490 GREENWICH STREET
MANHATTAN · BIN 1076084
💬 Discuss this project
1930Year Built
6Stories
RMBuilding Class
C6-2AZoning
55,667 sfGross Floor Area
18Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 500 GREENWICH ST CONDOMINIUM · 10,915 sf lot · 5.1 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 4 filings · 20 docs
PenthouseUnder Construction7p · 2 filings · 20 docs
Floor 6Under Construction9p · 2 filings · 20 docs
Floor 5Under Construction8p · 3 filings · 20 docs
Floor 4Under Construction6p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 20 docs
Floor 2Under Construction16p · 4 filings · 20 docs
Floor 1Under Construction16p · 3 filings · 20 docs
Mezzanine4p · 2 filings · 19 docs
CellarUnder Construction6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHOICE NEW YORK PROPERTY MANAGEMENT309/08/2026
500 GREENWICH STREET CONDOMINIUM2503/22/2026
500 GREENWICH103/22/2026
CAM AND Z INVESTORS CO.203/22/2026
CAM Z WVESTORS CO.103/22/2026
500 GREENWICH STREET ASSOCIATES303/22/2026
INDEVER203/21/2026
SMS LLC203/21/2026
THE GOLDBERG GROUP INC103/21/2026
BWY YANG REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
BUILDING BROTHERS203/21/2026
CODE1803/21/2026
YBL NY603/21/2026
PINNACLE BUILDING CON103/21/2026
CASA GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LOFT CONTRACTING NEW YORKGeneral Contractor507/08/2026
ASR ENGINEERING PCElectrical303/21/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
COURTESY PLUMBING INCPlumbing207/08/2026
MUSCARELLA, JAMESElectrical103/21/2026
PETERSON, TAYLORElectrical103/21/2026
SMITH, STEPHENElectrical103/21/2026
TODARO JOSEPHElectrical103/21/2026
TOG CONSTRUCTION CORPElectrical103/21/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
AIR DEPOT COMM. REFR. CORGeneral Contractor107/08/2026
AP HVAC INCGeneral Contractor106/28/2026
KALE CONSTRUCTION INCGeneral Contractor109/03/2026
MICHAEL JAMES INDUSTRIESGeneral Contractor107/08/2026
PO DESIGN CREATION CORPGeneral Contractor107/08/2026
TOROVOLI CONSTRUCTION INCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
ARIANA CONTRACTING INCPlumbing107/08/2026
COD PLUMBING CORPPlumbing107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
P.S.I. MECHANICALPlumbing109/08/2026
ALEXANDER FEDERICO.JRElectrical103/21/2026
ACTIVE SIGNSScaffold107/08/2026
BORRESS, HOWARDElectrical103/21/2026
DIFUSCO, NICOLINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.8628106/16/2026
PCMARCHITECTS PLLC2812302/12/2026
SHAHRISH SHUVO ENGINEERIN8524108/18/2025
ANETONNE ARCHITECTURE P.C7293102/10/2025
A&B WORLD CONSULTING, INC5704304/02/2024
M. INT'L ENGINEERING PLLC3129303/10/2023
LONGTIN SOLUTIONS LLC8320110/04/2022
D'ANTONIO CONSULTING ENGI931903/07/2022
UNFOLD ARCHITECT7707211/13/2021
ANDREW GOODRICH, P.E., PL965106/28/2021
Building Lifecycle
All (162)Filed (27)Permit Issued (21)Signed Off (10)Violation (44)Inspection (20)Objection (10)Special Inspection (30)
09/04/2026
Permit issued — Plumbing
M01416420-I1-PL
09/02/2026
Permit issued — Mechanical Systems
M01416402-I1-GC-CX
07/30/2026
Objection resolved — Addressed
06/18/2026
Objection raised — Scope
06/16/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT UNIT # 202 @ 2ND FL WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01416402-I1
06/16/2026
Filed — Alteration
M01416420-I1
03/25/2026
Signed off — Alteration
CAP AND REMOVAL 1 SHOWER AND 1 H.W.H. AT 1ST FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00298858-I1
03/03/2026
Special inspection requirement — Air barrier - visual inspection
Sugnam Chang
03/03/2026
Special inspection requirement — Interior lighting power
Sugnam Chang
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sugnam Chang
03/03/2026
Special inspection requirement — Fenestration areas
Sugnam Chang
03/03/2026
Special inspection requirement — Fenestration air leakage
Sugnam Chang
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Sugnam Chang
03/03/2026
Special inspection requirement — Insulation placement and R values
Sugnam Chang
03/03/2026
Special inspection requirement — Lighting controls
Sugnam Chang
03/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Sugnam Chang
02/12/2026
Filed — Alteration CO
M00539629-P2
09/30/2025
Permit issued — Mechanical Systems
M01266342-I1-MS
08/18/2025
Filed — Alteration
M01266342-I1
06/04/2025
Violation issued (HPD, closed)
A
04/18/2025
Special inspection requirement — Air barrier - visual inspection
Sugnam Chang
04/18/2025
Special inspection requirement — Fenestration air leakage
Sugnam Chang
04/18/2025
Special inspection requirement — Interior lighting power
Sugnam Chang
04/18/2025
Special inspection requirement — Fenestration areas
Sugnam Chang
04/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Sugnam Chang
04/18/2025
Special inspection requirement — Insulation placement and R values
Sugnam Chang
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Sugnam Chang
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sugnam Chang
04/18/2025
Special inspection requirement — Lighting controls
Sugnam Chang
02/28/2025
Signed off — Alteration
DIRECT REPLACEMENT OF EXISTING HVAC UNITS AT 5TH FLOOR AND ROOF WITH NEW UNITS, AS PER PLANS SUBMITTED HEREWITH. EXISTING SUPPORTS, DUCTWORK, CONTROLS AND ACCESSORIES TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING DUE TO THE PROPOSED WORK.
M01166309-I1
02/26/2025
Permit issued — Mechanical Systems
M01166309-I1-MS
02/10/2025
Filed — Alteration
DIRECT REPLACEMENT OF EXISTING HVAC UNITS AT 5TH FLOOR AND ROOF WITH NEW UNITS, AS PER PLANS SUBMITTED HEREWITH. EXISTING SUPPORTS, DUCTWORK, CONTROLS AND ACCESSORIES TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING DUE TO THE PROPOSED WORK.
M01166309-I1
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Augustine Angba
01/13/2025
Special inspection requirement — Final
Augustine Angba
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Augustine Angba
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Augustine Angba
01/13/2025
Special inspection requirement — Mechanical Systems
TOBECHI CHINDOH
01/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Augustine Angba
09/05/2024
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00548166-I1
06/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
04/02/2024
Filed — Alteration
CAP AND REMOVAL 1 SHOWER AND 1 H.W.H. AT 1ST FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00298858-P1
04/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
02/29/2024
Permit issued — Plumbing
M00298858-I1-PL
02/29/2024
Permit issued — Plumbing
M87580298-I1-PL
02/27/2024
Signed off — Alteration
file alteration type 2 for installation of new bathroom, and reconfiguration of laundry
M00625601-I1
11/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/02/2023
Signed off — Alteration
PLUMBING AND SPRINKLER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION, NO CHANG IN USE, EGRESS AND OCCUPANCY.
M00685153-I1
03/20/2023
Signed off — Alteration
SUBSEQUENT FILING FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH APPLICATION #M00539629. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00709529-I1
03/15/2023
Violation issued (HPD, closed)
A
03/10/2023
Filed — Alteration
PLUMBING AND SPRINKLER WORK TYPE IN CONJUNCTION WITH ALT-1 APPLICATION, NO CHANG IN USE, EGRESS AND OCCUPANCY.
M00685153-P3
03/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
03/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Kevin McCray
03/10/2023
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
01/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedP.S.I. MECHANICAL09/04/2026
DOB NOWMechanical SystemsPermit IssuedKALE CONSTRUCTION INC09/02/2026
DOB NOWMechanical SystemsPermit IssuedAP HVAC09/30/2025
DOB NOWMechanical SystemsSigned-offMICHAEL JAMES INDUSTRIES02/26/2025
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC02/29/2024
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC02/29/2024
DOB NOWMechanical SystemsSigned-offAIR DEPOT COMM REFR COR10/18/2022
DOB NOWPlumbingSigned-offJEM FIRE PREVENTION INC06/24/2022
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN04/14/2022
DOB NOWSignSigned-offACTIVE SIGNS INC04/05/2022
DOB NOWGeneral ConstructionPermit IssuedTOROVOLI CONSTRUCTION INC03/18/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/02/2022
DOB NOWGeneral ConstructionPermit IssuedPO DESIGN CREATION CORP03/01/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/20/2021
DOB NOWGeneral ConstructionSigned-offLOFT CONTRACTING NEW YORK07/15/2021
DOB NOWMechanical SystemsSigned-offLOFT CONTRACTING NEW YORK07/14/2021
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC07/12/2021
DOB NOWMechanical SystemsSigned-offLOFT CONTRACTING NEW YORK06/16/2021
DOB NOWGeneral ConstructionSigned-offLOFT CONTRACTING NEW YORK06/10/2021
DOB NOWPlumbingSigned-offEDGECOMBE PLBG & HTG INC03/13/2020
DOB NOWBoiler EquipmentPermit IssuedEDGECOMBE PLBG & HTG INC03/12/2020
BISSPISSUEDPLUMBING WORKS CORP11/08/2019
BISPLISSUEDBYPASS MECHANICAL CORP05/21/2019
BISOTISSUEDLENNIE CONSTRUCTION CORP05/03/2019
BISMHISSUEDLENNIE CONSTRUCTION CORP05/03/2019
BISMHISSUEDCMP CONTRACTING INC03/28/2019
BISPLISSUEDPRIME PIPING & HEATING IN03/22/2019
BISOTISSUEDCMP CONTRACTING INC03/21/2019
BISBLISSUEDA.M.N. CORPORATION09/22/2017
BISBLISSUEDA.M.N. CORPORATION06/23/2017
BISPLISSUEDA.M.N. CORPORATION04/26/2017
BISBLISSUEDACCURATE MECHANICAL INC01/04/2017
BISSPISSUEDACCURATE MECHANICAL INC09/28/2016
BISPLISSUEDACCURATE MECHANICAL INC09/26/2016
BISOTISSUEDLTI CONSTRUCTION CORP08/01/2016
BISMHISSUEDLTI CONSTRUCTION CORP08/01/2016
BISOTISSUEDEXCEL BUILDERS & RENOVATO12/18/2014
BISPLISSUEDPIPE RITE CORP08/18/2014
BISOTISSUEDEXCEL BUILDERS & RENOVATO08/11/2014
BISEQISSUEDEVEREST SCAFFOLDING INC04/09/2012
+ 31 more permits on file
1 project · most recent 06/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Permit IssuedKALE CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
— MXZ-SM60NL 60,000 BTU · Condensing Unit ×2
3 projects · most recent 07/11/2025
General Wiring
FiledStatusContractorScope
07/11/2025Permit IssuedPRECISION ELECL CONT CORPGeneral Wiring
03/24/2022CompleteW 8 ELECTRIC CORPGeneral Wiring
08/06/2021CompleteCBS ELECTRIC INCGeneral Wiring
1 project · most recent 06/16/2026
FiledStatusContractorScope
06/16/2026Permit IssuedKALE CONSTRUCTION INC1 scope_items
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
06/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
11/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Fail-Final CND-Occupancy InspectionFailView ↗
10/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
03/03/2026Fenestration air leakageSugnam Changenergy_progress
03/03/2026Interior lighting powerSugnam Changenergy_progress
03/03/2026Air barrier - visual inspectionSugnam Changenergy_progress
03/03/2026Energy Code Compliance InspectionsSugnam Changprogress
03/03/2026Insulation placement and R valuesSugnam Changenergy_progress
03/03/2026Fire-Resistant Penetrations and JointsSugnam Changspecial
03/03/2026Fenestration areasSugnam Changenergy_progress
03/03/2026Fenestration and door U-factor and product ratingsSugnam Changenergy_progress
03/03/2026Lighting controlsSugnam Changenergy_progress
04/18/2025Insulation placement and R valuesSugnam Changenergy_progress
04/18/2025Fenestration and door U-factor and product ratingsSugnam Changenergy_progress
04/18/2025Fenestration areasSugnam Changenergy_progress
04/18/2025Interior lighting powerSugnam Changenergy_progress
04/18/2025Air barrier - visual inspectionSugnam Changenergy_progress
04/18/2025Fenestration air leakageSugnam Changenergy_progress
04/18/2025Fire-Resistant Penetrations and JointsSugnam Changspecial
04/18/2025Energy Code Compliance InspectionsSugnam Changprogress
04/18/2025Lighting controlsSugnam Changenergy_progress
01/13/2025Energy Code Compliance InspectionsAugustine Angbaprogress
01/13/2025Mechanical SystemsTOBECHI CHINDOHspecial
01/13/2025HVAC-R and service water piping design and insulationAugustine Angbaenergy_progress
01/13/2025HVAC-R and service water heating equipmentAugustine Angbaenergy_progress
01/13/2025HVAC-R and service water heating system controlsAugustine Angbaenergy_progress
01/13/2025FinalAugustine Angbaprogress
04/10/2024Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
Latest 25 of 82.
▾Documents — 492 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch24
09/03/2026M00515021-I1Request digital key ↗
09/03/2026M00514962-I1Request digital key ↗
09/03/2026M00514962-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/03/2026M00548166-I1Request digital key ↗
08/27/2026M00298858-I1Request digital key ↗
08/27/2026M00298858-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/14/2026M00298856-I1Request digital key ↗
▸Applications & Permits86
▸BISPLAN / WORK APPROVAL APPLICATION54
03/18/2019123658318Open ↗
03/18/2019123706258Open ↗
03/13/2019123716194Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION28
11/08/2019123658318Open ↗
05/22/2019123716194Open ↗
05/03/2019123716194Open ↗
Showing 3 of 28 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
05/17/2018102932383Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/23/2018104933235Open ↗
▸Seals & Professional Certifications145
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
01/30/2020123716194Open ↗
01/30/2020123716194Open ↗
01/30/2020123716194Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/25/2026M00625589-I1Open ↗
09/25/2026M00625589-I1Open ↗
09/23/2026M00298856-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/03/2026M00514962-I1Open ↗
09/03/2026M00514962-P1Open ↗
09/03/2026M00625589-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/25/2026M00625589-I1Open ↗
09/23/2026M00298856-I1Open ↗
09/23/2026M00298856-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
03/18/2019123706258Open ↗
11/21/2016122944029Open ↗
Showing 2 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/18/2019123706258Open ↗
11/21/2016122944029Open ↗
Showing 2 of 6 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
03/18/2019123658318Open ↗
03/13/2019123716194Open ↗
01/09/2018122832168Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
06/05/2017122944029Open ↗
05/30/2017122944029Open ↗
02/01/2017120207212Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/25/2018122832168Open ↗
01/25/2018122832168Open ↗
07/18/2017122832168Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/18/2017122832168Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes8
04/25/2019123658318Open ↗
03/22/2019123716194Open ↗
03/18/2019123658318Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00298858-I1Open ↗
08/13/2026M00298858-P1Open ↗
08/13/2026M00298856-I1Open ↗
▸DOB NOWStreet Tree Checklist3
08/13/2026M00539629-P1Open ↗
08/13/2026M00539629-P2Open ↗
08/13/2026M00539629-I1Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/03/2026M00514962-I1Open ↗
09/03/2026M00514962-P1Open ↗
09/03/2026M00625589-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
03/21/2019123706258Open ↗
03/18/2019123658318Open ↗
03/13/2019123716194Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/30/2020123716194Open ↗
01/30/2020123716194Open ↗
03/18/2019123706258Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/03/2020123706258Open ↗
01/30/2020123716194Open ↗
01/25/2018122832168Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00514962-I1Open ↗
08/19/2026M00539629-I1Open ↗
08/13/2026M00515021-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/03/2020123706258Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: PILE DRIVING2
07/12/2018120266201Open ↗
01/25/2018122832168Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/03/2020123706258Open ↗
08/03/2020123706258Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
08/03/2020123706258Open ↗
01/30/2020123716194Open ↗
01/27/2020123658318Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/30/2020123716194Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
03/01/2018104933235Open ↗
03/13/2017104933235Open ↗
03/13/2017104933235Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
07/12/2018120266201Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
08/03/2020123706258Open ↗
01/30/2020123716194Open ↗
01/27/2020123658318Open ↗
Showing 3 of 26 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/13/2017104933235Open ↗
▸Filing & Intake Forms69
▸BISADDITIONAL INFORMATION33
08/06/2019123658318Open ↗
04/25/2019123658318Open ↗
04/19/2019123658318Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM21
01/30/2020123716194Open ↗
01/27/2020123658318Open ↗
10/01/2018104933235Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET15
03/18/2019123658318Open ↗
03/18/2019123706258Open ↗
03/13/2019123716194Open ↗
Showing 3 of 15 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
01/25/2018122832168Open ↗
Showing 1 of 4 on file for this type
▸BISSupporting Document: Fee Except1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type