs
Site & exteriorPrestige Management INC.Under Construction2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Second Atlantic Terminal Housing603/21/2026
NYC Housing Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lawless & Mangione707/21/2026
APT104/20/2026
G R Restivo AIA104/10/2026
Rimkus206/06/2025
Wavic Engineering105/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & Associates603/21/2026
Kma Designs403/21/2026
Riggining Consultants103/21/2026
Smep Design & Consultation203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structural Preserv SystemGeneral Contractor407/10/2026
Kings Group NYScaffold410/04/2026
Metro Fire Protection HoldingFire Protection306/28/2026
Harley Plumbing & HeatingPlumbing207/08/2026
RC3 Electricspecialty_contractor108/22/2026
C C Controlled CombustionGeneral Contractor107/28/2026
RC3 ElectricElectrical103/21/2026
Chiappa RichardElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting16881007/21/2026
Amaracon Testing & Inspec5842104/20/2026
Socotec Engineering4983304/14/2026
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/08/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 7E, 7th STORY, 4th APARTMENT FROM SOUTH AT WEST
HPD violation · open
09/04/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B01200760-I1-SH
08/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/21/2026
Permit issued — Antenna
B01375662-I1-AN
267 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/04/2026
DOB NOWAntennaPermit IssuedRC3 Electric08/21/2026
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System08/11/2026
DOB NOWMechanical SystemsPermit IssuedC C Controlled Combustion07/27/2026
DOB NOWStructuralPermit IssuedStructural Preserv System07/09/2026
DOB NOWStandpipePermit IssuedMetro Fire Protection Holding06/26/2026
DOB NOWSprinklersPermit IssuedMetro Fire Protection Holding06/26/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/22/2026
DOB NOWSprinklersPermit IssuedMetro Fire Protection Holding04/22/2026
DOB NOWPlumbingPermit IssuedHarley Plumbing & Heating04/21/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/25/2026
DOB NOWPlumbingPermit IssuedHarley Plumbing & Heating12/19/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System12/15/2025
DOB NOWStructuralPermit IssuedStructural Preserv System07/11/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/02/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System04/29/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/27/2025
BISOTISSUEDGreat American Construction Services09/02/2020
BISOTISSUEDSquan Construction Services11/21/2017
BISOTISSUEDSquan Construction Services01/03/2017
BISOTISSUEDFutura Builders Group12/06/2011
BISEQISSUEDMSS Cconstruction04/03/2008
BISEQISSUEDMSS Cconstruction02/06/2008
BISOTISSUEDFutura Builders Group09/28/2007
BISEQISSUEDMSS Cconstruction06/19/2007
BISEQISSUEDColgate01/30/2007
BISOTRE-ISSUEDAlpine Construction & Developmnt10/02/2003
BISEQISSUEDColgate Scaffolding & Equipment03/26/2002
1 project · most recent 07/21/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/21/2026Permit IssuedC C Controlled CombustionAir Conditioning Systems, Ventilation Systems
2 projects · most recent 04/10/2026
FiledStatusContractorScope
04/10/2026Permit IssuedMetro Fire Protection Holding—
05/22/2025Permit IssuedMetro Fire Protection Holding—
1 project · most recent 09/17/2024
Water/Sanitary
FiledStatusContractorScope
09/17/2024Permit IssuedHarley Plumbing & HeatingWater/Sanitary
3 projects · most recent 06/08/2025
General Wiring
FiledStatusContractorScope
06/08/2025Permit IssuedRegional Electrical VoiceGeneral Wiring
04/15/2025Permit IssuedHigh Quality Electric of NYC—
01/22/2020Permit IssuedAll Ways Electric Corp.w—
1 project · most recent 06/06/2025
Sidewalk Shed
FiledStatusContractorScope
06/06/2025Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 04/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/14/2026Permit IssuedStructural Preservation SystemSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/21/2026Energy Code Compliance Inspectionsjamal tahaprogress
07/21/2026HVAC-R and service water piping design and insulationjamal tahaenergy_progress
07/21/2026HVAC-R and service water heating equipmentjamal tahaenergy_progress
07/21/2026HVAC-R and service water heating system controlsjamal tahaenergy_progress
07/21/2026Maintenance informationjamal tahaenergy_progress
07/21/2026Finaljamal tahaprogress
07/21/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/21/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/21/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
05/07/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
05/07/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
05/07/2026Energy Code Compliance Inspectionsjamal tahaprogress
05/07/2026HVAC-R and service water piping design and insulationjamal tahaenergy_progress
05/07/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
05/07/2026Finaljamal tahaprogress
05/07/2026HVAC-R and service water heating equipmentjamal tahaenergy_progress
05/07/2026Maintenance informationjamal tahaenergy_progress
05/07/2026HVAC-R and service water heating system controlsjamal tahaenergy_progress
04/23/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
04/23/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
04/13/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
04/13/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
09/15/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 37.
138 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account