← Back
Four families
480 HENRY STREET
💬 Discuss this project
1868Year Built
3Stories
C3Building Class
R6Zoning
2,760 sfGross Floor Area
4Units
Rent Stabilized12 Open Violations ▸
Four families · 1,940 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof48p · 4 filings · 20 docs
Floor 360p · 5 filings · 20 docs
Floor 262p · 5 filings · 20 docs
Floor 161p · 5 filings · 20 docs
Cellar65p · 5 filings · 20 docs
Basement15p · 1 filing · 19 docs
Sub-Basement44p · 4 filings · 20 docs
Site & exterior15p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2021$3.2M—— → —$1,159/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES G. MICHEL ENGINEERING, PC.407/30/2024
DENNIS LEHRER105/10/2024
MARTOS ENGINEERING304/10/2024
SOLK ARCHITECTURE PLLC204/08/2024
MOHAMMAD AHEAD, PE206/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING2003/21/2026
ARSENAL BUILDING CONSULTANTS LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TJRE LLCGeneral Contractor1203/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor603/21/2026
SUNNYSIDE MASONRY INCGeneral Contractor303/21/2026
CIP SERVICES LLCGeneral Contractor303/21/2026
A&E ELECTRICAL SYSTEMS COElectrical103/22/2026
NM MECHANICAL CORPPlumbing107/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
SIMPLE AIR HVAC CORPGeneral Contractor107/08/2026
GO PRO PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496607/30/2024
CHARLES G MICHEL ENGINEER2871307/30/2024
CHRISTIAN L. MARTOS ENGIN5965304/10/2024
Building Lifecycle
All (106)Filed (12)Permit Issued (12)Signed Off (6)Violation (17)Inspection (9)Objection (20)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
04/15/2025
Signed off — Alteration
Herewith filing plumbing application as per plans submitted.
B00657518-I1
11/29/2024
Violation issued (HPD, open)
I
11/24/2024
Signed off — Alteration
Herewith filing the installation of air conditioning, ventilation, exhaust and heating systems, per plans submitted.
B00657746-I1
09/10/2024
Permit issued — Plumbing
B00657518-I1-PL
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
08/05/2024
Special inspection requirement — Final
Charles Michel
08/05/2024
Special inspection requirement — Mechanical Systems
Charles Michel
08/05/2024
Special inspection requirement — Heating Systems
Charles Michel
08/02/2024
Signed off — Alteration
B00658236-I1
07/30/2024
Filed — Alteration
Herewith filing the installation of air conditioning, ventilation, exhaust and heating systems, per plans submitted.
B00657746-P1
07/24/2024
Signed off — Alteration
B01025409-I1
07/24/2024
Special inspection requirement — Heating Systems
Charles Michel
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
07/24/2024
Special inspection requirement — Final
Charles Michel
07/24/2024
Special inspection requirement — Mechanical Systems
Charles Michel
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
07/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
LEAH SOLK
07/22/2024
Special inspection requirement — Chimneys and vents
ANTHONY UGBEBOR
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
06/27/2024
Signed off — Alteration
B00658457-I1
06/20/2024
Permit issued — Structural
B00658457-I1-ST
06/14/2024
Special inspection requirement — Final
Christian Martos
06/14/2024
Special inspection requirement — Structural Wood Frame
Christian Martos
06/14/2024
Special inspection requirement — Subgrade Inspections
Christian Martos
06/14/2024
Special inspection requirement — Masonry
Christian Martos
06/14/2024
Special inspection requirement — Post-installed Anchors
Christian Martos
06/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
06/14/2024
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
06/14/2024
Special inspection requirement — Structural Cold-Formed Steel
Christian Martos
06/14/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Christian Martos
06/14/2024
Special inspection requirement — Structural Steel - Welding
Christian Martos
06/14/2024
Special inspection requirement — Structural Steel - Details
Christian Martos
06/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2024
Objection raised — Zoning
06/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/30/2024
Objection resolved — Addressed
05/29/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/20/2024
Permit issued — General Construction
B01025409-I1-GC
05/10/2024
Filed — Alteration
B01025409-I1
05/08/2024
Objection raised — Scope
04/22/2024
Objection raised — Zoning
04/10/2024
Filed — Alteration
B00658457-P2
04/10/2024
Violation issued (HPD, open)
A
04/08/2024
Filed — Alteration CO
Herewith filing interior and exterior renovations to convert a 4-family rowhouse to a 2-family rowhouse. A new certificate of occupancy will be obtained upon completion of construction.
B00656810-P1
04/08/2024
Special inspection requirement — Structural Steel - Welding
Christian Martos
04/08/2024
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
04/08/2024
Special inspection requirement — Masonry
Christian Martos
04/08/2024
Special inspection requirement — Post-installed Anchors
Christian Martos
04/08/2024
Special inspection requirement — Structural Cold-Formed Steel
Christian Martos
04/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
04/08/2024
Special inspection requirement — Structural Steel - Details
Christian Martos
04/08/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Christian Martos
02/12/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00839975-I1
11/29/2023
Filed — Alteration
B00658457-P1
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI09/10/2024
DOB NOWStructuralSigned-offTJRE LLC06/20/2024
DOB NOWGeneral ConstructionSigned-offSUNNYSIDE MASONRY INC05/20/2024
DOB NOWGeneral ConstructionPermit IssuedTJRE LLC10/18/2023
DOB NOWGeneral ConstructionPermit IssuedTJRE LLC08/25/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/10/2023
DOB NOWMechanical SystemsSigned-offSIMPLE AIR HVAC CORP08/08/2023
DOB NOWGeneral ConstructionPermit IssuedTJRE LLC08/07/2023
DOB NOWPlumbingSigned-offNM MECHANICAL CORP07/31/2023
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/08/2023
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS03/08/2023
DOB NOWGeneral ConstructionPermit IssuedCIP SERVICES LLC09/27/2022
2 projects · most recent 09/28/2023
General Wiring
FiledStatusContractorScope
09/28/2023CompleteA&E ELECTRICAL SYSTEMS COGeneral Wiring
03/07/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/05/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
08/05/2024FinalCharles Michelprogress
08/05/2024Mechanical SystemsCharles Michelspecial
08/05/2024Heating SystemsCharles Michelspecial
07/24/2024Heating SystemsCharles Michelspecial
07/24/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
07/24/2024FinalCharles Michelprogress
07/24/2024Mechanical SystemsCharles Michelspecial
07/22/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
07/22/2024Fire-Resistance Rated ConstructionLEAH SOLKprogress
07/22/2024Chimneys and ventsANTHONY UGBEBORspecial
06/14/2024FinalChristian Martosprogress
06/14/2024Structural Wood FrameChristian Martosprogress
06/14/2024Subgrade InspectionsChristian Martosspecial
06/14/2024MasonryChristian Martosspecial
06/14/2024Post-installed AnchorsChristian Martosspecial
06/14/2024Structural Stability – Alterations of existing buildingsChristian Martosspecial
06/14/2024Concrete - Cast-In-PlaceChristian Martosspecial
06/14/2024Structural Cold-Formed SteelChristian Martosspecial
06/14/2024Structural Steel - High Strength BoltingChristian Martosspecial
06/14/2024Structural Steel - WeldingChristian Martosspecial
06/14/2024Structural Steel - DetailsChristian Martosspecial
04/08/2024Structural Steel - WeldingChristian Martosspecial
04/08/2024Concrete - Cast-In-PlaceChristian Martosspecial
04/08/2024MasonryChristian Martosspecial
Latest 25 of 46.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/31/2026B00658457-P2Request digital key ↗
08/31/2026B00658457-I1Request digital key ↗
08/31/2026B00658457-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/13/2026B00658457-P2Open ↗
08/13/2026B00658457-P1Open ↗
08/13/2026B00658457-I1Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00656810-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B00657746-P1Open ↗
09/02/2026B00657746-P1Open ↗
09/01/2026B00658457-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00658457-I1Open ↗
08/31/2026B00658457-P1Open ↗
08/31/2026B00658457-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00657746-P1Open ↗
09/01/2026B00658457-P1Open ↗
09/01/2026B00657746-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/25/2026B00656810-I1Open ↗
08/14/2026B00656810-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00656810-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00656810-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/31/2026B00658457-I1Open ↗
08/31/2026B00658236-I1Open ↗
08/25/2026B00656810-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents8
▸DOB NOWProof of Historic Building6
08/13/2026B00656810-I1Open ↗
08/13/2026B00657746-P1Open ↗
08/13/2026B00657746-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification2
08/25/2026B00656810-I1Open ↗
08/14/2026B00656810-P1Open ↗