← Back
Two family converted from one family
486 16 STREET
BROOKLYN · BIN 3026966
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R5BZoning
1,992 sfGross Floor Area
2Units
Two family converted from one family · 1,600 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 3 filings · 20 docs
Floor 2Under Construction20p · 2 filings · 20 docs
Floor 1Under Construction21p · 3 filings · 20 docs
CellarUnder Construction21p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-BasementUnder Construction18p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO LYON/SZOT307/09/2026
DERIVE ENGINEERS812/16/2025
TALWEG ENGINEERING STUDIO D.P.C.202/14/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EG MUNOZ CONSTRUCTION.LLCGeneral Contractor1407/08/2026
ARIEL SERVICES INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681012/16/2025
Building Lifecycle
All (88)Filed (13)Permit Issued (13)Signed Off (4)Inspection (2)Objection (26)Special Inspection (30)
08/07/2026
Signed off — Alteration
STRUCTURAL WORK FILED AS AN ALT IN CONJUNCTION WITH ALT-2 APPLICATION TBD FOR RENOVATION OF AN EXISTING BUILDING, NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B08016626-I1
08/05/2026
Signed off — Alteration
PROJECT CONSISTS OF MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF A RESIDENTIAL 2-FAMILY BUILDING. INSTALLATION OF A NEW GAS-FIRED FURNACE, SPLIT HEAT PUMP SYSTEM, AND REPLACEMENT OF EXISTING BOILER, STEAM RADIATORS, AND PIPING VALVES. NO CHANGE TO EG
B08022308-I1
07/16/2026
Special inspection requirement — Final
JOHN SZOT
07/09/2026
Filed — Alteration
STRUCTURAL WORK FILED AS AN ALT IN CONJUNCTION WITH ALT-2 APPLICATION TBD FOR RENOVATION OF AN EXISTING BUILDING, NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B08016626-P3
04/20/2026
Signed off — Alteration
STRUCTURAL WORK FILED AS AN ALT IN CONJUNCTION WITH ALT-2 APPLICATION TBD FOR RENOVATION OF AN EXISTING BUILDING, NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B08016626-S1
04/20/2026
Permit issued — Mechanical Systems
B08022308-I1-MS
04/17/2026
Permit issued — Foundation
B08016626-S1-GC-CX
04/17/2026
Permit issued — General Construction
B08016626-I1-GC
04/07/2026
Signed off — Alteration
THE PROJECT CONSISTS OF PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF A RESIDENTIAL 2 FAMILY APARTMENT BUILDING. REPLACE PLUMBING FIXTURES AND ADJUST EXISTING PIPING AS INDICATED ON PLAN.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B08022364-I1
12/16/2025
Filed — Alteration
THE PROJECT CONSISTS OF PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF A RESIDENTIAL 2 FAMILY APARTMENT BUILDING. REPLACE PLUMBING FIXTURES AND ADJUST EXISTING PIPING AS INDICATED ON PLAN.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B08022364-P5
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
10/28/2025
Permit issued — Plumbing
B08022364-I1-PL
10/15/2025
Permit issued — Mechanical Systems
B08022308-I1-MS
10/15/2025
Permit issued — General Construction
B08016626-I1-GC
09/29/2025
Special inspection requirement — Final
Soorjbally Harilall
09/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
09/29/2025
Special inspection requirement — Chimneys and vents
SOORJBALLY HARILALL
09/29/2025
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/29/2025
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/25/2025
Objection resolved — Addressed
08/18/2025
Objection raised — Other
08/08/2025
Filed — Alteration
PROJECT CONSISTS OF MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF A RESIDENTIAL 2-FAMILY BUILDING. INSTALLATION OF A NEW GAS-FIRED FURNACE, SPLIT HEAT PUMP SYSTEM, AND REPLACEMENT OF EXISTING BOILER, STEAM RADIATORS, AND PIPING VALVES. NO CHANGE TO EG
B08022308-P2
08/08/2025
Filed — Alteration
THE PROJECT CONSISTS OF PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF A RESIDENTIAL 2 FAMILY APARTMENT BUILDING. REPLACE PLUMBING FIXTURES AND ADJUST EXISTING PIPING AS INDICATED ON PLAN.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B08022364-P4
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/27/2025
Filed — Alteration
THE PROJECT CONSISTS OF PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF A RESIDENTIAL 2 FAMILY APARTMENT BUILDING. REPLACE PLUMBING FIXTURES AND ADJUST EXISTING PIPING AS INDICATED ON PLAN.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B08022364-P3
02/14/2025
Filed — Alteration
THE PROJECT CONSISTS OF PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF A RESIDENTIAL 2 FAMILY APARTMENT BUILDING. REPLACE PLUMBING FIXTURES AND ADJUST EXISTING PIPING AS INDICATED ON PLAN.NO CHANGE TO EGRESS, OCCUPANCY OR USE.
B08022364-P2
10/01/2024
Permit issued — General Construction
B08016626-I1-GC
09/30/2024
Permit issued — Mechanical Systems
B08022308-I1-MS
09/24/2024
Permit issued — Plumbing
B08022364-I1-PL
09/05/2024
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
JONATHAN BILOW
09/05/2024
Special inspection requirement — Footing and Foundation
Soorjbally Harilall
09/05/2024
Special inspection requirement — Preliminary
Soorjbally Harilall
09/05/2024
Special inspection requirement — Final
Soorjbally Harilall
09/05/2024
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
09/05/2024
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
08/29/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Other
06/12/2024
Objection resolved — Addressed
02/28/2024
Objection raised — Other
02/22/2024
Objection raised — Other
02/16/2024
Filed — Alteration
STRUCTURAL WORK FILED AS AN ALT IN CONJUNCTION WITH ALT-2 APPLICATION TBD FOR RENOVATION OF AN EXISTING BUILDING, NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B08016626-P2
02/14/2024
Filed — Alteration
STRUCTURAL WORK FILED AS AN ALT IN CONJUNCTION WITH ALT-2 APPLICATION TBD FOR RENOVATION OF AN EXISTING BUILDING, NO CHANGE IN USE, OCCUPANCY, OR EGRESS
B08016626-P1
01/09/2024
Special inspection requirement — Final
JOHN SZOT
12/22/2023
Special inspection requirement — Preliminary
Soorjbally Harilall
12/22/2023
Special inspection requirement — Footing and Foundation
Soorjbally Harilall
12/22/2023
Special inspection requirement — Final
Soorjbally Harilall
12/22/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
JONATHAN BILOW
12/22/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SOORJBALLY HARILALL
12/22/2023
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
12/22/2023
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
12/22/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
11/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEG MUNOZ CONSTRUCTION.LLC04/20/2026
DOB NOWFoundationSigned-offEG MUNOZ CONSTRUCTION.LLC04/17/2026
DOB NOWGeneral ConstructionSigned-offEG MUNOZ CONSTRUCTION.LLC04/17/2026
DOB NOWPlumbingSigned-offARIEL SERVICES INC10/28/2025
DOB NOWMechanical SystemsSigned-offEG MUNOZ CONSTRUCTION.LLC10/15/2025
DOB NOWGeneral ConstructionSigned-offEG MUNOZ CONSTRUCTION.LLC10/15/2025
DOB NOWGeneral ConstructionSigned-offEG MUNOZ CONSTRUCTION.LLC10/01/2024
DOB NOWMechanical SystemsPermit IssuedEG MUNOZ CONSTRUCTION.LLC09/30/2024
DOB NOWPlumbingSigned-offARIEL SERVICES INC09/24/2024
DOB NOWMechanical SystemsSigned-offEG MUNOZ CONSTRUCTION.LLC05/10/2023
DOB NOWFoundationSigned-offEG MUNOZ CONSTRUCTION.LLC05/09/2023
DOB NOWPlumbingSigned-offARIEL SERVICES INC05/03/2023
DOB NOWGeneral ConstructionSigned-offEG MUNOZ CONSTRUCTION.LLC11/15/2022
1 project · most recent 08/08/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/08/2025Signed-offEG MUNOZ CONSTRUCTION.LLCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Others
Cooling
Armstrong Air 4SCU16LS148P-3 48,000 BTU · Condensing Unit ×5
Comfort Aire A-VCD48SA-1 48,000 BTU · Heat Pump Outdoor ×5
Heating
Armstrong Air A96US2V090C16S 85,000 BTU · Furnace ×5
Ventilation
Delta Breeze RAD80 54 CFM · Exhaust Fan ×15
Fantech PRO100 50 CFM · Exhaust Fan ×5
Other
— we are running combustion exhaust through chimney, Exhaust Fan ×5
Armstrong Air A96US2V090C16S (BLOWER ONLY - NO GAS HEATING) 47,000 BTU · Heat Pump Outdoor ×5
1 project · most recent 10/11/2024
General Wiring
FiledStatusContractorScope
10/11/2024CompleteMLB ELECTRICAL CORPGeneral Wiring
1 project · most recent 07/09/2026
Steel Concrete Wood
FiledStatusContractorScope
07/09/2026Signed-offEG MUNOZ CONSTRUCTION.LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/16/2026FinalJOHN SZOTprogress
12/09/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/29/2025FinalSoorjbally Harilallprogress
09/29/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
09/29/2025Chimneys and ventsSOORJBALLY HARILALLspecial
09/29/2025Heating SystemsSOORJBALLY HARILALLspecial
09/29/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/29/2025Mechanical SystemsSOORJBALLY HARILALLspecial
07/31/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/05/2024Structural Steel - WeldingSOORJBALLY HARILALLspecial
09/05/2024Structural Steel - DetailsSOORJBALLY HARILALLspecial
09/05/2024Subgrade InspectionsSOORJBALLY HARILALLspecial
09/05/2024Subsurface Investigations (Borings/Test Pits)JONATHAN BILOWspecial
09/05/2024Footing and FoundationSoorjbally Harilallprogress
09/05/2024PreliminarySoorjbally Harilallprogress
09/05/2024FinalSoorjbally Harilallprogress
09/05/2024Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
09/05/2024Subsurface Conditions – Fill Placement & In-Place DensitySOORJBALLY HARILALLspecial
09/05/2024Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
09/05/2024Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
09/05/2024Post-installed AnchorsSOORJBALLY HARILALLspecial
01/09/2024FinalJOHN SZOTprogress
12/22/2023PreliminarySoorjbally Harilallprogress
12/22/2023Footing and FoundationSoorjbally Harilallprogress
12/22/2023FinalSoorjbally Harilallprogress
Latest 25 of 34.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B08022364-P4Request digital key ↗
08/26/2026B08022364-P3Request digital key ↗
08/26/2026B08022364-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026B08022364-P1Open ↗
08/26/2026B08022364-P5Open ↗
08/26/2026B08022364-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B08016626-P2Open ↗
08/27/2026B08022308-I1Open ↗
08/27/2026B08022308-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026B08022308-I1Open ↗
08/26/2026B08022364-P5Open ↗
08/26/2026B08022364-P4Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026B08022364-P1Open ↗
08/26/2026B08022364-P5Open ↗
08/26/2026B08022364-P4Open ↗
Showing 3 of 13 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B08016626-S1Open ↗
08/13/2026B08016626-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08016626-S1Open ↗
▸Other Documents11
▸DOB NOWProof of Historic Building11
08/26/2026B08016626-P3Open ↗
08/13/2026B08022364-P4Open ↗
08/13/2026B08022364-P2Open ↗
Showing 3 of 11 on file for this type