City residence, one family
48 WEST 69 STREET
MANHATTAN · BIN 1028474
💬 Discuss this project
1910Year Built
4Stories
A4Building Class
R8BZoning
13,767 sfGross Floor Area
1Units
Rent Stabilized19 Open Violations ▸
City residence, one family · Owner of record: ERZULI, LLC · 4,167 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Basement2p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIAN CAFFREY ARCHITECT2707/03/2026
NORDIC CUSTOM BUILDERS IN803/22/2026
NOVA CONSTRUCTION SERVICE103/22/2026
SWEENEY & COUROY INC.103/22/2026
SWAENEY AND COURY INC103/22/2026
ERZULI LLC C/0 LAW OF L.E.F203/21/2026
ERZULI LLC C/O LAW OFF OF L.E.F.703/21/2026
ERZULI LLC C O LAW OFF OF L E F1803/21/2026
ERZULI LLC C 0 LAW OF L E F803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC405/17/2023
AMM ENGINEERING PC212/14/2022
ASHRAF CORP409/03/2022
PAUL PERDEK, PROF. ENG. PLLC708/12/2022
KZ ENGINEERING, P.C112/15/2021
M.ARCH ARCHITECTS106/03/2021
TOHFAZ UDDIN PE PC211/21/2017
PE AND CONSULTANTS NY LLC111/17/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE2003/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
DIRECT ACCESS EXPEDITING, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURETECH NEW YORK INGeneral Contractor2207/03/2026
PHOENIX SUTTON STR INCGeneral Contractor1907/03/2026
NOVA CONSTRUCTION SERVICEGeneral Contractor1607/03/2026
WARREN OSTROFFElectrical803/21/2026
SWEENEY & CONROY INCGeneral Contractor807/03/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/03/2026
WARREN OSTROFF ELEC., INCElectrical203/22/2026
Building Lifecycle
All (137)Filed (22)Permit Issued (42)Signed Off (12)Violation (60)Special Inspection (1)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
10/01/2024
Signed off — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00002547-I1
09/20/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00002546-I1
09/20/2024
Signed off — Alteration
INSTALLATION OF FENCE ENCLOSURE AS PER DRAWINGS. FENCE ENCLOSURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00002875-I1
09/17/2024
Signed off — Alteration
INSTALLATION OF 8' HIGH PLYWOOD CONSTRUCTION FENCE. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00531683-I1
04/01/2024
Violation issued (HPD, open)
A
11/22/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00459616-I1
11/16/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00599017-I1
11/16/2023
Signed off — Alteration
Installation of supported (systems) scaffolding as per plan and in accordance with chapter 33 of NYC Building Code. No change in use, egress, or occupancy.
M08055065-I1
11/16/2023
Signed off — Alteration
Installation of temporary scaffold stair tower per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00644304-I1
11/15/2023
Violation issued (HPD, open)
I
11/14/2023
Signed off — Alteration
INSTALLATION OF 500 # CAPACITY MATERIAL ONLY HOISTS DURING BLDG ALTERATION, FILED SEPARATELY. HOISTS TO BE ATTACHED TO PIPE SCAFFOLDING FILED SEP & SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP.
M00490499-I1
10/13/2023
Permit issued — Construction Fence
M00531683-I1-FN
10/12/2023
Signed off — Alteration
Installation of material hoists within the construction site as per plan and in accordance with chapter 33 of NYC 2014 building code. No change in use, egress, or occupancy.
M08018988-I1
09/19/2023
Permit issued — Supported Scaffold
M00599017-I1-SF
09/19/2023
Permit issued — Sidewalk Shed
M00599017-I1-SH
09/07/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M07998454-I1
09/05/2023
Permit issued — Protection and Mechanical Methods
M07998454-I1-PM
05/24/2023
Permit issued — Protection and Mechanical Methods
M00490499-I1-PM
05/24/2023
Permit issued — Supported Scaffold
M00459616-I1-SF
05/17/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00599017-P3
04/07/2023
Permit issued — Construction Fence
M00531683-I1-FN
03/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00599017-P2
03/16/2023
Violation issued (HPD, open)
A
12/15/2022
Permit issued — Supported Scaffold
M08055065-I1-SF
12/14/2022
Filed — Alteration
Installation of supported (systems) scaffolding as per plan and in accordance with chapter 33 of NYC Building Code. No change in use, egress, or occupancy.
M08055065-I1
12/09/2022
Permit issued — Construction Fence
M00531683-I1-FN
11/29/2022
Permit issued — Supported Scaffold
M00644304-I1-SF
11/02/2022
Violation issued (HPD, open)
I
10/13/2022
Permit issued — Protection and Mechanical Methods
M08018988-I1-PM
10/12/2022
Filed — Alteration
Installation of material hoists within the construction site as per plan and in accordance with chapter 33 of NYC 2014 building code. No change in use, egress, or occupancy.
M08018988-I1
10/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY 78' HIGH PIPE SCAFFOLD ORIGINATING (OFF WORKING PLATFORM) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00416050-I1
09/20/2022
Permit issued — Supported Scaffold
M00599017-I1-SF
09/20/2022
Permit issued — Supported Scaffold
M00599017-I1-SH
09/06/2022
Permit issued — Protection and Mechanical Methods
M07998454-I1-PM
09/03/2022
Filed — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M07998454-I1
08/12/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00459616-P5
07/14/2022
Permit issued — Sidewalk Shed
M00002546-I1-SH
06/14/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Permit issued — Protection and Mechanical Methods
M00490499-I1-PM
05/26/2022
Permit issued — Supported Scaffold
M00459616-I1-SF
05/13/2022
Permit issued — Construction Fence
M00531683-I1-FN
02/16/2022
Violation issued (HPD, open)
I
02/16/2022
Violation issued (HPD, open)
A
01/04/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00459616-P4
12/15/2021
Filed — Alteration
Installation of temporary scaffold stair tower per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00644304-I1
12/15/2021
Permit issued — Supported Scaffold
M00644304-I1-SF
11/24/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00599017-P1
11/24/2021
Violation issued (ECB, closed)
Construction
10/18/2021
Permit issued — Supported Scaffold
M00416050-I1-SF
10/15/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00459616-P3
09/24/2021
Violation issued (ECB, closed)
Construction
09/23/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00599017-I1
09/23/2021
Permit issued — Sidewalk Shed
M00599017-I1-SH
09/23/2021
Permit issued — Supported Scaffold
M00599017-I1-SF
08/10/2021
Special inspection requirement — Final
Eric Foster
08/05/2021
Filed — Alteration
INSTALLATION OF TEMPORARY 78' HIGH PIPE SCAFFOLD ORIGINATING (OFF WORKING PLATFORM) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00416050-P2
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offTOMMY CHIU BUILDING CORP10/13/2023
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC09/19/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC09/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE05/24/2023
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE05/24/2023
DOB NOWConstruction FenceSigned-offTOMMY CHIU BUILDING CORP04/07/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC12/15/2022
DOB NOWConstruction FenceSigned-offTOMMY CHIU BUILDING CORP12/09/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC11/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offARSENAL SCAFFOLD INC10/13/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC09/20/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC09/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC09/06/2022
DOB NOWSidewalk ShedSigned-offSTRUCTURETECH NEW YORK IN07/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE05/26/2022
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE05/26/2022
DOB NOWConstruction FenceSigned-offTOMMY CHIU BUILDING CORP05/13/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC12/15/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC10/18/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/23/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC09/23/2021
DOB NOWConstruction FenceSigned-offTOMMY CHIU BUILDING CORP06/07/2021
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE06/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE06/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE04/15/2021
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NEW YORK IN04/12/2021
DOB NOWSidewalk ShedSigned-offSTRUCTURETECH NEW YORK IN04/12/2021
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE01/27/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC10/21/2020
DOB NOWSupported ScaffoldSigned-offSTRUCTURETECH NEW YORK IN04/06/2020
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NEW YORK IN04/06/2020
DOB NOWSidewalk ShedSigned-offSTRUCTURETECH NEW YORK IN04/06/2020
DOB NOWSidewalk ShedSigned-offSTRUCTURETECH NEW YORK IN05/21/2019
DOB NOWSupported ScaffoldSigned-offSTRUCTURETECH NEW YORK IN04/10/2019
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NEW YORK IN04/10/2019
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NEW YORK IN03/30/2018
DOB NOWSidewalk ShedSigned-offSTRUCTURETECH NEW YORK IN03/30/2018
DOB NOWSupported ScaffoldSigned-offSTRUCTURETECH NEW YORK IN03/30/2018
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NEW YORK IN11/22/2017
+ 48 more permits on file
6 projects · most recent 06/22/2024
General Wiring
FiledStatusContractorScope
06/22/2024CompleteWARREN OSTROFF ELEC., INCGeneral Wiring
10/20/2022CompleteSTAR ELEC'L CONTRACTORS C—
09/03/2021CompleteELPO ELECTRICAL CONTG INC—
07/18/2019CompleteWARREN OSTROFF ELEC., INC—
07/17/2019CompleteWARREN OSTROFF ELEC., INC—
06/06/2018CompleteWMS ELECTRICAL CONTNG LTD1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/10/2021FinalEric Fosterprogress
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch13
09/06/2026M00002546-I1Request digital key ↗
09/06/2026M00002547-I1Request digital key ↗
09/06/2026M00002875-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
09/04/2026M00416050-I1Request digital key ↗
09/03/2026M00459616-P4Request digital key ↗
09/03/2026M00459616-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION44
09/30/2024121817506Open ↗
02/15/2024121817506Open ↗
02/13/2024121817506Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION31
02/21/2023121817506Open ↗
02/21/2023123188344Open ↗
02/21/2023123188344Open ↗
Showing 3 of 31 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/18/2024121817506Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISVERIFY TAX LOT1
12/21/2023121817506Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/23/2024121817506Open ↗
▸BISZONING RESOLUTION DETERMINATION1
01/02/2018121817506Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/06/2026M00002875-I1Open ↗
09/03/2026M00490499-I1Open ↗
09/03/2026M00599017-P2Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
12/04/2018123045098Open ↗
10/18/2018121817506Open ↗
07/05/2018123188344Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/21/2020140967755Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/21/2020140967755Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/21/2020140967755Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M00416050-I1Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING13
02/15/2024121817506Open ↗
02/13/2024121817506Open ↗
11/14/2023121817506Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/29/2019121817506Open ↗
05/31/2019121817506Open ↗
05/30/2019121817506Open ↗
Showing 3 of 5 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/05/2023121817506Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/05/2023121817506Open ↗
▸BISEQUIPMENT USE PERMITS1
06/14/2024121817506Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan3
08/13/2026M00416050-P1Open ↗
08/13/2026M00416050-P2Open ↗
08/13/2026M00416050-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
10/21/2020140967755Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
12/13/2022121817506Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/12/2018123188344Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00002547-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/09/2021121817506Open ↗
03/02/2021121817506Open ↗
03/02/2021121817506Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
07/16/2019121817506Open ↗
07/16/2019121817506Open ↗
05/02/2019121817506Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/21/2018123188344Open ↗
Showing 1 of 2 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/18/2023121817506Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
09/18/2023121817506Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/18/2023121817506Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/13/2022121817506Open ↗
▸BISHYDRO FLOW TEST LETTER1
01/02/2018121817506Open ↗
▸BISMECHANICAL SYSTEMS1
06/19/2024121817506Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/12/2023121817506Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/13/2024121817506Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/18/2023121817506Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
07/17/2024121817506Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/12/2023121817506Open ↗
▸Approvals, Objections & Sign-offs33
▸BISSUPERSEDING LETTER10
02/21/2023121817506Open ↗
02/21/2023123188344Open ↗
02/21/2023123188344Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
12/15/2023121817506Open ↗
12/13/2023121817506Open ↗
12/07/2023121817506Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL5
10/21/2020140967755Open ↗
12/04/2018123045098Open ↗
03/12/2018123188344Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/10/2021121817506Open ↗
03/12/2018123188344Open ↗
11/29/2017121817506Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/03/2022140967755Open ↗
12/04/2018123045098Open ↗
▸BISFINAL1
10/01/2022140967755Open ↗
▸BISLANDMARKS SIGNOFF1
09/09/2024121817506Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE5
04/06/2022121817506Open ↗
03/10/2021121817506Open ↗
03/10/2021121817506Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT5
12/04/2018123045098Open ↗
03/12/2018123188344Open ↗
Showing 2 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
12/08/2017121817506Open ↗
▸Filing & Intake Forms43
▸BISADDITIONAL INFORMATION18
02/20/2024121817506Open ↗
12/21/2023121817506Open ↗
07/07/2023121817506Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM15
02/21/2023121817506Open ↗
02/21/2023121817506Open ↗
02/21/2023123188344Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET9
02/26/2018123188344Open ↗
Showing 1 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/21/2020140967755Open ↗
▸Other Documents13
▸BISUnknown4
11/19/2019121817506Open ↗
11/19/2019121817506Open ↗
11/19/2019121817506Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/20/2018123188344Open ↗
03/12/2018123188344Open ↗
03/12/2018123188344Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION2
08/16/2024121817506Open ↗
08/16/2024121817506Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
09/18/2023121817506Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUNDERPINNING1
12/13/2022121817506Open ↗
▸BISCHIMNEYS AND VENTS1
09/18/2023121817506Open ↗