Miscellaneous religious facility
Salvadori Center
475 RIVERSIDE DRIVE · Morningside Heights · BIN 1059835
💬 Discuss this project
1958Year Built
19Stories
M9Building Class
R8Zoning
571,200 sfGross Floor Area
82Units
LL97 Covered0 Active ViolationsFISP: SAFE
Miscellaneous religious facility · Owner of record: Interchurch Center · 32,367 sf lot · 17.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInterchurch Center CORP.1p · 1 filing · 8 docs
Floor 19New office creation, 19th floor1 filing
Floor 18JICUF Japan ICU Foundation Japan ICU Foundations, Interfaith15p · 2 filings · 17 docs
Floor 17MMBB A Financial Services MinistryUnder Construction5p · 1 filing · 16 docs
Floor 16MMBB A Financial Services MinistryUnder Construction11p · 1 filing · 16 docs
Floor 15MMBB A Financial Services Ministry, United Methodist WomenUnder Construction34p · 5 filings · 16 docs
Floor 14
Floor 13WOS Workforce Opportunity Services5p · 1 filing · 5 docs
Floor 12African American Policy Forum, Children's Aid29p · 4 filings · 17 docs
Floor 11Alcoholics Anonymous20p · 4 filings · 17 docs
Floor 10
Floor 9
Floor 8The Interchurch Center, Columbia University Interchurch +3Under Construction89p · 13 filings · 17 docs
Floor 7Church World Service30p · 5 filings · 17 docs
Floor 6Children's Health Fund10p · 3 filings · 18 docs
Floor 5Columbia University Interchurch44p · 5 filings · 17 docs
Floor 4The Interchurch CenterUnder Construction33p · 2 filings · 16 docs
Floor 3Columbia University in the City of New York4p · 2 filings · 11 docs
Floor 2The Interchurch Center, Foundation for Child DevelopmentUnder Construction7p · 4 filings · 15 docs
Floor 1The Interchurch CenterUnder Construction51p · 4 filings · 15 docs
Sub-CellarThe Interchurch Center9p · 1 filing · 9 docs
Site & exteriorInterchurch Center CORP.21p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Interchruch Center89310/17/2026
AA World Service603/21/2026
United Church Funds603/21/2026
Grubb and Ellis Co303/21/2026
Barnard College103/22/2026
Power Cooling103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Burnham Nationwide6003/21/2026
Codegreen403/21/2026
KM Associates of New York3403/21/2026
EDG503/21/2026
CPS Service303/21/2026
Construction Permit Services203/21/2026
Christopher Teeter RA403/21/2026
Meridian Code Consultants603/21/2026
AE Design Solution603/21/2026
Robert R Bisaccia1203/21/2026
K & M Associates3403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
John Gallin & SonGeneral Contractor3607/08/2026
SPK/Lewis ConstructionGeneral Contractor2510/17/2026
Abco-Peerless SprinklerFire Protection710/04/2026
Clune Construction CoGeneral Contractor708/08/2026
Spring ScaffoldingScaffold707/08/2026
Par Plumbing CoPlumbing707/08/2026
York Interiors GroupGeneral Contractor603/21/2026
Sirina Fire ProtectionFire Protection507/08/2026
S.B.A. PlumbingPlumbing507/08/2026
Power CoolingGeneral Contractor403/21/2026
Ideal Interiors GroupGeneral Contractor407/08/2026
Par Fire ProtectionFire Protection307/08/2026
P.E. StoneElectrical303/22/2026
Lawrence J. LevineFire Protection203/21/2026
Fresh Meadow Electrical ContractingElectrical203/21/2026
W.J. Regan & CompanyGeneral Contractor207/08/2026
Mac FelderPlumbing207/08/2026
John Gallin & SonScaffold107/08/2026
Colony Electric CoElectrical103/21/2026
Pem ElectricalElectrical103/21/2026
Aggressive Fire ProtectionFire Protection107/08/2026
George Breslaw PlumbingPlumbing107/08/2026
Hydronic Concepts NY P&HPlumbing107/08/2026
Hydronic Concepts NY PlumbingFire Protection107/08/2026
Skyline Restorationspecialty_contractor107/08/2026
P. E. StoneElectrical103/21/2026
Bigman BrothersElectrical103/21/2026
Preferred Sprinkler and MechanicalFire Protection107/08/2026
S.B.A. PlumbingFire Protection107/02/2026
Arcadia Elect'l CoElectrical103/22/2026
Abco-Peerless SprinklerPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Carusone & Cherres Architects6166110/16/2026
AK Engineering678609/18/2026
Laurence G. Jones Architects5560907/21/2026
Avcon Engineering548602/02/2026
Z & T Engineering591202/02/2026
Crosscheck Inspection Services5443411/17/2025
Downtown Engineers9711109/29/2025
Ryan Special Engineering20181009/04/2025
MEP Inspections1102303/13/2024
Vibranalysis Inc., Dba VT6864111/22/2023
Emtg Consultants42221202/22/2023
Ola Consulting Engineers1955103/10/2022
Sag Engineering & Consulting608602/14/2020
Joseph Martines PE1428201/30/2020
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (37)Facade (FISP) (5)Violation (2)Inspection (36)Objection (30)Special Inspection (30)
10/16/2026
Filed — Alteration
PROPOSED MINOR INTERIOR NON-STRUCTURAL ALTERATION TO CREATE ONE NEW APPROX. 180 SF OFFICE WITHIN EXISTING OFFICE SUITE 1935 ON THE 19TH FLOOR, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01469916-I1
10/16/2026
Permit issued — Mechanical Systems
M01425195-S1-MS
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
10/05/2026
Special inspection requirement — Final
JORGE CHERRES
09/30/2026
Signed off — Alteration
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01257440-I1
09/30/2026
Signed off — Alteration
PLUMBING MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01257443-I1
09/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/28/2026
Permit issued — Sprinklers
M01425195-S2-EW-SP
09/18/2026
Filed — Alteration
INTERIOR RENOVATION OF 4TH & 8TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
M01425195-S1
09/18/2026
Filed — Alteration
INTERIOR RENOVATION OF 4TH & 8TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
M01425195-S2
08/12/2026
Permit issued — General Construction
M01425195-I1-GC
08/07/2026
Permit issued — General Construction
M01257433-I1-GC
08/03/2026
Special inspection requirement — Lighting controls
Ari Kamo
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
08/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
07/27/2026
Signed off — Alteration
mechanical modifications to an existing commercial space
M00953359-S3
07/24/2026
Signed off — Alteration
mechanical modifications to an existing commercial space
M00953359-I1
07/21/2026
Filed — Alteration
INTERIOR RENOVATION OF 4TH & 8TH FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.
M01425195-I1
07/20/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Admin
07/02/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
07/02/2026
Special inspection requirement — Final
Ari Kamo
06/30/2026
Permit issued — Plumbing
M01397591-S3-PL
06/30/2026
Permit issued — Sprinklers
M01397591-S4-EW-SP
06/29/2026
Permit issued — Mechanical Systems
M01397591-S2-MS
06/29/2026
Special inspection requirement — Final
Laurence Jones
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Laurence Jones
06/26/2026
Filed — Alteration
PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH.
M01397591-S3
06/26/2026
Filed — Alteration
PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH.
M01397591-S4
06/26/2026
Filed — Alteration
PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH.
M01397591-S2
06/24/2026
Filed — Alteration
INTERIOR RENOVATION OF 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01266673-P1
06/24/2026
Permit issued — Structural
M01397591-S1-ST
06/23/2026
Permit issued — General Construction
M01397591-I1-GC
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
06/18/2026
Filed — No Work
M01397964-I1
06/10/2026
Signed off — Alteration
filing herewith fence to an existing commercial space
M01027628-I1
06/09/2026
Filed — Alteration
PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH.
M01397591-S1
06/05/2026
Filed — Alteration
PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH.
M01397591-I1
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Laurence Jones
06/05/2026
Special inspection requirement — Final
Laurence Jones
05/11/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
05/08/2026
Special inspection requirement — Final
Ari Kamo
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
05/08/2026
Special inspection requirement — Sprayed fire-resistant materials
Ari Kamo
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
05/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
05/07/2026
Signed off — Alteration
INTERIOR RENOVATION OF 15TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01342381-I1
05/07/2026
Signed off — Alteration
Sprinkler modifications as per plans
M01025927-I1
05/06/2026
Special inspection requirement — Public Assembly Emergency Lighting
Ari Kamo
03/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/25/2026
Signed off — Alteration
INTERIOR RENOVATION OF 13TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01306026-I1
02/18/2026
Permit issued — Sprinklers
M01342381-S2-EW-SP
02/17/2026
Permit issued — Mechanical Systems
M01342381-S1-MS
02/02/2026
Filed — Alteration
INTERIOR RENOVATION OF 15TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01342381-S1
02/02/2026
Filed — Alteration
INTERIOR RENOVATION OF 15TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01342381-S2
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSPK/Lewis Construction10/16/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler09/28/2026
DOB NOWGeneral ConstructionPermit IssuedSPK/Lewis Construction08/12/2026
DOB NOWGeneral ConstructionSigned-offClune Construction Co08/07/2026
DOB NOWPlumbingPermit IssuedS.B.A. Plumbing06/30/2026
DOB NOWSprinklersPermit IssuedS.B.A. Plumbing06/30/2026
DOB NOWMechanical SystemsPermit IssuedJohn Gallin & Son06/29/2026
DOB NOWStructuralPermit IssuedJohn Gallin & Son06/24/2026
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin & Son06/23/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler02/18/2026
DOB NOWMechanical SystemsPermit IssuedSPK/Lewis Construction02/17/2026
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction01/27/2026
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son12/16/2025
DOB NOWMechanical SystemsSigned-offJohn Gallin Son10/06/2025
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin Son10/01/2025
DOB NOWSprinklersPermit IssuedAggressive Fire Protection09/25/2025
DOB NOWGeneral ConstructionSigned-offClune Construction Co09/15/2025
DOB NOWPlumbingSigned-offPar Plumbing Co09/12/2025
DOB NOWMechanical SystemsSigned-offClune Construction Co09/12/2025
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler07/29/2025
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler07/29/2025
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler11/26/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction11/22/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction11/22/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction11/14/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction11/14/2024
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction11/13/2024
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction11/13/2024
DOB NOWMechanical SystemsPermit IssuedJohn Gallin Son10/25/2024
DOB NOWPlumbingSigned-offPar Plumbing Co10/22/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction10/18/2024
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction10/18/2024
DOB NOWPlumbingSigned-offPar Plumbing Co10/15/2024
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction10/15/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction10/15/2024
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son10/04/2024
DOB NOWMechanical SystemsSigned-offJohn Gallin Son09/30/2024
DOB NOWSprinklersSigned-offSirina Fire Protection09/27/2024
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler08/27/2024
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler08/27/2024
+ 60 more permits on file
2 projects · most recent 02/02/2026
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
02/02/2026Permit IssuedSPK/Lewis ConstructionAir Conditioning Systems
Cooling
Lg ARNU183TQD4 19,100 BTU · Vrf Indoor ×2
ZRUM036GSSO 36,000 BTU · Vrf Outdoor ×1
08/27/2024Signed-offJohn Gallin & SonAssociated Ducts and Piping—
5 projects · most recent 06/26/2026
FiledStatusContractorScope
06/26/2026Permit IssuedS.B.A. Plumbing121 heads
02/02/2026Permit IssuedAbco-Peerless Sprinkler25 heads
09/04/2025Permit IssuedAggressive Fire Protection90 heads
10/08/2024Permit IssuedAbco-Peerless Sprinkler—
07/30/2021Signed-offPreferred Sprinkler and Mechanical—
4 projects · most recent 06/26/2026
Water/Sanitary
FiledStatusContractorScope
06/26/2026Permit IssuedS.B.A. PlumbingWater/Sanitary
02/02/2026———
09/08/2025Signed-offPar Plumbing CoWater/Sanitary
09/04/2025———
21 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedH. & L. ElectricGeneral Wiring
06/19/2026Permit IssuedP.E. StoneGeneral Wiring
02/05/2026CompleteArcadia Elect'l CoGeneral Wiring
09/16/2025CompletePierpont ElectricalGeneral Wiring
05/16/2025CompleteP.E. StoneGeneral Wiring
10/29/2024Permit IssuedP.E. StoneGeneral Wiring
10/09/2024CompleteP.E. StoneGeneral Wiring
10/08/2024Permit IssuedP.E. StoneGeneral Wiring
03/21/2024CompleteP.E. StoneGeneral Wiring
06/16/2023CompleteFalcon Electrical ContractingGeneral Wiring
02/28/2022CompleteP.E. StoneGeneral Wiring
09/02/2021CompleteRNW ElectricGeneral Wiring
06/02/2021CompleteNee ElectricalGeneral Wiring
05/27/2021CompleteTop Shelf Electric—
02/23/2021CompleteE-J Electric Installation CoGeneral Wiring
2 projects · most recent 06/26/2026
Steel
FiledStatusContractorScope
06/26/2026Permit IssuedS.B.A. PlumbingSteel
08/27/2024Signed-offJohn Gallin & SonSteel
1 project · most recent 04/09/2024
Fence
FiledStatusContractorScope
04/09/2024Signed-offJohn Gallin & SonFence
▾Field Inspections (DOB CAP) — 36
DateTypeResultReport
09/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 36.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/05/2026Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
10/05/2026FinalJORGE CHERRESprogress
08/03/2026Lighting controlsAri Kamoenergy_progress
08/03/2026Energy Code Compliance InspectionsAri Kamoprogress
08/03/2026Duct leakage testing, insulation and designAri Kamoenergy_progress
07/02/2026FinalAri Kamoprogress
07/02/2026Mechanical SystemsAri Kamospecial
06/29/2026Fire-Resistant Penetrations and JointsLaurence Jonesspecial
06/29/2026FinalLaurence Jonesprogress
06/23/2026Fire-Resistant Penetrations and JointsAri Kamospecial
06/05/2026Fire-Resistant Penetrations and JointsLaurence Jonesspecial
06/05/2026FinalLaurence Jonesprogress
05/11/2026Sprinkler SystemsAri Kamospecial
05/08/2026Sprayed fire-resistant materialsAri Kamospecial
05/08/2026Fire-Resistant Penetrations and JointsAri Kamospecial
05/08/2026Energy Code Compliance InspectionsAri Kamoprogress
05/08/2026FinalAri Kamoprogress
05/08/2026Fire-Resistance Rated ConstructionAri Kamoprogress
05/06/2026Public Assembly Emergency LightingAri Kamoprogress
01/16/2026Fire-Resistant Penetrations and JointsLaurence Jonesspecial
01/12/2026Post-installed AnchorsFei Zengspecial
01/12/2026Interior lighting powerElla Malkinenergy_progress
01/12/2026HVAC-R and service water heating system controlsElla Malkinenergy_progress
01/12/2026HVAC-R and service water heating equipmentElla Malkinenergy_progress
01/12/2026HVAC-R and service water piping design and insulationElla Malkinenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Interchurch CenterOfficeSub-cellar, Floors 1, 2, 4, 8
Project M01425195 Alteration · Permit Entire · 07/21/2026
Project M01397964 No Work · Approved · 06/18/2026
Project M01397591 Alteration · Permit Entire · 06/05/2026
Project M01070124 Alteration · Permit Entire · 08/06/2024
Project M00953359 Alteration · Permit Entire · 11/21/2023
Project M00688482 Alteration · LOC Issued · 03/10/2022
MMBB A Financial Services MinistryOfficeFloors 15–17
Project M01342381 Alteration · Permit Entire · 01/23/2026
WOS Workforce Opportunity ServicesOfficeFloor 13
Project M01306026 Alteration · LOC Issued · 12/09/2025
Alcoholics AnonymousOfficeFloor 11
Project M01257443 Alteration · LOC Issued · 09/08/2025
Project M01257440 Alteration · LOC Issued · 09/04/2025
Project M01257462 Alteration · Permit Entire · 09/04/2025
Project M01257433 Alteration · Permit Entire · 09/02/2025
African American Policy ForumOfficeFloor 12
Project M01025927 Alteration · Permit Entire · 10/03/2024
Columbia University InterchurchEducationFloors 5, 8
Project M01016622 Alteration · LOC Issued · 04/16/2024
Project M01014505 Alteration · LOC Issued · 04/15/2024
Project M01016509 Alteration · LOC Issued · 04/15/2024
Project M01016521 Alteration · LOC Issued · 04/15/2024
Project M01016528 Alteration · LOC Issued · 04/15/2024
Project M01016538 Alteration · LOC Issued · 04/15/2024
Project M01016548 Alteration · LOC Issued · 04/15/2024
Project M01016549 Alteration · LOC Issued · 04/15/2024
Project M01016615 Alteration · LOC Issued · 04/15/2024
Columbia University in the City of New YorkEducationFloors 3, 8
Project M01014516 Alteration · LOC Issued · 04/15/2024
Project M00730156 Alteration · LOC Issued · 05/11/2022
Project M00682391 Alteration · LOC Issued · 03/25/2022
Project M00691563 Alteration · LOC Issued · 03/25/2022
JICUF Japan ICU Foundation Japan ICU FoundationsOfficeFloor 18
Project M00999281 Alteration · LOC Issued · 03/07/2024
Interfaith CenterOfficeFloor 18
Project M00968975 Alteration · Permit Entire · 12/07/2023
CU InterchurchOfficeFloor 8
Project M00701136 Alteration · LOC Issued · 05/03/2022
Project M00226205 Alteration · LOC Issued · 10/09/2019
Project M00226219 Alteration · LOC Issued · 10/09/2019
SeasOfficeFloor 8
Project M00701146 Alteration · LOC Issued · 04/29/2022
Project M00701153 Alteration · LOC Issued · 04/29/2022
United Methodist WomenOfficeFloor 15
Project M00677081 Alteration · LOC Issued · 03/21/2022
Project M00677119 Alteration · LOC Issued · 03/21/2022
Project M00677154 Alteration · LOC Issued · 03/18/2022
Project M00675581 Alteration · LOC Issued · 03/03/2022
Church World ServiceOfficeFloor 7
Project M00656276 Alteration · LOC Issued · 02/14/2022
Project M00656749 Alteration · LOC Issued · 02/14/2022
Project M00656224 Alteration · LOC Issued · 02/11/2022
Project M00656250 Alteration · LOC Issued · 02/11/2022
Children's AidOfficeFloor 12
Project M00564989 Alteration · Permit Entire · 07/30/2021
Project M00565004 Alteration · Permit Entire · 07/30/2021
Project M00564956 Alteration · Permit Entire · 07/28/2021
Children's Health FundOfficeFloor 6
Project M00473276 Alteration · LOC Issued · 03/22/2021
Project M00473293 Alteration · LOC Issued · 03/22/2021
Project M00472495 Alteration · LOC Issued · 03/15/2021
Foundation for Child DevelopmentOfficeFloor 2
Project M00267168 Alteration · LOC Issued · 01/27/2020
Project M00267215 Alteration · LOC Issued · 01/27/2020
Project M00267300 Alteration · LOC Issued · 01/27/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,726 on file (BIS + DOB NOW)
▸Plans & Drawings106
▸DOB NOWPlans/Sketch90
10/17/2026M01469916-I1Request digital key ↗
09/03/2026M00510322-P1Request digital key ↗
09/03/2026M00510322-I1Request digital key ↗
Showing 3 of 90 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00226219-I1Request digital key ↗
09/05/2026M00267168-I1Request digital key ↗
09/05/2026M00274004-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00226205-I1Request digital key ↗
09/05/2026M00274000-I1Request digital key ↗
09/05/2026M00267215-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00267300-I1Request digital key ↗
09/05/2026M00274000-I1Request digital key ↗
09/04/2026M00473293-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00472495-I1Request digital key ↗
▸Applications & Permits434
▸BISPLAN / WORK APPROVAL APPLICATION228
10/31/2022122195409Open ↗
10/14/2022122195409Open ↗
10/13/2022122195409Open ↗
Showing 3 of 228 on file for this type
▸BISWORK PERMIT APPLICATION204
12/01/2020140984914Open ↗
11/29/2020140983318Open ↗
03/02/2020123786536Open ↗
Showing 3 of 204 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications796
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION316
02/03/2020123671847Open ↗
12/10/2019123786536Open ↗
12/09/2019123807648Open ↗
Showing 3 of 316 on file for this type
▸DOB NOWProgress Inspector Seal & Signature106
09/23/2026M01342381-S1Open ↗
09/23/2026M01342381-S1Open ↗
09/23/2026M01342381-S1Open ↗
Showing 3 of 106 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature105
10/17/2026M01469916-I1Open ↗
09/05/2026M00226205-I1Open ↗
09/05/2026M00267300-I1Open ↗
Showing 3 of 105 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature88
10/08/2026M00677119-P1Open ↗
10/03/2026M01016548-P1Open ↗
09/27/2026M00656224-P1Open ↗
Showing 3 of 88 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST76
12/10/2019123786536Open ↗
12/09/2019123807648Open ↗
10/09/2019123817977Open ↗
Showing 3 of 76 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT60
11/30/2020140984914Open ↗
11/25/2020140983318Open ↗
01/14/2020140883177Open ↗
Showing 3 of 60 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/30/2020140984914Open ↗
11/25/2020140983318Open ↗
01/14/2020140883177Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
11/30/2020140984914Open ↗
11/25/2020140983318Open ↗
01/14/2020140883177Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment163
▸BISSELF-CERT PLUMBING NOTICE44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISSCHEDULE B - PLUMBING27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA21
01/27/2023122195409Open ↗
07/12/2022123660582Open ↗
07/06/2021123001704Open ↗
Showing 3 of 21 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8514
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS12
05/11/2022123001713Open ↗
Showing 1 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
05/11/2022123001713Open ↗
Showing 1 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Environmental & Asbestos213
▸DOB NOWDEP ACP-5: Asbestos Assessment Report69
10/17/2026M01469916-I1Open ↗
09/05/2026M00274000-I1Open ↗
09/05/2026M00274004-I1Open ↗
Showing 3 of 69 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)64
11/30/2020140984914Open ↗
11/25/2020140983318Open ↗
01/14/2020140883177Open ↗
Showing 3 of 64 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form15
09/05/2026M00226205-I1Open ↗
09/05/2026M00267215-I1Open ↗
09/03/2026M00510322-I1Open ↗
Showing 3 of 15 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
07/18/2020140883177Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
02/06/2023122195409Open ↗
07/26/2021123001704Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance135
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS82
12/10/2019123786536Open ↗
12/09/2019123807648Open ↗
10/09/2019123817977Open ↗
Showing 3 of 82 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS27
03/04/2022140883177Open ↗
03/04/2022140883177Open ↗
06/10/2021123671847Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/04/2022140883177Open ↗
06/10/2021123671847Open ↗
12/01/2020140984914Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/30/2020140984914Open ↗
11/25/2020140983318Open ↗
01/14/2020140883177Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/11/2022123001713Open ↗
01/18/2022123711616Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING CONTROLS2
05/11/2022123001713Open ↗
01/18/2022123711616Open ↗
▸BISINTERIOR LIGHTING POWER2
05/11/2022123001713Open ↗
01/18/2022123711616Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION1
01/18/2022123711616Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY17
03/04/2022140883177Open ↗
03/04/2022140883177Open ↗
06/10/2021123671847Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
05/11/2022123001713Open ↗
01/18/2022123711616Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
05/11/2022123001713Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs263
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter95
10/17/2026M01469916-I1Open ↗
09/05/2026M00226205-I1Open ↗
09/05/2026M00267300-I1Open ↗
Showing 3 of 95 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST83
02/06/2023122195409Open ↗
06/28/2022123001713Open ↗
04/11/2022123711616Open ↗
Showing 3 of 83 on file for this type
▸BISADMINISTRATIVE OBJECTIONS58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
10/08/2019123817977Open ↗
Showing 1 of 20 on file for this type
▸BISCCD1-Construction Code Determination4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL2
05/11/2022123001713Open ↗
01/18/2022123711616Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/03/2026M00510322-I1Open ↗
▸Cost, Insurance & Ownership248
▸BISCOST AFFIDAVIT241
01/31/2023122195409Open ↗
03/04/2022140883177Open ↗
03/04/2022140883177Open ↗
Showing 3 of 241 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
02/03/2023122195409Open ↗
04/08/2022123711616Open ↗
02/14/2022123001713Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms241
▸BISEFILING COVER SHEET143
12/10/2019123786536Open ↗
12/09/2019123807648Open ↗
10/09/2019123817977Open ↗
Showing 3 of 143 on file for this type
▸BISADDITIONAL INFORMATION53
01/12/2021140883177Open ↗
07/29/2020140883177Open ↗
02/13/2020123807648Open ↗
Showing 3 of 53 on file for this type
▸BISBOROUGH INTAKE FORM34
11/18/2019123817977Open ↗
09/10/2019123660573Open ↗
09/06/2019123660573Open ↗
Showing 3 of 34 on file for this type
▸BISeFiling Job Application Cover Sheet11
11/30/2020140984914Open ↗
11/25/2020140983318Open ↗
01/14/2020140883177Open ↗
Showing 3 of 11 on file for this type
▸Other Documents68
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION57
07/30/2020140883177Open ↗
07/30/2020140883177Open ↗
12/10/2019123786536Open ↗
Showing 3 of 57 on file for this type
▸BISSupporting Document: Fee Exempt8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee DefermentEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type