← Back
BuildNYC
Walk-up cooperative
479 VAN BUREN STREET
BROOKLYN · BIN 3043671
💬 Discuss this project
1931Year Built
4Stories
C6Building Class
R6BZoning
15,072 sfGross Floor Area
20Units
Rent Stabilized133 Active Violations 132 unresolved · 1 paperwork only 4 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Neighborhood Restore Housing Development Fund · 5,000 sf lot · 3.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCellar, 1st floor, 2-4 floors removal replacement framingUnder Construction96p · 2 filings · 20 docs
BulkheadCellar, 1st floor, 2-4 floors removal replacement framingUnder Construction1p · 1 filing · 20 docs
Floor 4Cellar, 1st floor, 2-4 floors removal replacement framingUnder Construction84p · 1 filing · 20 docs
Floor 3Cellar, 1st floor, 2-4 floors removal replacement framingUnder Construction84p · 1 filing · 20 docs
Floor 2Cellar, 1st floor, 2-4 floors removal replacement framingUnder Construction86p · 1 filing · 20 docs
Floor 1Cellar, 1st floor, 2-4 floors removal replacement framingUnder Construction89p · 2 filings · 20 docs
CellarCellar, 1st floor, 2-4 floors removal replacement framingUnder Construction96p · 3 filings · 20 docs
Site & exteriorBoiler room and gas chimney3p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Southside United-Los Sures Management803/21/2026
NYC Department of Housing Preservation and Development203/21/2026
Los Sures TPT YR15 HDFC203/21/2026
477 Van Buren HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Victor M. Morales, Architect1304/03/2026
Mje Professional Services105/12/2025
Bazini Engineering409/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eric Ramos Rodriguez Consulting1203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor707/08/2026
Aura PlumbingPlumbing407/03/2026
SNS OrgnizationGeneral Contractor303/21/2026
Techno-Volt ElectricElectrical103/22/2026
Techno-Volt ElectricElectrical103/21/2026
Reliable EnterprisesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803710/29/2025
Bazini Engineering1808209/14/2022
Building Lifecycle
08/01/2026
§27-2045(b)(5) hmc, § 12-01 rcny post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the…
HPD violation · open
08/01/2026
§27-2045(b)(5) hmc, § 12-06, 12-10 rcny post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner,…
HPD violation · open
08/01/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · open
07/03/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
HPD violation · closed
05/12/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
B01224211-I1-SH
286 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/04/2026
DOB NOWStructuralPermit IssuedA.A.D. Construction03/04/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction03/02/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction01/30/2026
DOB NOWPlumbingSigned-offAura Plumbing08/01/2025
DOB NOWStructuralPermit IssuedA.A.D. Construction06/12/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction06/12/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises05/12/2025
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz12/02/2021
DOB NOWMechanical SystemsSigned-offSNS Orgnization11/30/2021
BISBLISSUEDApproved Oil of Brooklyn12/29/2010
BISOTISSUEDSt Marks P & H Co01/11/1993
BISPLISSUEDSt Marks P & H Co12/16/1992
1 project · most recent 04/03/2026
Heating Systems
FiledStatusContractorScope
04/03/2026Permit IssuedA.A.D. ConstructionHeating Systems
1 project · most recent 04/03/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
04/03/2026Signed-offAura PlumbingGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 10/31/2025
General Wiring
FiledStatusContractorScope
10/31/2025Pending PaymentTechno-Volt ElectricGeneral Wiring
05/13/2025Permit IssuedRichard Neu—
1 project · most recent 04/03/2026
Wood
FiledStatusContractorScope
04/03/2026Permit IssuedA.A.D. ConstructionWood
1 project · most recent 05/12/2025
Sidewalk Shed
FiledStatusContractorScope
05/12/2025Permit IssuedReliable EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
04/13/2026Tenant Protection Plan Compliance—special
03/25/2026Tenant Protection Plan Compliance—special
02/06/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
02/06/2026Wood – Seismic ResistanceSAMI HAJJAR P.Especial
02/06/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/06/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
02/06/2026FinalSAMI HAJJAR P.Eprogress
02/01/2026Structural Steel - High Strength Bolting—special
10/24/2025Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
10/24/2025MasonrySAMI HAJJAR P.Especial
10/24/2025Tenant Protection Plan Compliance—special
10/24/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/24/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
10/24/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/24/2025FinalSAMI HAJJAR P.Eprogress
10/24/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
10/24/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/24/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
10/24/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
10/24/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
10/24/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
10/24/2025Mechanical SystemsSAMI HAJJAR P.Especial
10/24/2025Tenant Protection Plan Compliance—special
10/24/2025FinalSAMI HAJJAR P.Eprogress
10/24/2025Tenant Protection Plan Compliance—special
Latest 25 of 50.
96 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account