| Owner | Filings | Most Recent |
|---|---|---|
| WDCO NYC MARTINIQUE HOTEL LLC | 359 | 09/23/2026 |
| RELIABLE ENTERPRISES | 18 | 07/08/2026 |
| HKS CONSTRUCTION | 30 | 07/08/2026 |
| PYRAMID RESTORATION NY | 4 | 07/08/2026 |
| MARTINIQUE CURIO BY HILTON | 5 | 04/09/2026 |
| PETER S BROWN 1 | 1 | 03/22/2026 |
| DONALD AFFILIATES, INC | 1 | 03/22/2026 |
| TRI BOROUGH SCAFFOLDING | 2 | 03/22/2026 |
| CUSHMAN & WAKEFIELD | 1 | 03/22/2026 |
| HEROLD HOTEL ASSOCIATES | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SY ENGINEERING PLLC | 9 | 08/25/2026 |
| FL&M ENGINEERING DESIGN &INSPECTION | 23 | 05/11/2026 |
| ARCHELA | 5 | 03/27/2026 |
| ENV ARCHITECTS, DPC | 9 | 03/19/2026 |
| CQ&J CORPORATION | 11 | 12/22/2025 |
| MG ENGINEERING D.P.C. | 2 | 12/05/2025 |
| COSENTINI ASSOCIATES | 13 | 09/15/2025 |
| DESIMONE CONSULTING ENGINEERS | 9 | 09/12/2025 |
| VINCENT J. LIOTTA P.E. | 1 | 07/16/2025 |
| ANCORA ENGINEERING, PLLC | 2 | 03/19/2025 |
| JUST CONSULTING ENGINEERING | 9 | 10/03/2024 |
| WEXLER ASSOCIATES | 1 | 06/10/2024 |
| MUSE ARCHITECTS PLLC | 3 | 01/19/2024 |
| SOUTHPORT ENGINEERING ASSOCIATES PC | 6 | 12/20/2023 |
| BUILDING STUDIO ARCHITECTS | 3 | 12/12/2023 |
| SANDEEP GUNNALA ENGINEERING PLLC | 1 | 10/26/2023 |
| LAUFS ENGINEERING DESIGN | 1 | 07/05/2023 |
| KCE CONSULTING ENGINEERING PLLC | 1 | 03/28/2023 |
| KZ ENGINEERING, P.C | 7 | 12/09/2022 |
| DOKA ENGINEERING PC | 6 | 10/14/2022 |
| ENTHINK ENGINEERS LLC | 3 | 07/11/2022 |
| HAIDER ENGINEERING, P.E. | 3 | 07/25/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 64 | 03/21/2026 |
| THE GREEN STUDIO | 13 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 20 | 03/21/2026 |
| SEAY-YARBROUGH | 10 | 03/21/2026 |
| LDC CONSULTANTS | 8 | 03/21/2026 |
| BARNWELL CONSULTANTS | 10 | 03/21/2026 |
| BMB BUILDING CONSULTING | 2 | 03/21/2026 |
| BOYD CONSULTING | 4 | 03/21/2026 |
| HAIDER ENGINEERING, P.E. | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TRI BOROUGH SCAFFOLDING | General Contractor | 31 | 07/08/2026 |
| B&B CONTRACTING GRP LLC | General Contractor | 23 | 07/08/2026 |
| PENTA RESTORATION CORP | General Contractor | 22 | 09/01/2026 |
| DE LUX CONSTRUCTION INC | General Contractor | 16 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 16 | 08/16/2026 |
| HKS CONSTRUCTION CORP | General Contractor | 15 | 07/08/2026 |
| RELIABLE ENTERPRISES INC | General Contractor | 14 | 07/08/2026 |
| INTEGRAL CONTRACTING SER | General Contractor | 13 | 07/08/2026 |
| URBAN MOONSTER CON CORP | General Contractor | 8 | 07/08/2026 |
| DELUX CONSTRUCTION NY COR | General Contractor | 5 | 07/08/2026 |
| TESTERMAN PLBG & HTG INC | Plumbing | 4 | 07/08/2026 |
| PROJECT NOOM INC | General Contractor | 4 | 07/08/2026 |
| SHANNON CONTRACTING LLC | General Contractor | 4 | 07/08/2026 |
| CDS DESIGN AND CONSULTING | General Contractor | 3 | 07/08/2026 |
| AVON PLBG & HTG INC | Fire Protection | 3 | 07/08/2026 |
| JOHN FITZGERALD PLBG &HTG | Plumbing | 3 | 07/08/2026 |
| KJK ELECTRIC INC | Electrical | 3 | 03/22/2026 |
| HYDRONIC CONCEPTS NY PLBG | Fire Protection | 2 | 07/08/2026 |
| TORRES IVAN | Electrical | 2 | 03/21/2026 |
| OTTEN, GERALD | Electrical | 2 | 03/21/2026 |
| INTEGRATED HVAC SYS & SVC | General Contractor | 2 | 04/09/2026 |
| SUPREME CONSTR & MAINT CO | General Contractor | 2 | 04/09/2026 |
| TOJI CONSTRUCTION LLC | General Contractor | 2 | 08/20/2026 |
| BEHNAMBAKHSH, SHAYAN | Electrical | 2 | 03/21/2026 |
| AVON PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SY ENGINEERING PLLC | 5149 | 10 | 08/25/2026 |
| MOHAMMAD AHEAD - PROFESSI | 9286 | 1 | 05/06/2026 |
| AK CONSULTING SERVICES, I | 6198 | 2 | 04/08/2026 |
| ATLAS ATC ENGINEERING INC | 8011 | 35 | 03/19/2026 |
| JOSEPH BOTTA, PE, PC | 1139 | 5 | 01/15/2026 |
| TWIG SPECIAL INSPECTIONS | 885 | 7 | 12/22/2025 |
| RAKSHAN MALEK ASSOCIATES | 3352 | 1 | 10/21/2025 |
| BRIAN ILL DEVELOPMENT LLC | 1402 | 3 | 10/21/2025 |
| JUST CONSULTING ENGINEERI | 5865 | 12 | 09/04/2025 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 07/16/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | I DO PLUMBING & HTG INC | 09/22/2026 |
| DOB NOW | Structural | Permit Issued | PENTA RESTORATION CORP | 08/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TOJI CONSTRUCTION LLC | 08/19/2026 |
| DOB NOW | General Construction | Permit Issued | TOJI CONSTRUCTION LLC | 08/19/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | MC SUPERSTRUCTURE INC | 08/14/2026 |
| DOB NOW | Structural | Permit Issued | PENTA RESTORATION CORP | 07/27/2026 |
| DOB NOW | Structural | Permit Issued | PENTA RESTORATION CORP | 07/09/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PENTA RESTORATION CORP | 05/21/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | MC SUPERSTRUCTURE INC | 05/21/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PENTA RESTORATION CORP | 05/20/2026 |
| DOB NOW | Structural | Permit Issued | PENTA RESTORATION CORP | 05/19/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | MC SUPERSTRUCTURE INC | 05/12/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PENTA RESTORATION CORP | 03/30/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PENTA RESTORATION CORP | 03/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | INTEGRATED HVAC SYS SVC | 03/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | URBAN MOONSTER CON CORP | 03/04/2026 |
| DOB NOW | General Construction | Permit Issued | URBAN MOONSTER CON CORP | 03/04/2026 |
| DOB NOW | General Construction | Permit Issued | DE LUX CONSTRUCTION INC | 02/20/2026 |
| DOB NOW | General Construction | Permit Issued | DE LUX CONSTRUCTION INC | 02/19/2026 |
| DOB NOW | Structural | Permit Issued | PENTA RESTORATION CORP | 02/11/2026 |
| DOB NOW | Plumbing | Signed-off | METROTECH MECHANICAL CORP | 02/04/2026 |
| DOB NOW | Plumbing | Signed-off | UNIVERSAL FIRE SPR LLC | 01/29/2026 |
| DOB NOW | General Construction | Permit Issued | SUPREME CONSTR & MAINT CO | 01/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DE LUX CONSTRUCTION INC | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | DE LUX CONSTRUCTION INC | 12/30/2025 |
| DOB NOW | Construction Fence | Permit Issued | DE LUX CONSTRUCTION INC | 12/11/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STREAMLINE CONSULTANTS NY | 12/04/2025 |
| DOB NOW | Plumbing | Permit Issued | AVON PLBG & HTG INC | 10/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | AVON PLBG & HTG INC | 09/30/2025 |
| DOB NOW | Plumbing | Signed-off | TESTERMAN PLBG & HTG INC | 09/11/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | DE LUX CONSTRUCTION INC | 09/10/2025 |
| DOB NOW | Plumbing | Signed-off | TESTERMAN PLBG & HTG INC | 08/15/2025 |
| DOB NOW | General Construction | Signed-off | SUPREME CONSTR & MAINT CO | 08/14/2025 |
| DOB NOW | Structural | Permit Issued | PENTA RESTORATION CORP | 08/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | INTEGRATED HVAC SYS SVC | 07/21/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | MC SUPERSTRUCTURE INC | 06/10/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | MC SUPERSTRUCTURE INC | 06/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PENTA RESTORATION CORP | 06/02/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STREAMLINE CONSULTANTS NY | 04/22/2025 |
| DOB NOW | General Construction | Permit Issued | DE LUX CONSTRUCTION INC | 04/21/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 11/12/2025 | Permit Issued | DE LUX CONSTRUCTION INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ARWM096BAS5 96,000 BTU · Vrf Outdoor ×1 Mitsubishi Electric PQRY-P120YLMU-A1 120,000 BTU · Vrf Outdoor ×1 Florida Heat Pump EC-096 8 tons · Wshp ×1 Ventilation Greenheck SQ-99-VG 1,200 CFM · Exhaust Fan ×2 BCF-110-15 2,320 CFM · Makeup Air ×1 QEID-20 8,800 CFM · Makeup Air ×1 SP-LP0511 75 CFM · Exhaust Fan ×1 SQ-16-M2 3,750 CFM · Exhaust Fan ×1 SQ-160 3,750 CFM · Makeup Air ×1 SQ-80 225 CFM · Exhaust Fan ×1 |
| 09/15/2025 | Permit Issued | INTEGRAL CONTRACTING SER | Heating and Air Conditioning Systems | Heat / Cool Trane ×2 |
| 09/15/2025 | Permit Issued | B&B CONTRACTING GRP LLC | Heating and Air Conditioning Systems | Heat / Cool Carrier 50PSH024 1,095 CFM · Rooftop Unit ×2 Comfort Aire HBV042 1,150 CFM · Wshp ×2 Trane GEVE090 2,625 CFM · Furnace ×2 |
| 07/16/2025 | Permit Issued | INTEGRATED HVAC SYS & SVC | Air Conditioning Systems | Cooling Lg ARNU153CEA4 18,000 BTU · Vrf Indoor ×19 ARNU183CFA4 18,000 BTU · Vrf Indoor ×14 ARNU483NKA4 4 tons · Vrf Indoor ×10 ARNU243CFA4 18,000 tons · Vrf Indoor ×6 ARUM192DTE5 16 tons · Vrf Outdoor ×6 ARNU483B8A4 4 tons · Vrf Indoor ×5 ARNU543NKA4 5 tons · Vrf Indoor ×3 ARUM241DTE5 20 tons · Vrf Outdoor ×3 ARUN060GSS4 5 tons · Vrf Outdoor ×3 ARNU243NJA4 2 tons · Vrf Indoor ×1 ARNU363NJA4 3 tons · Vrf Indoor ×1 ARUM072DTE5 6 tons · Vrf Outdoor ×1 Evapco AT-14-2EA 25 tons · Cooling Tower ×1 |
| 05/01/2024 | Permit Issued | TOJI CONSTRUCTION LLC | Air Conditioning Systems, Heating Systems | Cooling Lg ARNU183TQD4 19,100 BTU · Vrf Indoor ×13 ARNU123TRD4 12,300 BTU · Vrf Indoor ×10 ARWM121BAS5 119,700 BTU · Vrf Outdoor ×3 ARNU183TSA4 19,100 BTU · Vrf Indoor ×2 ARNU543M3A4 54,000 BTU · Vrf Indoor ×2 ARNU183M1A4 19,100 BTU · Vrf Indoor ×1 ARNU483M3A4 48,100 BTU · Vrf Indoor ×1 ARWM168BAS5 168,000 BTU · Vrf Outdoor ×1 Heating |
| 08/15/2023 | Permit Issued | DELUX CONSTRUCTION NY COR | Associated Ducts and Piping, Heating and Air Conditioning Systems | Heat / Cool Heat Controller HBH060A3C30CCS 5 tons · Heat Pump Outdoor ×2 Ducts & Piping N/A n/a 1,600 CFM · Ductwork ×1 |
| 10/14/2022 | Permit Issued | INTEGRAL CONTRACTING SER | Air Conditioning Systems, Heating Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/05/2025 | Signed-off | UNIVERSAL FIRE SPR LLC | Sprinkler System |
| 09/15/2025 | Permit Issued | DEMAR PLUMBING CORP | 232 heads |
| 10/23/2023 | Permit Issued | BENT MECHANICAL CORP | — |
| 08/21/2023 | Permit Issued | NEW YORK STANDARD MECH CO | 32 heads |
| 05/05/2020 | Permit Issued | BENT MECHANICAL CORP | 69 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/05/2025 | Signed-off | METROTECH MECHANICAL CORP | Water/Sanitary |
| 11/12/2025 | Signed-off | NEW PHASE PLUMBING & HEAT | Gas, Water/Sanitary |
| 09/15/2025 | — | — | — |
| 09/15/2025 | Permit Issued | DEMAR MECHANICAL INC | Gas, Water/Sanitary |
| 09/15/2025 | Permit Issued | HYDRONIC CONCEPTS NY P&H | Gas, Water/Sanitary |
| 10/10/2024 | Permit Issued | I DO PLUMBING & HTG INC | Water/Sanitary |
| 08/15/2023 | Signed-off | TESTERMAN PLBG & HTG INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 03/04/2026 | Permit Issued | CEDAR ELEC'L CONT'RS INC. | General Wiring |
| 01/16/2026 | Permit Issued | KJK ELECTRIC INC | 1 meters, 1 new_meters |
| 12/20/2025 | Permit Issued | CEDAR ELEC'L CONT'RS INC. | General Wiring |
| 12/11/2025 | Permit Issued | BAY ELECTRIC INC. | General Wiring |
| 11/26/2024 | Permit Issued | KJK ELECTRIC INC | — |
| 11/26/2024 | Permit Issued | KJK ELECTRIC INC | General Wiring |
| 10/31/2024 | Complete | CEDAR ELEC'L CONT'RS INC. | General Wiring |
| 09/05/2024 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 08/26/2024 | Complete | LIPPOLIS ELECTRIC, INC. | General Wiring |
| 01/07/2024 | Permit Issued | CEDAR ELEC'L CONT'RS INC. | — |
| 12/05/2023 | Complete | LIPPOLIS ELECTRIC, INC. | General Wiring |
| 09/25/2023 | Permit Issued | WEBSITE ELECTRIC CORP. | General Wiring |
| 08/23/2023 | Complete | KJK ELECTRIC INC | General Wiring |
| 08/14/2023 | Complete | ROBERT CHIMENTI | 8 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/12/2025 | Permit Issued | DE LUX CONSTRUCTION INC | Steel, Concrete |
| 09/12/2025 | Permit Issued | INTEGRAL CONTRACTING SER | 1 scope_items |
| 03/19/2025 | Permit Issued | PENTA RESTORATION CORP | Steel |
| 07/05/2023 | Permit Issued | PENTA RESTORATION CORP | Steel, Concrete |
| 03/28/2023 | Permit Issued | PENTA RESTORATION CORP | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2026 | Permit Issued | MC SUPERSTRUCTURE INC | Sidewalk Shed |
| 02/09/2026 | Permit Issued | MC SUPERSTRUCTURE INC | Scaffold |
| 12/09/2025 | Permit Issued | DE LUX CONSTRUCTION INC | Fence |
| 11/12/2025 | Permit Issued | DE LUX CONSTRUCTION INC | Fence |
| 02/25/2022 | Permit Issued | TRI BOROUGH SCAFFOLDING | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/12/2025 | Permit Issued | DE LUX CONSTRUCTION INC | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | Permit Issued | PENTA RESTORATION, CORP | — |
| 04/08/2026 | Permit Issued | PENTA RESTORATION CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/08/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/03/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/10/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/20/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/12/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/19/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/25/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/18/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/18/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 10/31/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/31/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/24/2026 | Tenant Protection Plan Compliance | SUNGBOM YI | special |
| 05/29/2026 | Fire-Resistance Rated Construction | RONALD GRAPIN | progress |
| 05/29/2026 | Structural Stability – Alterations of existing buildings | RONALD GRAPIN | special |
| 05/29/2026 | Post-installed Anchors | RONALD GRAPIN | special |
| 05/29/2026 | Tenant Protection Plan Compliance | — | special |
| 05/29/2026 | Sprayed fire-resistant materials | GIORGI KHARDZEISHVILI | special |
| 05/29/2026 | Final | RONALD GRAPIN | progress |
| 05/05/2026 | Alternative Materials - OTCR Buildings Bulletin Number | MOHAMMAD AHEAD | special |
| 05/05/2026 | Post-installed Anchors | MOHAMMAD AHEAD | special |
| 05/01/2026 | Post-installed Anchors | GIORGI KHARDZEISHVILI | special |
| 05/01/2026 | Tenant Protection Plan Compliance | — | special |
| 05/01/2026 | Heating Systems | GIORGI KHARDZEISHVILI | special |
| 05/01/2026 | Mechanical Systems | GIORGI KHARDZEISHVILI | special |
| 05/01/2026 | Final | GIORGI KHARDZEISHVILI | progress |
| 04/23/2026 | Alternative Materials - OTCR Buildings Bulletin Number | MAHFUZAR RAHMAN | special |
| 04/23/2026 | Post-installed Anchors | MAHFUZAR RAHMAN | special |
| 04/06/2026 | Final | GIORGI KHARDZEISHVILI | progress |
| 04/06/2026 | Post-installed Anchors | GIORGI KHARDZEISHVILI | special |
| 04/06/2026 | Tenant Protection Plan Compliance | — | special |
| 04/06/2026 | Emergency and Standby Power Systems (Generator) | GIORGI KHARDZEISHVILI | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | GIORGI KHARDZEISHVILI | special |
| 04/06/2026 | Mechanical Systems | GIORGI KHARDZEISHVILI | special |
| 03/27/2026 | Public Assembly Emergency Lighting | Steven Kratchman | progress |
| 03/19/2026 | Final | GIORGI KHARDZEISHVILI | progress |
| 03/19/2026 | Fire-Resistance Rated Construction | GIORGI KHARDZEISHVILI | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Nix & Nox | Mixed Use | Sub-cellar | Project M01360759 Project M01017833 |
| Bronze Owl | Restaurant / Food Service | Sub-cellar, Cellar, Floor 1 | Project M00898431 |
| Martinique Hotel | Office | Sub-cellar, Cellar, Ground, Floors 2, 3 | Project M00825800 Project M00845995 Project M00819788 |