| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01447522 ↗ | 589 5 AVENUE MANHATTAN | — | Permit Issued | — | 09/23/2026 | Owner C&W Contractor OMARA ORGANIZATION INC Filer JAM CONSULTANTS, INC. | General Construction modifications taking place on the 11th floor-Suite 1133 as shown on drawings submitted herewith. No change in use, egre… |
| M01398948 ↗ | 90 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 06/05/2026 | 09/21/2026 | Contractor BYPASS MECHANICAL CORP | MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING APARTMENT #16E ON THE 16TH FLOOR. INSTALL NEW MECHANICAL SYSTEM. |
| B01410807 ↗ | 204 WYTHE AVENUE BROOKLYN | Alteration | Permit Issued | 07/07/2026 | 08/27/2026 | Owner Solon Mack Capital Contractor GRAVESEND CONSTRUCTION CO | MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR COMMERCIAL TENANT RENOVATION AT THE 1ST FLOOR. RECONFIGURE DUCTWORK AND DIFFUSERS TO EX… |
| B01432244 ↗ | 96 SOUTH PORTLAND AVE BROOKLYN | Alteration | Filed — no permit on record | 08/21/2026 | — | — | |
| M01411222 ↗ | 135 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 07/15/2026 | 07/30/2026 | Contractor DESIMONE BUILDERS LLC Filer METROPOLIS GROUP INC | HEREWITH FILING STRUCTURAL FOR SLAB INFILL WORK ON THE 3RD FLOOR OPENING. NO CHANGES TO USE, OCCUPANCY, OR EGRESS |
| X01302457 ↗ | 2576 3 AVENUE BRONX | Alteration | Permit Issued | 11/04/2025 | 07/15/2026 | Contractor LDJ CONTRACTING LLC | INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 271-275 EAST 139TH STREET, LOT 47 |
| Person | Filings | Most recent |
|---|---|---|
| Andrew Lyon | 81 | 08/18/2026 |
| JOHN SZOT | 7 | 06/12/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| DERIVE ENGINEERS | 7 | 08/21/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 5 | 07/08/2026 |
| SILMAN | 4 | 06/30/2026 |
| TALWEG ENGINEERING STUDIO D.P.C. | 4 | 07/09/2026 |
| TYLin | 2 | 07/16/2026 |
| BILOW ENGINEERING, LLC | 1 | 09/12/2025 |
| DEWBERRY ENGINEERS INC | 1 | 04/14/2026 |
| GRAFEDE ARCHITECTURE, PLLC | 1 | 08/06/2025 |
| Interface Engineering, PLLC | 1 | 06/08/2026 |
| RAS PE CONSULTING ENGINEERS | 1 | 06/24/2021 |
| REVAP CONSULTING ENGINEERS LLC | 1 | 08/06/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| DINO KOLJENOVIC BDC CORP | 5 | 06/04/2025 |
| DPH PLUMBING & HTG CORP | 5 | 06/04/2025 |
| LDJ CONTRACTING LLC | 4 | 07/14/2026 |
| PLBG INC | 4 | 08/10/2023 |
| ALCHEMY DEVELOPMENT | 3 | 04/11/2022 |
| DESIMONE BUILDERS LLC | 3 | 07/20/2026 |
| OMARA ORGANIZATION INC | 3 | 03/14/2025 |
| VIC RENOVATIONS LLC | 3 | 02/21/2024 |
| BLACK SQUARE BUILDERS COR | 2 | 11/04/2025 |
| ECOSTRUCT LLC | 2 | 04/20/2023 |
| ELYSIUM CONSTRUCTION INC | 2 | 03/06/2024 |
| EMPIREHD, INC | 2 | 07/21/2021 |
| FLOWER LAB NY, LLC | 2 | 07/28/2023 |
| JASA NYC GROUP INC | 2 | 07/20/2023 |
| MARPAT CONSTRUCTION CORP | 2 | 01/07/2026 |
| ONE70 GROUP LLC | 2 | 03/01/2023 |
| PLANT CONSTRUCTION LLC | 2 | 10/18/2024 |
| PRIMEAMERICAN HOME IMPROV | 2 | 07/28/2021 |
| A.W. & S. CONSTRUCTION CO | 1 | 07/17/2025 |
| AFFINITY BUILDING SOLUTIO | 1 | 06/04/2024 |
| ALL DIMENSION HOME IMPROV | 1 | 07/27/2021 |
| ARIANA CONTRACTING INC | 1 | 03/20/2025 |
| ARIEL CONSULTANTS LLC | 1 | 01/23/2024 |
| BMT PLUMBING&HEATING LLC | 1 | 08/10/2023 |
| CNJ ENTERPRISES, INC | 1 | 12/16/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| DAVEAN HOLDINGS LLC | 5 | 06/04/2025 |
| APERTURE HOLDINGS | 3 | 11/17/2025 |
| MEADOW PARTNERS | 3 | 06/04/2024 |
| C&W | 2 | 03/14/2025 |
| METRO MANAGEMENT | 2 | 04/02/2021 |
| PLAZA MANAGEMENT | 2 | 12/16/2025 |
| William Gottlieb Management Co. LLC | 2 | 01/07/2026 |
| 135 WEST 18TH STREET REALTY CORP. | 1 | 07/16/2026 |
| 3677 MANAGEMENT GROUP, LLC | 1 | 12/21/2022 |
| 584 BROADWAY LLC | 1 | 01/23/2024 |
| 60G MGMT LLC | 1 | 03/01/2023 |
| BAM (BROOKLYN ACADEMY OF MUSIC) | 1 | 10/10/2025 |
| BXP | 1 | 06/27/2023 |
| CUSHMAN & WAKEFIELD | 1 | 07/17/2025 |
| Choice New York Management LLC | 1 | 05/13/2024 |
| Electrify America LLC | 1 | 07/20/2026 |
| MASILESTE LLC | 1 | 10/18/2024 |
| PENN SOUTH CAPITAL MANAGEMENT LLC | 1 | 05/31/2024 |
| RUPPERT HOUSING CO INC. | 1 | 01/16/2020 |
| Solon Mack Capital | 1 | 07/08/2026 |
| Tesla, Inc. | 1 | 04/14/2026 |
| YARDBIRD LLC | 1 | 05/03/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| ANZALONE ARCHITECTURE, PLLC | 17 | 08/21/2026 |
| RIZZO GROUP | 8 | 07/20/2026 |
| JM ZONING, LLC. | 6 | 11/04/2025 |
| WILLIAM VITACCO ASSOCIATES | 3 | 12/16/2025 |
| A1 EXPEDITING SERVICE CORP. | 2 | 10/10/2025 |
| ENKAY DESIGN & CONSULTING, LLC | 2 | 01/07/2026 |
| METROPOLIS GROUP INC | 2 | 07/16/2026 |
| CONSTRUCTION PERMIT SERVICES | 1 | 06/24/2021 |
| CUBE DESIGN BUILD & MANAGEMENT, INC | 1 | 05/03/2023 |
| DVA Advisors | 1 | 06/30/2026 |
| GILLMAN CONSULTING INC | 1 | 06/27/2023 |
| GRS CONSULTING SERVICES, LLC. | 1 | 09/24/2021 |
| J. CALLAHAN CONSULTING, INC. | 1 | 10/18/2024 |
| JAM CONSULTANTS, INC. | 1 | — |
| PROCESS WERKSHOP LLC | 1 | 09/23/2022 |
| ZV Drafting | 1 | 08/06/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01447522 ↗ | 589 5 AVENUE MANHATTAN | — | Permit Issued | — | 09/23/2026 | Owner C&W Contractor OMARA ORGANIZATION INC Filer JAM CONSULTANTS, INC. | General Construction modifications taking place on the 11th floor-Suite 1133 as shown on drawings submitted herewith. No change in use, egre… |
| M01398948 ↗ | 90 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 06/05/2026 | 09/21/2026 | Contractor BYPASS MECHANICAL CORP | MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING APARTMENT #16E ON THE 16TH FLOOR. INSTALL NEW MECHANICAL SYSTEM. |
| B01410807 ↗ | 204 WYTHE AVENUE BROOKLYN | Alteration | Permit Issued | 07/07/2026 | 08/27/2026 | Owner Solon Mack Capital Contractor GRAVESEND CONSTRUCTION CO | MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR COMMERCIAL TENANT RENOVATION AT THE 1ST FLOOR. RECONFIGURE DUCTWORK AND DIFFUSERS TO EX… |
| B01432244 ↗ | 96 SOUTH PORTLAND AVE BROOKLYN | Alteration | Filed — no permit on record | 08/21/2026 | — | — | |
| M01411222 ↗ | 135 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 07/15/2026 | 07/30/2026 | Contractor DESIMONE BUILDERS LLC Filer METROPOLIS GROUP INC | HEREWITH FILING STRUCTURAL FOR SLAB INFILL WORK ON THE 3RD FLOOR OPENING. NO CHANGES TO USE, OCCUPANCY, OR EGRESS |
| X01302457 ↗ | 2576 3 AVENUE BRONX | Alteration | Permit Issued | 11/04/2025 | 07/15/2026 | Contractor LDJ CONTRACTING LLC | INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 271-275 EAST 139TH STREET, LOT 47 |
| B01401698 ↗ | 83 ROEBLING STREET BROOKLYN | Alteration CO | Filed — no permit on record | 06/24/2026 | — | Filer DVA Advisors | — |
| M01321726 ↗ | 581 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 01/07/2026 | 06/18/2026 | Contractor MARPAT CONSTRUCTION CORP | EXTERIOR REPAIRS TO EXISTING BULKHEAD. NO ENLARGEMENT, CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01398721 ↗ | 218 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 05/29/2026 | 06/03/2026 | Contractor CORE FOUR CONSTRUCTION IN | GENERAL CONSTRUCTION DEMO AND MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPAN… |
| B01123697 ↗ | 27 BRIDGE STREET BROOKLYN | Alteration CO | Permit Issued | 11/12/2024 | 05/29/2026 | Owner Electrify America LLC Contractor DESIMONE BUILDERS LLC Filer RIZZO GROUP | Filing for change in building occupancy from factory building to business and low hazard storage as per plans filed herewith. |
| M01387367 ↗ | 110 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 05/12/2026 | 05/20/2026 | — | Demolition and repair for preparation of Tenant Alteration as per plans |
| B01365331 ↗ | 65 ROEBLING STREET BROOKLYN | Alteration | Filed — no permit on record | 05/15/2026 | — | Filer RIZZO GROUP | — |
| B01237637 ↗ | 86 2 STREET BROOKLYN | Alteration | Permit Issued | 07/25/2025 | 04/29/2026 | Contractor TECHCREW INC | TEMPORARY CONSTRUCTION FENCE FILED IN CONJUCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE AND PROPOSED HORIZONTAL ENLARGEMENT AT REAR. |
| B08016626 ↗ | 486 16 STREET BROOKLYN | Alteration | Signed-off | 10/21/2022 | 04/17/2026 | Contractor EG MUNOZ CONSTRUCTION.LLC | STRUCTURAL WORK FILED AS AN ALT IN CONJUNCTION WITH ALT-2 APPLICATION TBD FOR RENOVATION OF AN EXISTING BUILDING, NO CHANGE IN USE, OCCUPANC… |
| B01027736 ↗ | 426 QUINCY STREET BROOKLYN | Alteration CO | Filed — no permit on record | 02/16/2026 | — | — | — |
| B01292802 ↗ | 352 1 STREET BROOKLYN | Alteration | Signed-off | 11/11/2025 | 01/16/2026 | Contractor COTIY BUILDING MANAGEMENT | Window replacement on all floors; bathroom renovation on floor 2 (enlargement, fixture replacement, and new finishes) |
| B01331959 ↗ | 78 HUDSON AVENUE BROOKLYN | Alteration | Permit Issued | 12/16/2025 | 12/26/2025 | Owner PLAZA MANAGEMENT Contractor CNJ ENTERPRISES, INC | General construction of fire rated demising walls creating two (2) separate suites at 6th floor office space. |
| M00546364 ↗ | 2860 BROADWAY MANHATTAN | Alteration | Signed-off | 07/28/2021 | 12/16/2025 | Contractor PLBG P & H INC | Plumbing work in conjunction with renovation of Apt 6A on the 6th Floor. Install Plumbing Fixtures and related piping. |
| B01299268 ↗ | 30 LAFAYETTE AVENUE BROOKLYN | Alteration | Signed-off | 10/10/2025 | 10/29/2025 | Contractor DESIMONE BUILDERS | Replacement of plumbing fixtures and addition of (1) handwash sink. Plumbing lines to be reconfigured as required and MEP risers to remain a… |
| Q01299067 ↗ | BIN 4625824 QUEENS | New Building | Filed — no permit on record | 10/28/2025 | — | Owner Tesla, Inc. Filer METROPOLIS GROUP INC | — |
| M00589857 ↗ | 228 WEST HOUSTON STREET MANHATTAN | Alteration CO | Permit Issued | 01/05/2022 | 07/16/2025 | Contractor MARPAT CONSTRUCTION CORP Filer ZV Drafting | CONVERSION OF EXTG NON-RESID. BLDG TO MIXED USE, W/ VERT ENLGMT TO INCREASE HEIGHT. NEW INTER. RENOV.: INSTALLATION OF NEW GWB WALLS, & NEW … |
| M01143802 ↗ | 218 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 02/25/2025 | 06/25/2025 | Owner CUSHMAN & WAKEFIELD Contractor A.W. & S. CONSTRUCTION CO | GENERAL CONSTRUCTION DEMO AND MODIFICATIONS TAKING PLACE FLOORS 6-8 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00999234 ↗ | 244 WINDSOR PLACE BROOKLYN | Alteration | Signed-off | 03/25/2024 | 06/17/2025 | Contractor PRO RENO NYC CORP | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY. INSTALL INTERIOR STRUCTURAL BEAMS AND COLUMNS PER PLANS. INSTALL … |
| M01194761 ↗ | 75 9 AVENUE MANHATTAN | Alteration | Signed-off | 04/16/2025 | 06/17/2025 | Contractor INS CONSTRUCTION CORP | Demolition of existing storefront, to be replaced by new fire-rated overhead coiling doors, Infilling a portion of wall above and widened e… |
| M01182390 ↗ | 589 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/14/2025 | 04/03/2025 | Owner C&W Contractor OMARA ORGANIZATION INC Filer RIZZO GROUP | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (9th Fl- 909/910 Division) as per plans.… |
| B00815749 ↗ | 47 FRANKLIN STREET BROOKLYN | Alteration CO | Permit Issued | 08/07/2023 | 03/03/2025 | Owner APERTURE HOLDINGS Contractor LDJ CONTRACTING | INSTALL STRUCTURAL LINTEL AND FRAME AT FRONT FACADE FOR NEW STOREFRONT. |
| B00880255 ↗ | 165 23 STREET BROOKLYN | Alteration | Permit Issued | 05/30/2023 | 02/28/2025 | Contractor DINO KOLJENOVIC BDC CORP | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. MINOR CHANGES TO INTERIOR FRAMING. |
| M01174455 ↗ | 589 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 02/07/2025 | — | — | — |
| B01011239 ↗ | 78 HUDSON AVENUE BROOKLYN | Alteration | Signed-off | 03/06/2024 | 01/15/2025 | Contractor ELYSIUM CONSTRUCTION INC | Interior alterations as per plans filed herewith. No change to use, egress or occupancy |
| M00925553 ↗ | 426 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 02/18/2024 | 10/15/2024 | Owner MEADOW PARTNERS Contractor MORA FIRE PROTECTION LLC | Sprinkler work as shown on the plans. |
| B00748204 ↗ | 351 5 STREET BROOKLYN | Alteration CO | Permit Issued | 01/17/2023 | 10/10/2024 | Contractor EMPIRE CORE GROUP LLC | CONVERT EXISTING BUILDING FROM 2- TO 1-FAMILY. DEMOLISH EXISTING 1-STY REAR ADDITION. CONSTRUCT NEW 3RD FLOOR VERTICAL ADDITION. INTERIOR RE… |
| M01112430 ↗ | 250 WEST 55 STREET MANHATTAN | No Work | Filed — no permit on record | 09/24/2024 | — | — | — |
| M00885811 ↗ | 304 EAST 12 STREET MANHATTAN | Alteration CO | Permit Issued | 08/02/2023 | 08/30/2024 | Owner DAVEAN HOLDINGS LLC Contractor DINO KOLJENOVIC BDC CORP Filer RIZZO GROUP | Filing for Structural modifications in conjunction with reduce apartment unit and convert partial space to fitness area as per plans filed h… |
| M01014155 ↗ | 20 EAST 13 STREET MANHATTAN | Alteration | Signed-off | 05/24/2024 | 07/22/2024 | Contractor CORE DESIGN & BUILD INC | MECHANICAL WORK FILED IN CONJUNCTION WITH FIRST FLOOR COMMERCIAL TENANT OFFICE RENOVATION. INSTALL DISTRIBUTION DUCTS AND DIFFUSERS TO EXIST… |
| M01044536 ↗ | 8 JAY STREET MANHATTAN | Alteration | Signed-off | 05/10/2024 | 06/21/2024 | Contractor DINO KOLJENOVIC BDC CORP | VERTICALLY COMBINE AND RENOVATE APTS 5C & 6C AT THE 5TH & 6TH FLOORS. INSTALL NEW CONVENIENCE STAIR. CAP/REMOVE FORMER KITCHEN AT APT 5C. DE… |
| M01046831 ↗ | 589 5 AVENUE MANHATTAN | Alteration | Signed-off | 05/29/2024 | 05/31/2024 | Contractor OMARA ORGANIZATION INC | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (13th Floor- Architectural Demolition) a… |
| M01039148 ↗ | 250 WEST 55 STREET MANHATTAN | No Work | Filed — no permit on record | 05/22/2024 | — | — | — |
| M00480310 ↗ | 20 EAST 78 STREET MANHATTAN | Alteration CO | Permit Issued | 03/24/2021 | 04/02/2024 | Owner MASILESTE LLC Contractor PLANT CONSTRUCTION LLC | Convert 2 family dwelling into Single family and supersede application 101057473 |
| M00921541 ↗ | 252 BROOME STREET MANHATTAN | Alteration | Signed-off | 10/05/2023 | 03/11/2024 | Contractor VIC RENOVATIONS LLC | REPLACEMENT OF STOREFRONT OF EXISTING SMALL RESTAURANT AT THE FIRST FLOOR IN EXISTING MASONRY OPENING. NO CHANGE TO USE, EGRESS, OR OCCUPANC… |
| M00951307 ↗ | 252 BROOME STREET MANHATTAN | Alteration | Signed-off | 02/21/2024 | 03/11/2024 | Contractor VIC RENOVATIONS LLC | TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH RENOVATION OF 1ST FLOOR SMALL RESTAURANT AND RELATED STOREFRONT GLAZING SYSTEM INSTAL… |
| B07995810 ↗ | 637 41 STREET BROOKLYN | Alteration | Signed-off | 03/30/2023 | 02/26/2024 | Contractor DPH PLUMBING & HTG CORP | PLUMBING FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 4B ON THE 4TH FLOOR. INSTALL/REPLACE PLUMBING FIXTURES. GENERAL CONSTRUCTION F… |
| M01001316 ↗ | 250 WEST 55 STREET MANHATTAN | No Work | Filed — no permit on record | 02/08/2024 | — | — | — |
| B00952190 ↗ | 426 QUINCY STREET BROOKLYN | Alteration | Filed — no permit on record | 01/24/2024 | — | Filer JM ZONING, LLC. | — |
| B00895270 ↗ | 78 HUDSON AVENUE BROOKLYN | Alteration CO | Permit Issued | 07/05/2023 | 01/23/2024 | Owner PLAZA MANAGEMENT Contractor PALATINE HILL CONSTRUCTIO | ALT CO TO CONVERT THE 7TH FLOOR FROM BUSINESS USE TO ASSEMBLY (A-2) FOR EATING AND DRINKING ESTABLISHMENT AS PER THE PLANS FILED HEREWITH. |
| M00984734 ↗ | 250 WEST 55 STREET MANHATTAN | No Work | Filed — no permit on record | 01/05/2024 | — | — | — |
| M00984401 ↗ | 250 WEST 55 STREET MANHATTAN | No Work | Filed — no permit on record | 01/03/2024 | — | — | — |
| M00895812 ↗ | 304 EAST 12 STREET MANHATTAN | Alteration | Signed-off | 07/20/2023 | 11/09/2023 | Owner DAVEAN HOLDINGS LLC Contractor JASA NYC GROUP INC Filer RIZZO GROUP | Filing for General construction modifications to the utility rooms in the cellar as per plans filed herewith. No change in use, egress, or o… |
| B07995784 ↗ | 637 41 STREET BROOKLYN | Alteration | Signed-off | 03/30/2023 | 10/17/2023 | Contractor DINO KOLJENOVIC BDC CORP | RENOVATE EXISTING APARTMENT 4B ON THE 4TH FLOOR. DEMO AND CONSTRUCTION INTERIOR WALLS, FINISHES AND CABINETRY. PLUMBING AND STRUCTURAL FILED… |
| M00895789 ↗ | 304 EAST 12 STREET MANHATTAN | Alteration | Permit Issued | 07/20/2023 | 10/11/2023 | Owner DAVEAN HOLDINGS LLC Contractor JASA NYC GROUP INC Filer RIZZO GROUP | Filing for General construction modifications to the utility rooms in the cellar as per plans filed herewith. No change in use, egress, or o… |
| B00802861 ↗ | 47 FRANKLIN STREET BROOKLYN | Alteration | Signed-off | 06/28/2023 | 09/28/2023 | Owner APERTURE HOLDINGS Contractor POFI CONSTRUCTION CORP | REPAIR EXISTING INTERIOR STAIR. REPAIR A PORTION OF THE EXTERIOR FACADE AT CALYER STREET. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00834507 ↗ | 584 BROADWAY MANHATTAN | Alteration | Signed-off | 05/21/2023 | 09/26/2023 | Owner 584 BROADWAY LLC Contractor ARIEL CONSULTANTS LLC | STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING OFFICE SUITE 1201 & 1203 ON THE 12th FLOOR. INSTALL ONE (1) STEEL LINTEL BEAM AT … |
| B00929068 ↗ | 78 HUDSON AVENUE BROOKLYN | No Work | Filed — no permit on record | 09/13/2023 | — | — | — |
| B00866415 ↗ | 192 5 AVENUE BROOKLYN | Alteration | Permit Issued | 05/25/2023 | 08/24/2023 | Contractor LDJ CONTRACTING | APPLICATION FILED TO COMBINE TWO RETAIL SPACES AT 192 FIFTH AVENUE AND 194 FIFTH AVENUE. RELATED APPLICATION B00866881-I1 |
| B00866881 ↗ | 194 5 AVENUE BROOKLYN | Alteration | Permit Issued | 05/25/2023 | 08/23/2023 | Contractor LDJ CONTRACTING Filer JM ZONING, LLC. | APPLICATION FILED TO COMBINE TWO RETAIL SPACES AT 192 FIFTH AVENUE AND 194 FIFTH AVENUE. RELATED APPLICATION B00866415-I1 |
| M00893217 ↗ | 250 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 06/27/2023 | 06/30/2023 | Owner BXP Contractor HOWARD M.HAIMES INC Filer GILLMAN CONSULTING INC | Removal and installation of temporary walls as per plans. No change in use, egress or occupancy. |
| M00885768 ↗ | 250 WEST 55 STREET MANHATTAN | No Work | Filed — no permit on record | 06/21/2023 | — | — | — |
| B00596812 ↗ | 56 SHERMAN STREET BROOKLYN | Alteration CO | Permit Issued | 10/15/2021 | 05/25/2023 | Contractor BLACK SQUARE BUILDERS COR Filer JM ZONING, LLC. | ALT- CO FILED TO CHANGE OCCUPANCY FROM 2 FAMILY HOME TO 1 FAMILY. NEW CERTIFICATE OF OCCUPANCY TO BE OBTAINED |
| M00819929 ↗ | 304 EAST 12 STREET MANHATTAN | Alteration | Signed-off | 02/27/2023 | 05/11/2023 | Contractor ONE70 GROUP LLC | General construction modifications to the lobby as per plans. No change in use, egress or occupancy |
| M00819983 ↗ | 304 EAST 12 STREET MANHATTAN | Alteration | Signed-off | 02/27/2023 | 05/11/2023 | Owner DAVEAN HOLDINGS LLC Contractor ONE70 GROUP LLC Filer RIZZO GROUP | General construction modifications to the lobby as per plans. No change in use, egress or occupancy |
| B00769970 ↗ | 196 BERGEN STREET BROOKLYN | Alteration | Signed-off | 07/29/2022 | 04/20/2023 | Contractor FLOWER LAB NY, LLC | Selective renovation of existing UG 6 Commercial space on 1st floor for Drinking establishment, interior cosmetic work, partitions, GWB, flo… |
| B00852118 ↗ | 196 BERGEN STREET BROOKLYN | Alteration | Signed-off | 03/29/2023 | 04/20/2023 | Contractor FLOWER LAB NY, LLC | Install Temp Plywood Construction Fence . |
| B00815657 ↗ | 292 LEONARD STREET BROOKLYN | Alteration | Permit Issued | 02/03/2023 | 03/31/2023 | Contractor VERA FORMA LLC | Subsequent filing for Plumbing fixture modification. No change to egress, occupancy or use. |
| M00699682 ↗ | 453 FDR DRIVE MANHATTAN | Alteration | Signed-off | 04/12/2022 | 03/30/2023 | Owner YARDBIRD LLC Contractor DPH PLUMBING & HTG CORP | Plumbing work filed to cap & remove (1) kit. at apt. #1703 and replace ex. plumbing fixtures as per plans. |
| M00602784 ↗ | 20 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 10/07/2021 | 03/29/2023 | Contractor PLANT CONSTRUCTION LLC | Construction fence |
| B00381160 ↗ | 158 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 04/19/2022 | 03/28/2023 | Contractor PLBG P & H INC | PLUMBING WORK IN CONJUNCTION WITH EXISTING APARTMENT 5B RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00823405 ↗ | 218 WEST 18 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/17/2023 | — | Owner MEADOW PARTNERS | — |
| M00738484 ↗ | 43 GREAT JONES STREET MANHATTAN | Alteration | Filed — no permit on record | 03/02/2023 | — | — | — |
| B00549111 ↗ | 158 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 04/02/2022 | 01/25/2023 | Contractor J COLE STUDIOS LLC | RENOVATION OF EXISTING APARTMENT 5B AT THE 5TH FLOOR. INTERIOR NON-STRUCTURAL DEMOLITION AND CONSTRUCTION. NO CHANGE TO USE,EGRESS OR OCCUPA… |
| B00622016 ↗ | 367 7 AVENUE BROOKLYN | Alteration | Signed-off | 11/04/2021 | 12/28/2022 | Contractor DINO KOLJENOVIC BDC CORP | Subsequent filing for Temp Wood Construction Fence for front facade. |
| B00716479 ↗ | 661 10 STREET BROOKLYN | Alteration | Signed-off | 09/12/2022 | 11/18/2022 | Contractor ECOSTRUCT LLC Filer PROCESS WERKSHOP LLC | Remove existing unit and associated ductwork/piping. Install new ductwork/piping. |
| B00750914 ↗ | 337 BAY RIDGE PARKWAY BROOKLYN | Alteration | Signed-off | 06/23/2022 | 11/18/2022 | Contractor ECOSTRUCT LLC | Subsequent application to modify plumbing fixtures on 001- 002 floors. |
| M00752644 ↗ | 218 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 06/24/2022 | 11/17/2022 | Owner MEADOW PARTNERS Contractor ELYSIUM CONSTRUCTION INC | INTERIOR TENANT ALTERATION TO EXISTING OFFICE SUITE. GENERAL CONSTRUCTION OF NON BEARING INTERIOR PARTITIONS AND FINISHES. NO CHANGE TO USE,… |
| M08030060 | 304 EAST 12 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 11/04/2022 | — | Owner DAVEAN HOLDINGS LLC Filer RIZZO GROUP | — |
| M08030065 ↗ | 304 EAST 12 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 11/04/2022 | — | — | — |
| M00474974 ↗ | 15 WEST 81 STREET MANHATTAN | Alteration | Signed-off | 07/27/2021 | 10/28/2022 | Contractor ALL DIMENSION HOME IMPROV | INTERIOR RENOVATION OF APT 10D AT THE 10TH FLOOR. GENERAL CONSTRUCTION WORK INCLUDING DEMOLITION AND CONSTRUCTION ON NON-LOAD BEARING PARTIT… |
| B00715311 ↗ | 718 LORIMER STREET BROOKLYN | Alteration | Signed-off | 04/11/2022 | 04/25/2022 | Owner APERTURE HOLDINGS Contractor ALCHEMY DEVELOPMENT Filer JM ZONING, LLC. | FENCE APPLICATION FILED IN CONJUNCTION WITH FACADE WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B00614680 ↗ | 718 LORIMER STREET BROOKLYN | Alteration | Signed-off | 11/11/2021 | 04/19/2022 | Contractor ALCHEMY DEVELOPMENT | FACADE WORK TO REMOVE PORTION OF EXISTING FACADE WINDOW AND DOOR AND REPLACE WITH NEW. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B00499397 ↗ | 56 SHERMAN STREET BROOKLYN | Alteration | Signed-off | 05/11/2021 | 01/05/2022 | Contractor BLACK SQUARE BUILDERS COR Filer JM ZONING, LLC. | Interior renovation of existing 3 story 2 family townhouse as per plans filed herewith. No change in use, egress or occupancy |
| M00546253 ↗ | 2860 BROADWAY MANHATTAN | Alteration | Signed-off | 07/28/2021 | 11/16/2021 | Contractor PRIMEAMERICAN HOME IMPROV | Renovation of Apt 6A on the 6th Floor. Demo and construct non-bearing interior partitions, cabinetry and finishes. |
| B00489041 ↗ | 1 NORTH PIER BROOKLYN | Alteration | Signed-off | 04/07/2021 | 10/27/2021 | Contractor SJG CONSTRUCTION CORP | Herewith filing for removal of portion of the shear wall in the stairwell to install 2 steps within the shear wall itself as per the drawing… |
| B00200646 ↗ | 42 REEVE PLACE BROOKLYN | Alteration | Signed-off | 12/04/2019 | 10/21/2021 | Contractor EMPIREHD, INC | CONSTRUCTION EQUIPMENT FENCE. |
| M00595044 ↗ | 17 WEST 16 STREET MANHATTAN | Alteration | Signed-off | 09/24/2021 | 10/06/2021 | Contractor ARCON PLBG SOLUTIONS | PLUMBING WORK TO INSTALL NEW FLOOR DRAIN AT BASEMENT AND PRESSURE TEST GAS RISER FOR INTEGRITY. ALL AS PER PLAN. |
| B00385016 ↗ | 44 REEVE PLACE BROOKLYN | Alteration | Signed-off | 10/23/2020 | 06/30/2021 | Contractor EMPIREHD, INC | HEREWITH FILING PORTION OF CONSTRUCTION EQUIPMENT FENCE RELATED TO WORK AT ADJOINING LOT AT 42 REEVE PLACE. THIS IS AN EXTENSION OF THE CONS… |
| M00477236 ↗ | 2300 FREDRICK DOUGLASS BL MANHATTAN | Alteration | Signed-off | 03/10/2021 | 04/20/2021 | Contractor ALCHEMY DEVELOPMENT Filer JM ZONING, LLC. | Tenant fit out for ground level office. No impact to structure. Construction of non-loadbearing partitions and millwork. |
| Q00452810 ↗ | 46-01 39 AVENUE QUEENS | Alteration | Permit Issued | 01/18/2021 | 03/03/2021 | Owner METRO MANAGEMENT Contractor PLBG P & H INC | Modify plumbing fixtures in apt #326 , remove kitchen sink & range in apt # 325. |
| Q00452750 ↗ | 46-01 39 AVENUE QUEENS | Alteration | Signed-off | 01/18/2021 | 02/12/2021 | Owner METRO MANAGEMENT Contractor PRIMEAMERICAN HOME IMPROV | Moderate interior renovation of partitions, gwb, trim, tilework, cabinet replacement, mouldings and cosmetic finishes throughout. Non-load b… |
| M00190029 ↗ | 173 EAST BROADWAY MANHATTAN | Alteration | Permit Issued | 01/16/2020 | 03/25/2020 | Owner RUPPERT HOUSING CO INC. Contractor PLBG P & H INC | Plumbing work filed in conjunction with Alt 2 filed under BIS System. No change to egress, occupancy or use. |