← Back
Two stories - detached, small or mid-size
477 MARLBOROUGH ROAD
BROOKLYN · BIN 3119402
💬 Discuss this project
1905Year Built
2.5Stories
A1Building Class
R3XZoning
2,180 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,000 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 31p · 2 filings · 11 docs
Floor 21p · 1 filing · 6 docs
Floor 1
Cellar2p · 1 filing · 10 docs
Basement2p · 2 filings · 11 docs
1 job · most recent 05/19/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2022Permit IssuedPALONE BROTHERS AIRAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-8C48NAHZ2-U1 48,000 BTU · Heat Pump Outdoor ×1
SUZ-KA24NAHZ 24,000 BTU · Heat Pump Outdoor ×1
Heating
Mitsubishi Electric MXZ-8C48NAHZ2-U1 54,000 BTU · Heat Pump Outdoor ×1
SUZ-KA24NAHZ 54,000 BTU · Heat Pump Outdoor ×1
Building Lifecycle
All (37)Filed (3)Permit Issued (3)Signed Off (2)Violation (1)Inspection (3)Objection (12)Special Inspection (13)
04/18/2024
Signed off — Alteration
Upgrades to finishes and reconfiguration of kitchen and dining room at the first floor. Upgrades to finishes and reconfiguration of bathroom at the second floor. Upgrades to finishes at the third floor. Remove the existing chimney.
B00810223-I1
04/17/2024
Signed off — Alteration
Modifications to existing kitchen at first floor. Modifications to existing bathroom at second floor. Add one bathroom at second floor.
B00750714-I1
01/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2023
Permit issued — Plumbing
B00750714-I1-PL
04/20/2023
Permit issued — General Construction
B00810223-I1-GC
03/03/2023
Filed — Alteration
Upgrades to finishes and reconfiguration of kitchen and dining room at the first floor. Upgrades to finishes and reconfiguration of bathroom at the second floor. Upgrades to finishes at the third floor. Remove the existing chimney.
B00810223-I1
03/01/2023
Objection raised — Admin
03/01/2023
Objection resolved — Addressed
03/01/2023
Objection raised — Inspections
03/01/2023
Objection resolved — Addressed
03/01/2023
Objection raised — Scope
03/01/2023
Objection resolved — Addressed
03/01/2023
Objection raised — Admin
03/01/2023
Objection resolved — Addressed
03/01/2023
Objection raised — Energy
03/01/2023
Objection resolved — Addressed
03/01/2023
Objection raised — Energy
03/01/2023
Objection resolved — Addressed
02/24/2023
Filed — Alteration
Modifications to existing kitchen at first floor. Modifications to existing bathroom at second floor. Add one bathroom at second floor.
B00750714-I1
02/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
George Varthalamis
02/20/2023
Special inspection requirement — Energy Code Compliance Inspections
George Varthalamis
02/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
01/10/2023
Special inspection requirement — Final
George Varthalamis
01/10/2023
Special inspection requirement — Chimneys and vents
JONAR MADRIAGA
05/27/2022
Permit issued — Mechanical Systems
B00699001-I1-MS
05/19/2022
Filed — Alteration
Direct replacement of existing HVAC unit with new split system.
B00699001-I1
05/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
05/19/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
05/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
05/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
05/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/15/2022
Special inspection requirement — Final
Steven Bendoraitis
03/15/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
10/01/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PALONE BROTHERS AIRGeneral Contractor203/21/2026
LEWIS CONSTRUCTION NYC INGeneral Contractor107/08/2026
SAMUEL & SONS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827103/03/2023
CL ENGINEERING P.C.6781105/19/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC07/21/2023
DOB NOWGeneral ConstructionSigned-offLEWIS CONSTRUCTION NYC IN04/20/2023
DOB NOWMechanical SystemsPermit IssuedPALONE BROTHERS AIR05/27/2022
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
02/20/2023HVAC-R and service water piping design and insulationGeorge Varthalamisenergy_progress
02/20/2023Energy Code Compliance InspectionsGeorge Varthalamisprogress
02/07/2023Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
01/10/2023FinalGeorge Varthalamisprogress
01/10/2023Chimneys and ventsJONAR MADRIAGAspecial
05/19/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
05/19/2022HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
05/19/2022Maintenance informationSteven Bendoraitisenergy_progress
05/19/2022HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
05/19/2022HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
05/19/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/15/2022FinalSteven Bendoraitisprogress
03/15/2022Mechanical SystemsCHRISTIAN LOZADAspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00699001-I1Request digital key ↗
08/27/2026B00810223-I1Request digital key ↗
08/15/2026B00750714-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature9
09/30/2026B00750714-I1Open ↗
09/30/2026B00750714-I1Open ↗
09/01/2026B00699001-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00750714-I1Open ↗
08/27/2026B00810223-I1Open ↗
08/13/2026B00699001-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00699001-I1Open ↗
08/25/2026B00810223-I1Open ↗
08/25/2026B00810223-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00810223-I1Open ↗
08/15/2026B00750714-I1Open ↗
08/13/2026B00699001-I1Open ↗