Zoned residential, not Manhattan
486 THOMAS S BOYLAND STREET
BROOKLYN · BIN 3429412
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: THOMBOY FACILITIES LLC · 16,292 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction42p · 2 filings · 20 docs
Bulkhead4p · 1 filing · 18 docs
Floor 71p · 1 filing · 18 docs
Floor 6Under Construction49p · 2 filings · 20 docs
Floor 5Under Construction49p · 2 filings · 20 docs
Floor 4Under Construction43p · 2 filings · 20 docs
Floor 3Under Construction43p · 2 filings · 20 docs
Floor 2Under Construction43p · 2 filings · 20 docs
Floor 1Under Construction50p · 2 filings · 20 docs
CellarUnder Construction43p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BBM CONSTRUCTION10909/13/2026
OWNERS REP1504/09/2026
THOMBOY FACILITIES LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1803/21/2026
SPEEDY EXPEDITING6603/21/2026
BSGNY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BBM CONSTRUCTION CORPGeneral Contractor1807/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor504/09/2026
METFLOW FIRE CONTROL LLCFire Protection207/08/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
SOLAR STRING INCGeneral Contractor107/09/2026
CREATIVE PLUMBING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162608/26/2026
MOHAMMAD AHEAD - PROFESSI9286104/01/2026
REGIONAL TESTING CORP.394108/11/2022
Building Lifecycle
All (212)Filed (47)Permit Issued (25)Signed Off (8)Violation (13)Inspection (6)Objection (80)Special Inspection (30)Tax Incentive (3)
09/01/2026
485-x construction completed
08/26/2026
Filed — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-A4
08/25/2026
Signed off — Alteration
SOE filed in conjunction with NB GC # B00716440-I1
B00716448-I1
08/13/2026
Signed off — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-S1
08/12/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/12/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/12/2026
Special inspection requirement — Metering
FAHAD FATEH
08/12/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/12/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
08/12/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/12/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
08/12/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/12/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
08/12/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/12/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/12/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/12/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/12/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
07/22/2026
Signed off — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-S3
07/22/2026
Signed off — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-S2
07/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2026
Signed off — Alteration
B00725298-I1
07/07/2026
Permit issued — Solar
B01344604-I1-SL
07/06/2026
Special inspection requirement — Final
ADITYA DESAI
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD AHEAD
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD AHEAD
06/25/2026
Signed off — Alteration
B00726032-I1
06/25/2026
Signed off — Alteration
Structural specifications filed in conjunction with NB GC # B00716440-I1.
B00725304-I1
06/23/2026
Signed off — Alteration
APPLICATION FILING FOR THE ERECTION OF SHANTY LOCATIONS SITUATED WITHIN THE GROUND FLOOR OF STRUCTURE UNDER CONSTRUCTION. LOCATION WILL BE COORDINATED BY LATEST APPROVED PLANS.
B01274960-I1
06/22/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF IN TILT RACKING SYSTEM.
B01344604-P1
06/19/2026
Special inspection requirement — Final
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2026
Filed — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-A3
06/01/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/01/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/18/2026
Objection resolved — Resolved
05/15/2026
Permit issued — Construction Fence
B00726032-I1-FN
05/14/2026
Permit issued — Curb Cut
B00716440-S4-CC
04/24/2026
Objection raised — Other
04/01/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF IN TILT RACKING SYSTEM.
B01344604-I1
03/24/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/24/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
03/14/2026
Violation issued (ECB, closed)
Unknown
03/14/2026
Violation issued (ECB, closed)
Unknown
03/13/2026
Violation issued (ECB, open)
Construction
03/09/2026
Filed — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-A2
03/09/2026
Violation issued (ECB, closed)
Construction
03/02/2026
Filed — New Building
PROPOSED 6 STORY RESIDENTIAL BUILDING TOTAL OF 87 DWELLING UNITS.
B00716440-A1
02/26/2026
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01309328-P1
02/26/2026
Violation issued (ECB, closed)
Unknown
02/26/2026
Violation issued (ECB, closed)
Unknown
02/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01310422-P1
02/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01310797-P1
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR STRING INC07/07/2026
DOB NOWConstruction FenceSigned-offBBM CONSTRUCTION CORP05/15/2026
DOB NOWCurb CutSigned-offBBM CONSTRUCTION CORP05/14/2026
DOB NOWGeneral ConstructionPermit IssuedBBM CONSTRUCTION CORP01/12/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/16/2025
DOB NOWGeneral ConstructionPermit IssuedBBM CONSTRUCTION CORP11/12/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/29/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC10/29/2025
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC09/16/2025
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/16/2025
DOB NOWSupport of ExcavationSigned-offBBM CONSTRUCTION CORP08/28/2025
DOB NOWPlumbingSigned-offAB PLUMBING INC08/27/2025
DOB NOWGeneral ConstructionPermit IssuedBBM CONSTRUCTION CORP08/26/2025
DOB NOWStructuralSigned-offBBM CONSTRUCTION CORP08/26/2025
DOB NOWFoundationSigned-offBBM CONSTRUCTION CORP08/26/2025
DOB NOWGeneral ConstructionPermit IssuedBBM CONSTRUCTION CORP08/26/2025
DOB NOWMechanical SystemsSigned-offBBM CONSTRUCTION CORP08/26/2025
DOB NOWProtection and Mechanical MethodsSigned-offBBM CONSTRUCTION CORP08/25/2025
DOB NOWConstruction FenceSigned-offBBM CONSTRUCTION CORP05/30/2025
DOB NOWSupport of ExcavationSigned-offBBM CONSTRUCTION CORP06/07/2023
DOB NOWConstruction FenceSigned-offBBM CONSTRUCTION CORP05/31/2023
DOB NOWSupport of ExcavationSigned-offBBM CONSTRUCTION CORP05/25/2022
DOB NOWConstruction FenceSigned-offBBM CONSTRUCTION CORP05/20/2022
1 project · most recent 08/26/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026Signed-offBBM CONSTRUCTION CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin CU-EMR 10,900 BTU · Heat Pump Outdoor ×3
Heat / Cool
Amana HEH07H25 7,700 BTU · Ptac ×115
HEH153H50 14,700 BTU · Ptac ×109
PMH153J41 14,200 BTU · Heat Pump Outdoor ×174
PMH093J21 8,700 BTU · Ptac ×164
PMH123J30 11,200 BTU · Ptac ×56
Daikin RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×4
Heating
Qmark CSH-07A 7,680 BTU · Baseboard ×239
Ventilation
Greenheck G-098-VG 360 CFM · Exhaust Fan ×24
G-097-VG 180 CFM · Exhaust Fan ×9
G-099--VG 510 CFM · Exhaust Fan ×9
G-100-VG 540 CFM · Exhaust Fan ×9
G--098-VG 350 CFM · Exhaust Fan ×6
Renewaire HE1XRT 530 CFM · Heat Pump Outdoor ×3
1 project · most recent 08/26/2026
Sprinkler System
FiledStatusContractorScope
08/26/2026Signed-offMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 08/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Signed-offMETFLOW MECHANICAL LLCStorm, Water/Sanitary
5 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026CompleteS&R ELECTRICAL & MECHANIC—
07/16/2026CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
10/21/2025Permit IssuedSOLAS ELECTRICAL CORP—
09/30/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
09/05/2025CompleteS&R ELECTRICAL & MECHANIC—
2 projects · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Signed-offBBM CONSTRUCTION CORP1 scope_items
11/13/2025Signed-offBBM CONSTRUCTION CORP5 scope_items
1 project · most recent 06/22/2026
FiledStatusContractorScope
06/22/2026Signed-offSOLAR STRING INC26 panels, 14.3 kw, 11,995 roof_area_sqft
3 projects · most recent 02/25/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
02/25/2026Signed-offCORE SCAFFOLD SYSTEMS INCSidewalk Shed
10/28/2025Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
10/13/2025——Sidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/12/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/12/2026Exterior lighting powerFAHAD FATEHenergy_progress
08/12/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/12/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
08/12/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
08/12/2026Air barrier — testing FAHAD FATEHenergy_progress
08/12/2026Maintenance informationFAHAD FATEHenergy_progress
08/12/2026MeteringFAHAD FATEHenergy_progress
08/12/2026Interior lighting powerFAHAD FATEHenergy_progress
08/12/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/12/2026Lighting controlsFAHAD FATEHenergy_progress
08/12/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
08/12/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/12/2026Fenestration air leakageFAHAD FATEHenergy_progress
08/12/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/12/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
08/12/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/12/2026Fenestration areasFAHAD FATEHenergy_progress
07/06/2026FinalADITYA DESAIprogress
07/06/2026Fire-Resistant Penetrations and JointsMOHAMMAD AHEADspecial
07/06/2026Energy Code Compliance InspectionsMOHAMMAD AHEADprogress
06/19/2026Final—progress
06/19/2026Energy Code Compliance Inspections—progress
06/19/2026Fire-Resistant Penetrations and Joints—special
06/01/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 150.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch48
09/03/2026B01344604-P1Request digital key ↗
08/29/2026B00716440-A4Request digital key ↗
08/24/2026B00725298-P3Request digital key ↗
Showing 3 of 48 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
03/10/2025340857585Open ↗
08/10/2022340857585Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/05/2024340857585Open ↗
07/05/2022340857585Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/18/2026B00716440-A4Open ↗
08/13/2026B00716440-P1Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/18/2026B00716440-A4Open ↗
08/13/2026B00716440-P1Open ↗
08/13/2026B00716440-A2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00716440-I1Open ↗
▸Seals & Professional Certifications122
▸DOB NOWSpecial Inspector Seal & Signature49
09/23/2026B00716440-A4Open ↗
09/23/2026B00716440-A4Open ↗
09/21/2026B00716448-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/03/2026B01344604-P1Open ↗
09/03/2026B01344604-I1Open ↗
08/24/2026B00725298-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026B00716440-A4Open ↗
09/23/2026B00716440-A4Open ↗
09/23/2026B00716440-A4Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/05/2022340857585Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/05/2022340857585Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/18/2026B00716440-A2Open ↗
08/18/2026B00716440-A4Open ↗
08/15/2026B00716440-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
03/10/2025340857585Open ↗
07/05/2022340857585Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/10/2025340857585Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/18/2026B00716440-S2Open ↗
08/18/2026B00716440-S1Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT9
08/19/2026B00716448-P3Open ↗
08/19/2026B00716448-P2Open ↗
08/19/2026B00716448-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00725298-I1Open ↗
08/13/2026B00716448-I1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026B00725298-I1Open ↗
08/13/2026B00716448-I1Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/10/2025340857585Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/05/2022340857585Open ↗
▸BISADDITIONAL INFORMATION1
08/10/2022340857585Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial5
08/18/2026B00716440-A4Open ↗
08/13/2026B00716440-I1Open ↗
08/13/2026B00716440-A2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/18/2026B00716440-A4Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/18/2026B00716440-A2Open ↗
08/18/2026B00716440-A4Open ↗
08/15/2026B00716440-P4Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
03/10/2025340857585Open ↗
07/05/2022340857585Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/05/2022340857585Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00716448-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B00716440-I1Open ↗