← Back
BuildNYC
Condo, commercial tower (mixed-use) [derived]
NYC-Times Square NY MOXY
485 7TH AVENUE · BIN 1015235
💬 Discuss this project
1906Year Built
17Stories
RCBuilding Class
M1-9A/R12Zoning
230,246 sfGross Floor Area
4Units
LL97 CoveredRent Stabilized6 Active Violations 2 unresolved · 4 paperwork only ▸FISP: SWARMP
Condo, commercial tower (mixed-use) [derived] · 17,214 sf lot · 13.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLightstone Group10p · 3 filings · 20 docs
Floor 5Mooyah, Cafe D’avignon +17p · 5 filings · 20 docs
Floor 4Mooyah, Cafe D’avignon +17p · 5 filings · 20 docs
Floor 3Mooyah, Cafe D’avignon +111p · 6 filings · 20 docs
Floor 2Mooyah, Cafe D’avignon +110p · 6 filings · 20 docs
Floor 1Mooyah, Cafe D’avignon +1Under Construction30p · 9 filings · 20 docs
CellarAkam Associates, INC.36p · 4 filings · 20 docs
Sub-CellarAkam Associates, INC.8p · 1 filing · 13 docs
Site & exteriorMoxy HotelUnder Construction30p · 4 filings · 20 docs
Filed — no permit issuedComplete Facade inspection, stabilization, and netting3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
485 Seventh Ave. Associates11603/21/2026
The Lightstone Group3510/15/2026
Murray Hill Properties3303/21/2026
485 Shur LLC Gedula 261703/21/2026
Burgerim1307/08/2026
Moxy Hotel1008/26/2026
Anpora 485 Seventh Avenue707/08/2026
485 Shur603/21/2026
Marriott503/21/2026
1031 155 5th Ave403/21/2026
Fany 7th Ave Asoc303/21/2026
Gedula 26203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec803/21/2026
Municipal Building Consultants103/21/2026
Domani Consulting203/21/2026
Patuxent Engineering803/21/2026
Building Engineering System1603/21/2026
Melanie Rivera103/21/2026
Louis Striar1203/21/2026
Sharon Rader103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold608/26/2026
City SignsSign hanger507/08/2026
Kitchen Exhaust SolutionGeneral Contractor303/21/2026
M&A Projects Restoration*specialty_contractor303/21/2026
Paladino Construction EnterprisesGeneral Contractor307/08/2026
HNSGeneral Contractor303/21/2026
Method ElectricElectrical303/21/2026
Yes ContractingGeneral Contractor303/21/2026
Manhattan D EnterprisesScaffold303/21/2026
Hydrokinetic Plumbing & Heating IPlumbing207/08/2026
Richard Wehner Electrical ContElectrical203/22/2026
Urban IntelligenceScaffold207/08/2026
SJ Construction DesignGeneral Contractor109/07/2026
Five Borough ElectricElectrical103/22/2026
Anesis ServicesFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Yang Architecture9490108/04/2026
Jason M Aptowitz Consulting5671112/09/2025
Clarke Engineering Services3795105/22/2024
O & AMP;S Associates8393205/22/2024
Special Testing & Consulting1688405/08/2024
George J. Xerakias, PE1658104/02/2024
All State Property Inspec4288811/30/2020
Pcmarchitects2812111/06/2019
Building Lifecycle
All (219)Filed (34)Permit Issued (25)Signed Off (12)Facade (FISP) (12)Violation (60)Objection (46)Special Inspection (30)
10/05/2026
Filed — Alteration
Complete Facade inspection, stabilization, and netting
M01470091-I1
08/31/2026
Permit issued — General Construction
M01406788-I1-GC
08/25/2026
Permit issued — Protection and Mechanical Methods
M00908609-I1-PMM
08/20/2026
Objection resolved — Open
08/18/2026
Objection raised — Other
08/09/2026
Filed — Alteration
M01441772-I1
08/04/2026
Filed — Alteration
INTERIOR RENOVATION AT 001 FLOOR STORE WITH GENERAL CONSTRUCTION, NEW PARTITIONS, WALL PAINTING, AND PVC WOOD FLOORING AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS, C.O., OR BUILDING FACADE.
M01406788-I1
08/04/2026
Special inspection requirement — Interior lighting power
Alan Yang
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
07/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alan Yang
06/24/2026
Permit issued — Suspended Scaffold
M01351057-S1-SC
06/11/2026
Filed — Alteration
Facade Inspections
M01351057-S1
04/29/2026
Violation issued (HPD, open)
A
02/11/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2026
Permit issued — Suspended Scaffold
M01351057-I1-SC
01/26/2026
Filed — Alteration
Facade Inspections
M01351057-I1
01/13/2026
Violation issued (ECB, open)
Elevators
01/13/2026
Violation issued (ECB, open)
Elevators
01/13/2026
Violation issued (ECB, open)
Elevators
12/29/2025
Objection resolved — Addressed
12/29/2025
Objection resolved — Addressed
12/22/2025
Objection raised — Energy
12/22/2025
Objection raised — Admin
12/09/2025
Filed — Alteration
FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01321338-I1
12/03/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JASON APTOWITZ
11/19/2025
Special inspection requirement — Final
JASON APTOWITZ
11/19/2025
Special inspection requirement — Masonry
JASON APTOWITZ
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
JASON APTOWITZ
11/17/2025
Violation issued (HPD, closed)
I
09/23/2025
Filed — Alteration
Facade Inspections
M01291222-I1
09/11/2025
Violation issued (ECB, open)
Unknown
09/11/2025
Violation issued (ECB, closed)
Construction
09/11/2025
Violation issued (ECB, closed)
Construction
07/29/2025
Violation issued (FDNY_ORDER, closed)
07/02/2025
Permit issued — Protection and Mechanical Methods
M00908609-I1-PMM
06/04/2025
Violation issued (HPD, open)
A
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
11/22/2024
Violation issued (HPD, closed)
I
08/12/2024
Permit issued — Structural
M00993255-I1-ST
07/23/2024
Permit issued — Protection and Mechanical Methods
M00908609-I1-PMM
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2024
Filed — Alteration
Install temporary shoring, no change to use, occupancy or egress.
M00993255-S1
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
05/09/2024
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
05/08/2024
Filed — Alteration
SIDEWALK SLAB REPAIRS, NEW WATERPROOFING AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00759750-P1
05/07/2024
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
Latest 60 of 219 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSJ Construction Design08/31/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedCole NYC06/24/2026
DOB NOWSuspended ScaffoldPermit IssuedUniversal Steeplejack01/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold07/02/2025
DOB NOWStructuralPermit IssuedHNS08/12/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold07/23/2024
DOB NOWGeneral ConstructionPermit IssuedPaladino Construction Enterprises04/25/2024
DOB NOWStructuralPermit IssuedPaladino Construction Enterprises04/05/2024
DOB NOWStructuralPermit IssuedPaladino Construction Enterprises04/03/2024
DOB NOWSidewalk ShedSigned-offUrban Intelligence01/09/2024
DOB NOWGeneral ConstructionSigned-offM&A Projects Restoration*10/19/2023
DOB NOWSidewalk ShedSigned-offUrban Intelligence09/06/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold07/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises01/22/2022
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I01/25/2021
DOB NOWMechanical SystemsSigned-offYes Contracting11/17/2020
DOB NOWSignSigned-offElmer Dawson09/16/2020
DOB NOWSprinklersSigned-offThomas Fay07/01/2020
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I01/24/2020
DOB NOWMechanical SystemsSigned-offKitchen Exhaust Solution12/04/2019
DOB NOWSignSigned-offElmer Dawson11/22/2019
DOB NOWSignSigned-offElmer Dawson08/20/2019
DOB NOWSignSigned-offElmer Dawson04/12/2019
DOB NOWSignSigned-offElmer Dawson04/12/2019
BISOTISSUEDYes Contracting03/04/2020
BISOTISSUEDYes Contracting11/15/2019
BISMHISSUEDCeltic Services NYC06/28/2019
BISMHISSUEDPebble Craft01/28/2019
BISMHISSUEDRetail Construction Speci11/27/2018
BISPLISSUEDProto P & H Services10/15/2018
BISMHISSUEDPebble Craft10/11/2018
BISSPISSUEDPlumbing & Heating Doctor08/29/2018
BISPLISSUEDPlumbing & Heating Doctor08/29/2018
BISOTISSUEDRetail Construction Speci08/01/2018
BISFSISSUEDChampion Combustion07/23/2018
BISPLISSUEDPro Star Plumbing, Heating & Mechanical03/19/2018
BIS—ISSUEDC&A Seneca Construction10/23/2017
BISEQISSUEDC&A Seneca Construction10/20/2017
BISFBISSUEDPeter Agliardo Contractor09/06/2017
+ 35 more permits on file
20 projects · most recent 12/03/2025
General Wiring Lighting
FiledStatusContractorScope
12/03/2025CancelledMethod ElectricGeneral Wiring
10/31/2025CompleteMethod ElectricGeneral Wiring
09/07/2023Complete5 J'S Electl Conts—
02/11/2022Permit IssuedFive Borough ElectricGeneral Wiring
01/25/2022Complete5 J'S Electl Conts—
04/27/2021CompleteJ.M.C. ElectricalGeneral Wiring
03/08/2021CompleteTeam ElectricGeneral Wiring
12/01/2020CompleteRainbow Electric Co—
10/24/2020CompleteRainbow Electric Co—
07/29/2020CompleteRainbow Electric Co—
07/29/2020CompleteRainbow Electric Co—
07/29/2020CompleteRainbow Electric Co—
07/21/2020CompleteBass ElectricalGeneral Wiring
10/11/2019CompleteRainbow Electric Co—
04/23/2019CompleteRainbow Electric Co—
3 projects · most recent 12/09/2025
Masonry Steel Concrete
FiledStatusContractorScope
12/09/2025——Masonry
05/22/2024Permit IssuedHNS1 scope_items
04/02/2024Permit IssuedPaladino Construction EnterprisesSteel, Concrete
1 project · most recent 06/11/2026
Suspended Scaffold
FiledStatusContractorScope
06/11/2026Permit IssuedCole NYCSuspended Scaffold
3 projects · most recent 10/05/2026
FiledStatusContractorScope
10/05/2026———
06/11/2026Permit IssuedCole NYC—
09/23/2025———
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
08/04/2026Interior lighting powerAlan Yangenergy_progress
07/07/2026Energy Code Compliance InspectionsAlan Yangprogress
07/07/2026Tenant Protection Plan ComplianceAlan Yangspecial
07/07/2026Fire-Resistant Penetrations and JointsAlan Yangspecial
11/19/2025MasonryJASON APTOWITZspecial
11/19/2025FinalJASON APTOWITZprogress
11/19/2025Tenant Protection Plan ComplianceJASON APTOWITZspecial
11/19/2025Structural Stability – Alterations of existing buildingsJASON APTOWITZspecial
05/09/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
05/09/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/07/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/07/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
03/21/2024Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
03/21/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/21/2024Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
03/21/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
03/21/2024Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
03/21/2024Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
03/21/2024Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
03/04/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/04/2024Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
03/04/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
03/04/2024Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
03/04/2024Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
03/04/2024Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 78.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MooyahRestaurant / Food ServiceFloors 1–5
Project M00260789 Alteration · LOC Issued · 11/18/2019
Cafe D’avignonRestaurant / Food ServiceFloors 1–5
Project M00198325 Alteration · LOC Issued · 08/06/2019
Prova PizzabarRestaurant / Food ServiceFloors 1–5
Project M00146625 Alteration · LOC Issued · 04/12/2019
Project M00146644 Alteration · LOC Issued · 04/12/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,395 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch19
10/06/2026M01470091-I1Request digital key ↗
09/03/2026M00662012-I1Request digital key ↗
08/29/2026M00908609-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sign6
09/05/2026M00146644-I1Request digital key ↗
09/05/2026M00146625-I1Request digital key ↗
09/05/2026M00198325-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00280377-I1Request digital key ↗
08/15/2026M00280377-P4Request digital key ↗
08/15/2026M00280377-P5Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00228999-I1Request digital key ↗
08/15/2026M00286041-I1Request digital key ↗
08/14/2026M00286041-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/15/2026M00289030-P1Request digital key ↗
08/15/2026M00289030-I1Request digital key ↗
▸Applications & Permits318
▸BISPLAN / WORK APPROVAL APPLICATION175
10/15/2021121186509Open ↗
06/11/2021121835997Open ↗
06/04/2021121186509Open ↗
Showing 3 of 175 on file for this type
▸BISWORK PERMIT APPLICATION114
03/05/2020123804963Open ↗
11/18/2019123804963Open ↗
07/30/2019140855563Open ↗
Showing 3 of 114 on file for this type
▸DOB NOWLPC Approval/Permit21
08/16/2026M01406788-I1Open ↗
08/13/2026M00286041-P1Open ↗
08/13/2026M00260789-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPLACE OF ASSEMBLY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications318
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION135
01/06/2020140855563Open ↗
01/06/2020140855563Open ↗
11/20/2019121186509Open ↗
Showing 3 of 135 on file for this type
▸DOB NOWProgress Inspector Seal & Signature44
10/03/2026M00662012-I1Open ↗
09/29/2026M00759750-P1Open ↗
09/02/2026M00286041-I1Open ↗
Showing 3 of 44 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST33
09/25/2019123804963Open ↗
Showing 1 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT31
09/25/2019123804963Open ↗
06/26/2019140855563Open ↗
Showing 2 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00146644-I1Open ↗
09/05/2026M00260789-P1Open ↗
09/05/2026M00260789-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/29/2026M00759750-P1Open ↗
09/02/2026M00286041-I1Open ↗
09/01/2026M00289030-P1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
06/26/2019140855563Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/26/2019140855563Open ↗
Showing 1 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment77
▸BISSCHEDULE B - PLUMBING21
03/19/2020121186509Open ↗
02/26/2020121186509Open ↗
06/26/2019140855563Open ↗
Showing 3 of 21 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
01/18/2019123006406Open ↗
12/26/2018123006406Open ↗
12/17/2018123006406Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS7
10/16/2020123358623Open ↗
11/20/2019121186509Open ↗
11/20/2019121186509Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
04/19/2019123072432Open ↗
01/15/2019123542979Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/16/2020123358623Open ↗
11/20/2019121186509Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILER (BL) SIGNOFF1
10/08/2021121186509Open ↗
▸Safety & Tenant Protection28
▸DOB NOWHPD-1: Anti-Harassment Area Checklist13
09/03/2026M00662012-I1Open ↗
08/13/2026M00759750-I1Open ↗
08/13/2026M00908609-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTenant Protection Plan and Notes8
09/25/2019123804963Open ↗
02/19/2019122385427Open ↗
Showing 2 of 8 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos70
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
09/25/2019123804963Open ↗
06/26/2019140855563Open ↗
02/05/2019122385427Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/05/2026M00146644-I1Open ↗
09/05/2026M00260789-I1Open ↗
09/05/2026M00260789-P1Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
09/25/2019123804963Open ↗
03/07/2019123006406Open ↗
03/07/2019123006406Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
04/20/2021123804963Open ↗
10/16/2020123358623Open ↗
02/10/2020123006406Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/20/2021123804963Open ↗
10/16/2020123358623Open ↗
06/26/2019140855563Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS1
06/26/2019140855563Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY23
10/05/2021122966718Open ↗
04/20/2021123804963Open ↗
10/16/2020123358623Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs135
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST65
10/05/2021122966718Open ↗
04/20/2021123804963Open ↗
01/08/2021121186509Open ↗
Showing 3 of 65 on file for this type
▸BISLANDMARKS APPROVAL25
11/07/2019123804963Open ↗
06/26/2019140855563Open ↗
02/05/2019122385427Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
06/04/2021121186509Open ↗
Showing 1 of 9 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLANDMARKS SIGNOFF3
10/05/2021122966718Open ↗
10/16/2020123358623Open ↗
10/16/2020122501774Open ↗
▸BISFUEL STORAGE (FS) SIGNOFF1
10/08/2021121186509Open ↗
▸Cost, Insurance & Ownership91
▸BISCOST AFFIDAVIT84
04/20/2021123804963Open ↗
10/16/2020123358623Open ↗
10/16/2020122501774Open ↗
Showing 3 of 84 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/05/2021122966718Open ↗
07/15/2020122999210Open ↗
▸Filing & Intake Forms219
▸BISBOROUGH INTAKE FORM88
07/24/2020121835997Open ↗
07/24/2020120367227Open ↗
07/24/2020102757287Open ↗
Showing 3 of 88 on file for this type
▸BISADDITIONAL INFORMATION65
04/27/2021121186509Open ↗
04/01/2021123804963Open ↗
01/22/2021121186509Open ↗
Showing 3 of 65 on file for this type
▸BISEFILING COVER SHEET56
09/25/2019123804963Open ↗
02/05/2019122385427Open ↗
Showing 2 of 56 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
06/26/2019140855563Open ↗
Showing 1 of 10 on file for this type
▸Other Documents28
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
02/03/2021122385427Open ↗
02/03/2021122876325Open ↗
10/16/2020123358623Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWIRA Certification5
10/06/2026M01470091-I1Open ↗
08/19/2026M01351057-S1Open ↗
08/16/2026M01441772-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Deferment3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWWaiver Document2
08/13/2026M00759750-I1Open ↗
08/13/2026M00759750-P1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLAA - Supporting Documentation1
02/10/2020123006406Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTO ALL FLOORS & ADD PROPOSED DESCRIPTION TO MEZ BEFORE TCO RENEWAL1
10/08/2021121186509Open ↗