Unlicensed parking lot
490 EAST TREMONT AVENUE
BRONX · Tremont · BIN 2113756
💬 Discuss this project
0Year Built
—Stories
G7Building Class
C4-5XZoning
0 sfGross Floor Area
0Units
6 Open Violations 4 unresolved · 2 paperwork only ▸
Unlicensed parking lot · Owner of record: 490 EAST TREMONT REALTY LLC · 3,375 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction61p · 1 filing · 20 docs
Floor 5Under Construction83p · 2 filings · 20 docs
Floor 4Under Construction83p · 2 filings · 20 docs
Floor 3Under Construction82p · 1 filing · 20 docs
Floor 2Under Construction51p · 1 filing · 20 docs
Floor 1Under Construction82p · 1 filing · 20 docs
CellarUnder Construction78p · 1 filing · 20 docs
Site & exteriorUnder Construction27p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PIONEER BUILDERS GROUP3807/08/2026
KDL CONSTRUCTION DEVELOPMENT GROU1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1203/21/2026
BAY RIDGE BUILDINGS CONSU103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KDL CONSTRUCTION & DEVELOGeneral Contractor1207/08/2026
PRECISION HOIST & SCAFFO*General Contractor307/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,13521209/18/2026
JZN ENGINEERING, PC.363305/20/2025
Building Lifecycle
All (161)Filed (20)Permit Issued (16)Signed Off (1)Violation (16)Inspection (25)Objection (53)Special Inspection (30)
09/18/2026
Filed — New Building
CONSTRUCTION OF A 5 STORY MEDICAL OFFICE NEW BUILDING AS PER PLANS FILED HEREWITH.
X01169510-P5
08/19/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
X01333435-P1
07/21/2026
Violation issued (ECB, closed)
Construction
07/21/2026
Violation issued (ECB, closed)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
06/17/2026
Special inspection requirement — Standpipe Systems
JOHN SEMIOLI
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
06/17/2026
Special inspection requirement — Sprinkler Systems
JOHN SEMIOLI
06/17/2026
Special inspection requirement — Maintenance information
JOHN SEMIOLI
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
06/03/2026
Permit issued — Structural
X01169510-S1-ST
06/03/2026
Violation issued (ECB, closed)
Construction
06/03/2026
Violation issued (ECB, closed)
Construction
06/02/2026
Signed off — New Building
CONSTRUCTION OF A 5 STORY MEDICAL OFFICE NEW BUILDING AS PER PLANS FILED HEREWITH.
X01169510-S6
05/27/2026
Filed — New Building
CONSTRUCTION OF A 5 STORY MEDICAL OFFICE NEW BUILDING AS PER PLANS FILED HEREWITH.
X01169510-P4
05/06/2026
Special inspection requirement — Standpipe Systems
JOHN SEMIOLI
05/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
05/06/2026
Special inspection requirement — Maintenance information
JOHN SEMIOLI
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
05/06/2026
Special inspection requirement — Sprinkler Systems
JOHN SEMIOLI
05/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
05/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
05/05/2026
Permit issued — Construction Fence
X01211802-I1-FN
05/01/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/30/2026
Violation issued (ECB, open)
Construction
04/30/2026
Violation issued (ECB, open)
Construction
04/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2026
Permit issued — General Construction
X01169510-I1-GC
04/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/27/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/23/2026
Permit issued — General Construction
X01169510-I1-GC
03/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/04/2026
Permit issued — Standpipe
X01169510-S5-PL
03/02/2026
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
X01333427-P1
02/27/2026
Permit issued — Mechanical Systems
X01169510-S4-MS
02/22/2026
Violation issued (ECB, closed)
Construction
02/22/2026
Violation issued (ECB, closed)
Unknown
02/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Admin
01/06/2026
Objection resolved — Addressed
12/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/17/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
X01333435-I1
12/17/2025
Filed — Alteration
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
X01335662-I1
12/17/2025
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
X01333427-I1
12/17/2025
Permit issued — Supported Scaffold
X01333435-I1-SF
12/17/2025
Permit issued — Protection and Mechanical Methods
X01335662-I1-PMM
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedKDL CONSTRUCTION & DEVELO06/03/2026
DOB NOWConstruction FencePermit IssuedKDL CONSTRUCTION & DEVELO05/05/2026
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO04/10/2026
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO03/23/2026
DOB NOWStandpipePermit IssuedWATSON'S PLBG, HTG, & BDG03/04/2026
DOB NOWMechanical SystemsPermit IssuedKDL CONSTRUCTION & DEVELO02/27/2026
DOB NOWSupported ScaffoldPermit IssuedPRECISION HOIST & SCAFFO*12/17/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRECISION HOIST & SCAFFO*12/17/2025
DOB NOWSidewalk ShedPermit IssuedPRECISION HOIST & SCAFFO*12/17/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/14/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/14/2025
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO07/15/2025
DOB NOWSupport of ExcavationSigned-offKDL CONSTRUCTION & DEVELO07/03/2025
DOB NOWEarth WorkPermit IssuedKDL CONSTRUCTION & DEVELO06/02/2025
DOB NOWStructuralPermit IssuedKDL CONSTRUCTION & DEVELO06/02/2025
DOB NOWConstruction FencePermit IssuedKDL CONSTRUCTION & DEVELO04/24/2025
1 project · most recent 09/18/2026
Sprinkler System
FiledStatusContractorScope
09/18/2026——Sprinkler System
1 project · most recent 09/18/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/18/2026Permit IssuedWATSON'S PLBG, HTG, & BDGPlumbing-Sprinkler, Storm, Water/Sanitary
4 projects · most recent 07/12/2026
General Wiring
FiledStatusContractorScope
07/12/2026Permit IssuedTF ELECTRICAL CORPGeneral Wiring
02/05/2026Permit IssuedOHM PRO ELECTL CONST CORPGeneral Wiring
11/20/2025Permit IssuedNASH ELECTRIC SERVICES IN—
06/13/2025Permit IssuedC.Q. ELECTR'L CONTRG CORPGeneral Wiring
1 project · most recent 09/18/2026
Steel Concrete
FiledStatusContractorScope
09/18/2026Permit IssuedKDL CONSTRUCTION & DEVELOSteel, Concrete
3 projects · most recent 08/19/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/19/2026Permit IssuedPRECISION HOIST & SCAFFO*Scaffold
03/02/2026Permit IssuedPRECISION HOIST & SCAFFO*Sidewalk Shed
04/24/2025Permit IssuedKDL CONSTRUCTION & DEVELOFence
1 project · most recent 09/18/2026
Earthwork
FiledStatusContractorScope
09/18/2026Permit IssuedKDL CONSTRUCTION & DEVELOEarthwork
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
05/01/2026Pass-Final PL - UndergroundPassView ↗
04/17/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/17/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/13/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/09/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
06/17/2026HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
06/17/2026Maintenance informationJOHN SEMIOLIenergy_progress
06/17/2026HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
06/17/2026HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
06/17/2026Sprinkler SystemsJOHN SEMIOLIspecial
06/17/2026Standpipe SystemsJOHN SEMIOLIspecial
06/17/2026Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
06/17/2026Energy Code Compliance InspectionsJOHN SEMIOLIprogress
05/06/2026Sprinkler SystemsJOHN SEMIOLIspecial
05/06/2026Standpipe SystemsJOHN SEMIOLIspecial
05/06/2026Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
05/06/2026HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
05/06/2026Maintenance informationJOHN SEMIOLIenergy_progress
05/06/2026HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
05/06/2026HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
05/06/2026Energy Code Compliance InspectionsJOHN SEMIOLIprogress
10/13/2025Electrical motors and elevatorsJOHN SEMIOLIenergy_progress
07/24/2025MeteringJOHN SEMIOLIenergy_progress
07/18/2025HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
07/18/2025Fenestration air leakageJOHN SEMIOLIenergy_progress
07/18/2025Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
07/18/2025Air barrier - visual inspectionJOHN SEMIOLIenergy_progress
07/18/2025Fenestration areasJOHN SEMIOLIenergy_progress
07/18/2025Insulation placement and R valuesJOHN SEMIOLIenergy_progress
07/18/2025Protection of exposed foundation insulationJOHN SEMIOLIenergy_progress
Latest 25 of 71.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/19/2026X01211802-I1Request digital key ↗
08/18/2026X01169510-I1Request digital key ↗
08/18/2026X01169510-P4Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
05/05/2025240361559Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/05/2025240361559Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X01169510-I1Open ↗
08/13/2026X01169510-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01169510-P3Open ↗
08/13/2026X01169510-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X01169510-I1Open ↗
08/13/2026X01169510-P3Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/20/2026X01333435-P1Open ↗
08/18/2026X01169510-P4Open ↗
08/18/2026X01169510-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026X01169510-S3Open ↗
09/23/2026X01169510-P3Open ↗
09/23/2026X01169510-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026X01169510-P3Open ↗
08/30/2026X01169510-S4Open ↗
08/30/2026X01169510-S4Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/05/2025240361559Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/05/2025240361559Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X01169510-I1Open ↗
08/13/2026X01169510-P3Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026X01169510-I1Open ↗
08/13/2026X01169510-P3Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/05/2025240361559Open ↗
▸BISSTREET TREE CHECKLIST1
05/05/2025240361559Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01169510-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026X01169510-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01169510-S6Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
05/05/2025240361559Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/05/2025240361559Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification2
08/18/2026X01169510-I1Open ↗
08/18/2026X01169510-P3Open ↗
▸DOB NOWGeotechnical Peer Review Report (BC 1818)2
08/13/2026X01169510-P2Open ↗
08/13/2026X01169510-S2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026X01169510-I1Open ↗
08/13/2026X01169510-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X01169510-P3Open ↗
08/13/2026X01169510-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01169510-S2Open ↗
08/13/2026X01169510-S6Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/05/2025240361559Open ↗