← Back
Adult care facility
475 VICTORY BOULEVARD
STATEN ISLAND · BIN 5002887
💬 Discuss this project
1931Year Built
1Stories
I7Building Class
R3XZoning
12,504 sfGross Floor Area
1Units
28 Open Violations 25 unresolved · 3 paperwork only ▸FDNY Report ↗
Adult care facility · Owner of record: INTEGRATED COMMUNITY FACILITIES,INC. · 23,580 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 212p · 2 filings · 20 docs
Floor 19p · 1 filing · 12 docs
Cellar10p · 2 filings · 20 docs
Sub-Cellar10p · 2 filings · 20 docs
Basement8p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.101/19/2026
STUDIO 16 ARCHITECTURE PLLC307/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHRIS ALL AROUND GEN CONTElectrical303/21/2026
DOWLING, KENNETHElectrical303/21/2026
PORTER, LLOYDElectrical303/21/2026
WM KIRBY PLBG & HTG COElectrical303/21/2026
CAMPA CONSTRUCTION CORPGeneral Contractor203/21/2026
MVS HEATING & AIR CONDITGeneral Contractor107/08/2026
PATRIOT PLBG & HTG INCPlumbing107/08/2026
CONTROL ELEC'L CONT'G CORElectrical103/22/2026
MICHAEL GAMBARDELLAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738301/19/2026
Building Lifecycle
All (91)Filed (4)Permit Issued (3)Signed Off (1)Violation (54)Inspection (5)Objection (12)Special Inspection (12)
03/03/2026
Signed off — Alteration
INSTALLATION OF (1) NEW 6-TON HEAT PUMP SYSTEM FOR EXISTING OPEN SPACE.
S01338641-I1
03/02/2026
Permit issued — Mechanical Systems
S01338641-I1-MS
01/19/2026
Filed — Alteration
INSTALLATION OF (1) NEW 6-TON HEAT PUMP SYSTEM FOR EXISTING OPEN SPACE.
S01338641-I1
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/22/2025
Special inspection requirement — Mechanical Systems
anthony santoro
12/22/2025
Special inspection requirement — Final
anthony santoro
12/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/19/2025
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/31/2025
Violation issued (ECB, open)
Boilers
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2024
Violation issued (FDNY_NOV, closed)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/11/2024
Filed — Alteration
PAA herewith submitted to indicate the elimination of the proposed gas dryers and 2 washers in the sub-cellar as per plans submitted. No new gas work is to be done.
S00601214-P2
05/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2023
Permit issued — Plumbing
S00601214-I1-PL
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2023
Permit issued — General Construction
S00560945-I1-GC
11/22/2021
Objection raised — Scope
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection raised — Admin
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection raised — Scope
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection raised — Fire_Protection
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection raised — Structural
11/22/2021
Objection resolved — Addressed
11/22/2021
Objection raised — Structural
11/22/2021
Objection resolved — Addressed
09/29/2021
Filed — Alteration
PAA herewith submitted to indicate the elimination of the proposed gas dryers and 2 washers in the sub-cellar as per plans submitted. No new gas work is to be done.
S00601214-I1
09/15/2021
Filed — Alteration CO
S00560945-I1
09/15/2021
Special inspection requirement — Interior lighting power
anthony santoro
09/15/2021
Special inspection requirement — Lighting controls
anthony santoro
07/27/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/27/2021
Special inspection requirement — Masonry
anthony santoro
07/27/2021
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
07/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/27/2021
Special inspection requirement — Subgrade Inspections
anthony santoro
07/20/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT03/02/2026
DOB NOWPlumbingPermit IssuedPATRIOT PLBG & HTG INC12/11/2023
DOB NOWGeneral ConstructionPermit IssuedCAMPA CONSTRUCTION CORP03/02/2023
BISOTISSUEDADVANCED BLDG MGMT SVCS10/01/2020
BISPLISSUEDKCM PLUMBING & HEATING CO04/03/2019
BISPLISSUEDKCM PLUMBING & HEATING CO04/02/2019
BISMHISSUEDMVS HEATING & AIR CONDIT03/26/2019
BISMHISSUEDINTEGRATED COMMUNITY FACILITIES08/20/2018
BISPLISSUEDFINE MECHANICAL CORP03/14/2018
BISOTISSUEDADVANCED BUILDING MAINTEN01/23/2018
BISOTISSUEDM-A-C-HOME DESIGN AND CON09/18/2015
BISOTISSUEDSCARAN PLMG INC.10/10/2008
BISPLISSUEDSCARAN PLUMBING INC10/10/2008
BISMHISSUEDSCARAN PLBG INC09/27/2005
BISMHISSUEDSCARAN OIL SERVICES, INC.04/15/1996
BISPLISSUEDJ & M PLUMBING CORP.04/20/1994
BISOTISSUEDMBL CONSTRACTING CORP.04/20/1994
1 project · most recent 07/11/2024
Water/Sanitary
FiledStatusContractorScope
07/11/2024Permit IssuedPITMAN PLBG & HTG INCWater/Sanitary
2 projects · most recent 11/07/2024
FiledStatusContractorScope
11/07/2024Permit IssuedCONTROL ELEC'L CONT'G COR—
07/31/2023CompleteERIN ELEC'L CONTR'G INCOR—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/23/2025Energy Code Compliance Inspectionsanthony santoroprogress
12/22/2025Mechanical Systemsanthony santorospecial
12/22/2025Finalanthony santoroprogress
09/15/2021Interior lighting poweranthony santoroenergy_progress
09/15/2021Lighting controlsanthony santoroenergy_progress
07/27/2021Energy Code Compliance Inspectionsanthony santoroprogress
07/27/2021Fire-Resistance Rated Constructionanthony santoroprogress
07/27/2021Masonryanthony santorospecial
07/27/2021Concrete - Cast-In-Placeanthony santorospecial
07/27/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
07/27/2021Subgrade Inspectionsanthony santorospecial
07/20/2021Structural Stability – Alterations of existing buildingsanthony santorospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
On Your Mark/iccOtherSub-cellar, Cellar, Floor 2
Project S00601214 Alteration · Permit Entire · 09/29/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 195 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00560945-I1Request digital key ↗
08/21/2026S00601214-P2Request digital key ↗
08/21/2026S00601214-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION22
10/15/2025520311975Open ↗
06/12/2025520311975Open ↗
11/21/2024520287537Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION12
10/01/2020540177930Open ↗
04/03/2019520311975Open ↗
04/03/2019520351592Open ↗
Showing 3 of 12 on file for this type
▸BISPLACE OF ASSEMBLY3
03/19/2018520269799Open ↗
08/22/2016520269799Open ↗
08/19/2016520269780Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
02/10/2012520090437Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00560945-I1Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
04/10/2019520376995Open ↗
04/03/2019520351592Open ↗
03/27/2019520376995Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00560945-I1Open ↗
08/21/2026S00601214-P1Open ↗
08/21/2026S00601214-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/27/2019520376995Open ↗
08/25/2009520018418Open ↗
08/25/2009520018356Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/25/2009520018418Open ↗
08/25/2009520018356Open ↗
10/07/2008510055958Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026S01338641-I1Open ↗
08/29/2026S00560945-I1Open ↗
08/29/2026S00560945-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026S01338641-I1Open ↗
08/29/2026S00560945-I1Open ↗
08/29/2026S00560945-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/22/2020540177930Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/22/2020540177930Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/27/2019520376995Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
08/02/2018520351592Open ↗
04/23/2018520311975Open ↗
03/06/2018520215623Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
10/23/2025520311975Open ↗
04/10/2019520376995Open ↗
04/23/2018520311975Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
04/10/2019520376995Open ↗
01/09/2009510055958Open ↗
▸BISSCHEDULE B - PLUMBING2
08/25/2009520018418Open ↗
01/05/2009510055958Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
12/29/2008510055958Open ↗
12/29/2008510055958Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/05/2018520351592Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
06/11/2015520215623Open ↗
▸BISTenant Protection Plan and Notes1
04/23/2018520311975Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00560945-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00560945-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026S00560945-I1Open ↗
08/21/2026S00601214-P2Open ↗
08/21/2026S00601214-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/22/2020540177930Open ↗
07/05/2018520351592Open ↗
07/28/2015520215623Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/25/2009520018418Open ↗
08/25/2009520018356Open ↗
10/07/2008510055958Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
04/10/2019520376995Open ↗
04/03/2019520351592Open ↗
03/27/2019520376995Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/22/2020540177930Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/10/2019520376995Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/22/2020540177930Open ↗
▸Approvals, Objections & Sign-offs28
▸BISLETTERS - SUPPORTING DOCUMENTATION11
04/19/2018520269799Open ↗
02/26/2018520215623Open ↗
02/06/2018520215623Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
04/23/2018520311975Open ↗
03/21/2017520287537Open ↗
06/11/2015520215623Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/10/2019520376995Open ↗
04/19/2018520269799Open ↗
12/04/2017520269780Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026S00601214-P2Open ↗
08/13/2026S00601214-P1Open ↗
08/13/2026S00560945-I1Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
07/22/2020540177930Open ↗
04/10/2019520376995Open ↗
03/27/2019520376995Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/11/2025520311975Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET8
03/27/2019520376995Open ↗
08/02/2018520351592Open ↗
07/05/2018520351592Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
04/23/2018520311975Open ↗
03/26/2018520269799Open ↗
03/01/2018520215623Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
04/10/2019520376995Open ↗
04/19/2018520269799Open ↗
03/06/2018520215623Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/22/2020540177930Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/22/2020540177930Open ↗
03/21/2017520287537Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00560945-I1Open ↗