← Back
Primarily 2 family with 1 store or office
49-06 SKILLMAN AVENUE
QUEENS · BIN 4001161
💬 Discuss this project
1930Year Built
2Stories
S2Building Class
R5DZoning
2,556 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · 1,900 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Mechanical
Basement2p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2022$1.5M—Private party → Private party$587/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EK ENGINEERING,P.C.212/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EK ENGINEERING, P.C.6883212/01/2022
Building Lifecycle
All (25)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Inspection (2)Objection (6)Special Inspection (12)
01/12/2023
Signed off — Alteration
DESIGN FOR 1 NEW OIL-FIRED HOT WATER BOILER AS SHOWN ON PLANS. INCLUDING FUEL OIL TANK, FUEL OIL PIPING AND HOT WATER PIPING. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q07995133-I1
12/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
EDWARD KAJA
12/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD KAJA
12/06/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EDWARD KAJA
12/06/2022
Special inspection requirement — Heating Systems
EDWARD KAJA
12/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
EDWARD KAJA
12/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWARD KAJA
12/01/2022
Filed — Alteration
DESIGN FOR 1 NEW OIL-FIRED HOT WATER BOILER AS SHOWN ON PLANS. INCLUDING FUEL OIL TANK, FUEL OIL PIPING AND HOT WATER PIPING. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q07995133-P1
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD KAJA
11/28/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EDWARD KAJA
11/28/2022
Special inspection requirement — Heating Systems
EDWARD KAJA
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWARD KAJA
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
EDWARD KAJA
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
EDWARD KAJA
11/15/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/02/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
10/05/2022
Permit issued — Boiler Equipment
Q07995133-I1-BE
09/19/2022
Objection raised — Admin
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Admin
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Other
09/19/2022
Objection resolved — Addressed
09/16/2022
Filed — Alteration
DESIGN FOR 1 NEW OIL-FIRED HOT WATER BOILER AS SHOWN ON PLANS. INCLUDING FUEL OIL TANK, FUEL OIL PIPING AND HOT WATER PIPING. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Q07995133-I1
10/20/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNICHOLAS A. CANTATORE10/05/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/02/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/06/2022HVAC-R and service water heating equipmentEDWARD KAJAenergy_progress
12/06/2022Fire-Resistant Penetrations and JointsEDWARD KAJAspecial
12/06/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsEDWARD KAJAspecial
12/06/2022Heating SystemsEDWARD KAJAspecial
12/06/2022HVAC-R and service water heating system controlsEDWARD KAJAenergy_progress
12/06/2022HVAC-R and service water piping design and insulationEDWARD KAJAenergy_progress
11/28/2022Fire-Resistant Penetrations and JointsEDWARD KAJAspecial
11/28/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsEDWARD KAJAspecial
11/28/2022Heating SystemsEDWARD KAJAspecial
11/28/2022HVAC-R and service water piping design and insulationEDWARD KAJAenergy_progress
11/28/2022HVAC-R and service water heating equipmentEDWARD KAJAenergy_progress
11/28/2022HVAC-R and service water heating system controlsEDWARD KAJAenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q07995133-P1Request digital key ↗
08/15/2026Q07995133-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026Q07995133-I1Open ↗
09/23/2026Q07995133-I1Open ↗
09/23/2026Q07995133-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q07995133-I1Open ↗
09/23/2026Q07995133-I1Open ↗
09/23/2026Q07995133-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q07995133-I1Open ↗
08/25/2026Q07995133-P1Open ↗