← Back
Walk-up cooperative
483 VAN BUREN STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3043670
💬 Discuss this project
1931Year Built
4Stories
C6Building Class
R6BZoning
15,304 sfGross Floor Area
16Units
Rent Stabilized237 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: NEIGHBORHOOD RESTORE HOUSING DEVELOPMENT FUND CORP · 5,000 sf lot · 3.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction53p · 1 filing · 20 docs
Floor 4Under Construction51p · 1 filing · 20 docs
Floor 3Under Construction51p · 1 filing · 20 docs
Floor 2Under Construction51p · 1 filing · 20 docs
Floor 1Under Construction51p · 1 filing · 20 docs
CellarUnder Construction55p · 1 filing · 20 docs
Site & exteriorUnder Construction4p · 1 filing · 3 docs
Filed — no permit issued14p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEIGHBORHOOD RESTORE1009/13/2026
LOS SURES TPT YR15 HDFC203/21/2026
NEIGHBORHOOD RESTORE HOUSING DEVELOPMENT FUND CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERIC RAMOS RODRIGUEZ CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor307/08/2026
AK AND SONS RESTORATION CGeneral Contractor207/31/2026
AURA PLUMBING INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808307/29/2026
METRIC CONSULTING AND INS1803606/15/2026
Building Lifecycle
All (157)Filed (12)Permit Issued (6)Violation (60)Objection (49)Special Inspection (30)
07/30/2026
Permit issued — Sidewalk Shed
B01373759-I1-SH
07/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/30/2026
Special inspection requirement — Wood – Prefabricated I-Joists
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Wood – Seismic Resistance
07/30/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/29/2026
Filed — Alteration
INSTALL NEW GAS METER AND GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01436648-I1
07/29/2026
Filed — Alteration
INSTALL NEW GAS METER AND GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01436648-S2
07/29/2026
Filed — Alteration
INSTALL NEW GAS METER AND GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01436648-S1
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
07/27/2026
Special inspection requirement — Final
Joseph Bazini
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/27/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
07/27/2026
Special inspection requirement — Chimneys and vents
Joseph Bazini
07/27/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/16/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Open
07/15/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/04/2026
Objection resolved — Addressed
07/04/2026
Objection resolved — Addressed
06/29/2026
Objection raised — Scope
06/25/2026
Objection raised — Fire_Protection
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Scope
06/25/2026
Objection raised — Scope
06/25/2026
Objection raised — Other
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Cost
06/15/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPAIR EXIST. STEAM RADIATOR HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00910845-P4
06/12/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPAIR EXIST. STEAM RADIATOR HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00910845-P3
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/07/2026
Objection resolved — Addressed
06/01/2026
Objection raised — Admin
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Scope
05/16/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPAIR EXIST. STEAM RADIATOR HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00910845-P2
05/16/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPAIR EXIST. STEAM RADIATOR HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00910845-P1
05/15/2026
Special inspection requirement — Wood – Seismic Resistance
05/15/2026
Special inspection requirement — Wood – Prefabricated I-Joists
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
05/14/2026
Violation issued (ECB, open)
Construction
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAK AND SONS RESTORATION C07/30/2026
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC04/27/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/31/2026
DOB NOWStructuralPermit IssuedA.A.D. CONSTRUCTION CORP03/30/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP03/30/2026
DOB NOWSidewalk ShedPermit IssuedAK AND SONS RESTORATION C03/19/2026
BISPLISSUEDEDWARD ESBIN & SONS INC09/04/1992
1 project · most recent 06/15/2026
Heating Systems
FiledStatusContractorScope
06/15/2026Permit IssuedA.A.D. CONSTRUCTION CORPHeating Systems
2 projects · most recent 07/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/29/2026——Gas
06/15/2026Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
1 project · most recent 03/18/2026
FiledStatusContractorScope
03/18/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 06/15/2026
Wood
FiledStatusContractorScope
06/15/2026Permit IssuedAURA PLUMBING INCWood
1 project · most recent 03/19/2026
Sidewalk Shed
FiledStatusContractorScope
03/19/2026Permit IssuedAK AND SONS RESTORATION CSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/30/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/30/2026Tenant Protection Plan Compliance—special
07/30/2026Wood – Prefabricated I-JoistsSAMI HAJJAR P.Especial
07/30/2026Wood – Seismic Resistance—special
07/30/2026FinalSAMI HAJJAR P.Eprogress
07/29/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/29/2026HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
07/29/2026HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
07/27/2026FinalJoseph Baziniprogress
07/27/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
07/27/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
07/27/2026Chimneys and ventsJoseph Bazinispecial
07/27/2026Mechanical SystemsJoseph Bazinispecial
07/27/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
06/08/2026Tenant Protection Plan Compliance—special
05/15/2026Wood – Seismic Resistance—special
05/15/2026Wood – Prefabricated I-JoistsSAMI HAJJAR P.Especial
05/15/2026Tenant Protection Plan Compliance—special
05/15/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
05/15/2026Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
05/15/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
05/15/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
05/15/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
05/15/2026FinalSAMI HAJJAR P.Eprogress
05/15/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
Latest 25 of 46.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00910845-P1Request digital key ↗
08/17/2026B01373759-I1Request digital key ↗
08/17/2026B00910845-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/17/2026B01373759-I1Open ↗
08/17/2026B00910845-P4Open ↗
08/17/2026B00910845-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01436648-I1Open ↗
08/28/2026B00910845-S3Open ↗
08/28/2026B00910845-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01436648-I1Open ↗
08/28/2026B00910845-S3Open ↗
08/28/2026B00910845-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/17/2026B00910845-S2Open ↗
08/17/2026B00910845-S1Open ↗
08/16/2026B01436648-S2Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/17/2026B00910845-S2Open ↗
08/17/2026B00910845-S1Open ↗
08/16/2026B01436648-I1Open ↗
Showing 3 of 12 on file for this type