← Back
Factory, industrial, miscellaneous
49 WITHERS STREET
BROOKLYN · BIN 3259667
💬 Discuss this project
1930Year Built
3Stories
F9Building Class
M1-2/R6BZoning
4,999 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Factory, industrial, miscellaneous · Owner of record: SHA- BANGO LLC · 2,500 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHA-BANGO1007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/11/2021$3.0M—— → —$599/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS312/09/2024
IAN M PENDLETON311/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITY BUILDING CORPGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474312/09/2024
XC ENGINEERING PC6692211/27/2024
XC ENGINEERING PC9405104/06/2023
Building Lifecycle
All (73)Filed (6)Permit Issued (3)Signed Off (1)Violation (6)Inspection (3)Objection (24)Special Inspection (30)
02/25/2026
Signed off — Alteration
Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in conjunction with A2 for roof and deck finishes, removal of 1st floor non-load bearing partitions & partial demo
B00848195-S1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/11/2025
Permit issued — Structural
B00848195-S1-ST
01/07/2025
Special inspection requirement — Structural Steel - High Strength Bolting
XIU CHEN
01/07/2025
Special inspection requirement — Structural Steel - Details
XIU CHEN
01/07/2025
Special inspection requirement — Structural Steel - Welding
XIU CHEN
01/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIU CHEN
01/07/2025
Special inspection requirement — Final
XIU CHEN
12/31/2024
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Sprayed fire-resistant materials
XIU CHEN
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Fenestration air leakage
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Fenestration areas
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PHILIP TOSCANO
12/17/2024
Special inspection requirement — Insulation placement and R values
PHILIP TOSCANO
12/09/2024
Filed — Alteration
Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in conjunction with A2 for roof and deck finishes, removal of 1st floor non-load bearing partitions & partial demo
B00848195-P4
12/09/2024
Objection raised — Scope
12/09/2024
Objection raised — Scope
11/27/2024
Filed — Alteration
Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in conjunction with A2 for roof and deck finishes, removal of 1st floor non-load bearing partitions & partial demo
B00848195-P3
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIU CHEN
10/16/2024
Special inspection requirement — Structural Steel - Details
XIU CHEN
10/16/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIU CHEN
10/16/2024
Special inspection requirement — Structural Steel - Welding
XIU CHEN
10/16/2024
Special inspection requirement — Final
XIU CHEN
10/16/2024
Special inspection requirement — Sprayed fire-resistant materials
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Insulation placement and R values
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Fenestration areas
PHILIP TOSCANO
10/16/2024
Special inspection requirement — Fenestration air leakage
PHILIP TOSCANO
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/20/2024
Objection raised — Scope
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Zoning
05/20/2024
Objection resolved — Addressed
05/16/2024
Filed — Alteration
Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in conjunction with A2 for roof and deck finishes, removal of 1st floor non-load bearing partitions & partial demo
B00848195-P2
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
05/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
05/14/2024
Permit issued — Structural
B00848195-S1-ST
04/21/2024
Filed — Alteration
Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in conjunction with A2 for roof and deck finishes, removal of 1st floor non-load bearing partitions & partial demo
B00848195-P1
03/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/26/2024
Permit issued — General Construction
B00848195-I1-GC
05/11/2023
Objection raised — Other
05/11/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Cost
04/14/2023
Objection resolved — Addressed
04/13/2023
Filed — Alteration
Application filed to install second floor lower roof replacement joist, new roof terrace joist and ancillary structure. Application filed in conjunction with A2 for roof and deck finishes, removal of 1st floor non-load bearing partitions & partial demo
B00848195-S1
04/12/2023
Objection raised — Structural
04/12/2023
Objection resolved — Addressed
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offINFINITY BUILDING CORP03/11/2025
DOB NOWStructuralSigned-offINFINITY BUILDING CORP05/14/2024
DOB NOWGeneral ConstructionPermit IssuedINFINITY BUILDING CORP02/26/2024
BISBLISSUEDJ D MASTERS PLBG & HTG06/27/2002
BISPLISSUEDJD MASTERS PLBG & HTG05/13/2002
BISOTISSUEDDEIDAN INDUSTRIES LTD04/30/2002
BISMHISSUEDDEIDAN INDUSTRIES LTD04/30/2002
BISPLISSUEDJ D MASTERS PLBG & HTG06/15/2001
BIS—ISSUEDM & R WOODWORKING & FINISHING04/12/2001
BISEQISSUEDM & R WOODWORKING & FINISHING04/12/2001
BISOTISSUEDDEIDAN INDUSTRIES LTD03/14/2000
1 project · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedTOP NOTCH ELECTRIC INCGeneral Wiring
1 project · most recent 12/09/2024
Steel Masonry Wood
FiledStatusContractorScope
12/09/2024Signed-offINFINITY BUILDING CORPSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
01/07/2025Structural Steel - High Strength BoltingXIU CHENspecial
01/07/2025Structural Steel - DetailsXIU CHENspecial
01/07/2025Structural Steel - WeldingXIU CHENspecial
01/07/2025Structural Stability – Alterations of existing buildingsXIU CHENspecial
01/07/2025FinalXIU CHENprogress
12/17/2024Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
12/17/2024Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
12/17/2024Sprayed fire-resistant materialsXIU CHENspecial
12/17/2024Energy Code Compliance InspectionsPHILIP TOSCANOprogress
12/17/2024Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
12/17/2024Fenestration air leakagePHILIP TOSCANOenergy_progress
12/17/2024Fenestration areasPHILIP TOSCANOenergy_progress
12/17/2024Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
12/17/2024Insulation placement and R valuesPHILIP TOSCANOenergy_progress
10/16/2024Structural Stability – Alterations of existing buildingsXIU CHENspecial
10/16/2024Structural Steel - DetailsXIU CHENspecial
10/16/2024Structural Steel - High Strength BoltingXIU CHENspecial
10/16/2024Structural Steel - WeldingXIU CHENspecial
10/16/2024FinalXIU CHENprogress
10/16/2024Sprayed fire-resistant materials—special
10/16/2024Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
10/16/2024Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
10/16/2024Energy Code Compliance InspectionsPHILIP TOSCANOprogress
10/16/2024Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
10/16/2024Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
Latest 25 of 36.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00848195-S1Request digital key ↗
08/27/2026B00848195-P1Request digital key ↗
08/27/2026B00848195-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/27/2026B00848195-P2Open ↗
08/15/2026B00848195-I1Open ↗
08/13/2026B00848195-P4Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature20
09/29/2026B00848195-P2Open ↗
09/29/2026B00848195-P2Open ↗
09/29/2026B00848195-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026B00848195-P2Open ↗
09/29/2026B00848195-P2Open ↗
09/01/2026B00848195-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00848195-P2Open ↗
08/27/2026B00848195-I1Open ↗
08/27/2026B00848195-S1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWCertificate of No Harassment3
08/27/2026B00848195-P2Open ↗
08/15/2026B00848195-I1Open ↗
08/13/2026B00848195-P4Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00848195-S1Open ↗
08/13/2026B00848195-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B00848195-I1Open ↗
08/13/2026B00848195-P2Open ↗
08/13/2026B00848195-P4Open ↗