← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Emigrant Industrial Savings Bank Building
4951 CHAMBERS STREET · BIN 1079216
💬 Discuss this project
1910Year Built
15Stories
RMBuilding Class
C6-4Zoning
209,951 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized17 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 49 CHAMBERS STREET CONDOMINIUM · 18,919 sf lot · 11.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 20 docs
Floor 71p · 1 filing · 16 docs
Floor 6
Floor 5Under Construction2p · 1 filing · 4 docs
Floor 4
Floor 3
Floor 2
Floor 1Under Construction27p · 8 filings · 20 docs
Mezzanine34p · 7 filings · 20 docs
Basement23p · 15 filings · 20 docs
Sub-BasementUnder Construction41p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRAT ENTERPRISES2109/30/2026
AKAM ASSOCIATES1409/18/2026
IDEKO609/13/2026
IMG3707/08/2026
1760 THIRD OWNER1107/08/2026
88TH AVENUE OWNER1407/08/2026
ANDIAMO SCAFFOLDING LLC103/22/2026
49 CHAMBERS STREET CONDOM203/22/2026
49-51 CHAMBERS10903/22/2026
SCHIMENTI CONSTRUCTION CO203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CROWN DESIGN CONSULTING4603/21/2026
Rigid Structural Design, LLC1403/21/2026
MUNICIPAL BUILDING CONSULTANTS703/21/2026
JM ZONING, LLC.403/21/2026
A1 EXPEDITING SERVICE203/21/2026
OUTSOURCE CONSULTANTS, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHIMENTI CONSTRUCTION COGeneral Contractor2307/08/2026
PRAT ENTERPRISES CORPGeneral Contractor1109/30/2026
NYFF EVENTS LLCGeneral Contractor407/08/2026
ARENA EVENT SERVICES INCGeneral Contractor303/21/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor307/08/2026
NY DEVELOPERS & MANAGEMENTGeneral Contractor303/21/2026
WINICK PRODUCTIONS, LLCGeneral Contractor307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor309/09/2026
NATIONWIDE MECHANICAL INCPlumbing207/08/2026
CMA PLUMBING & HEATING INFire Protection207/08/2026
FULL CAPACITY FIRE CORPFire Protection207/08/2026
TCE PRESENTS LLCGeneral Contractor207/08/2026
FIRST QUALITY ELECT CORPElectrical103/22/2026
RE-CON ELECTRIC INCElectrical103/22/2026
BENT MECHANICAL CORPGeneral Contractor108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN INTEGRATIONS LLC7993208/12/2026
OUTSOURCE SPECIAL INSPECT2827109/12/2025
RYAN SPECIAL ENGINEERING2018302/27/2025
ATLANTIC ENGINEERINGLABOR1381508/19/2022
PROJECTIVE INC.6820808/16/2022
TECNICO SPECIAL INSPECTIO5939209/01/2021
Building Lifecycle
All (221)Filed (71)Permit Issued (48)Signed Off (15)Facade (FISP) (18)Violation (60)Inspection (9)
09/29/2026
Permit issued — Protection and Mechanical Methods
M01443388-I1-PMM
09/17/2026
Permit issued — Suspended Scaffold
M01276163-I1-SC
09/08/2026
Permit issued — Sidewalk Shed
M01120985-I1-SH
08/28/2026
Permit issued — General Construction
M01421846-I1-GC
08/26/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01215903-P2
08/26/2026
Filed — Alteration
Installation of a temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01283018-P1
08/25/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
08/25/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
08/12/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01276163-P1
08/03/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
08/03/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/31/2026
Permit issued — Protection and Mechanical Methods
M01264829-I1-PMM
07/30/2026
Filed — Alteration
Interior renovation @ existing apartment 5G
M01421846-I1
07/29/2026
Signed off — Alteration
Temporary Installations to be used on a temporary event " Financial Conference". All the Installations are to be removed upon completion of the event.
M01392434-I1
07/29/2026
Signed off — Alteration
M01412334-I1
07/24/2026
Filed — Alteration
Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01430574-I1
07/24/2026
Permit issued — Protection and Mechanical Methods
M01430574-I1-PMM
07/22/2026
Violation issued (ECB, open)
Construction
07/22/2026
Violation issued (ECB, open)
Unknown
07/22/2026
Violation issued (ECB, open)
Unknown
07/22/2026
Violation issued (ECB, closed)
Unknown
07/22/2026
Violation issued (ECB, open)
Unknown
07/22/2026
Violation issued (ECB, open)
Unknown
07/16/2026
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01428831-P1
07/13/2026
Permit issued — Protection and Mechanical Methods
M01428831-I1-PMM
07/10/2026
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01428831-I1
06/15/2026
Filed — No Work
M01412333-I1
06/11/2026
Permit issued — General Construction
M01412334-I1-GC
06/09/2026
Filed — Alteration
M01412334-I1
05/19/2026
Permit issued — Supported Scaffold
M01215903-I1-SF
05/18/2026
Permit issued — General Construction
M01186450-I1-GC
05/15/2026
Filed — No Work
M01401626-I1
04/28/2026
Filed — No Work
M01392435-I1
04/28/2026
Permit issued — General Construction
M01392434-I1-GC
04/24/2026
Filed — Alteration
Temporary Installations to be used on a temporary event " Financial Conference". All the Installations are to be removed upon completion of the event.
M01392434-I1
04/09/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01215903-P1
03/26/2026
Violation issued (ECB, closed)
Construction
03/26/2026
Violation issued (ECB, closed)
Unknown
03/26/2026
Violation issued (ECB, closed)
Construction
03/26/2026
Violation issued (ECB, closed)
Construction
03/10/2026
Permit issued — Structural
M01185397-I1-GC
02/03/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01120985-P2
12/11/2025
Violation issued (ECB, closed)
Construction
12/05/2025
Filed — Alteration
Temporary entertainment structures accessory to events inside the event hall. Removed at the end of the programing. No changes to existing structures, use or egress.
M01186450-P3
11/21/2025
Filed — No Work
M01320610-I1
11/21/2025
Filed — Alteration
Temporary entertainment structures accessory to events inside the event hall. Removed at the end of the programing. No changes to existing structures, use or egress.
M01186450-P2
10/30/2025
Signed off — Alteration
M01281812-I1
10/23/2025
Permit issued — Protection and Mechanical Methods
M01283018-I1-PMM
10/22/2025
Filed — Alteration
Installation of a temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01283018-I1
10/07/2025
Permit issued — Suspended Scaffold
M01276163-I1-SC
09/23/2025
Violation issued (ECB, closed)
Construction
09/22/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01276163-I1
09/17/2025
Permit issued — Sidewalk Shed
M01120985-I1-SH
09/15/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Filed — Alteration
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01185397-I1
09/10/2025
Permit issued — General Construction
M01281812-I1-GC
09/08/2025
Filed — Alteration
M01281812-I1
09/08/2025
Filed — No Work
M01281813-I1
08/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/2025
Violation issued (ECB, open)
Construction
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP09/29/2026
DOB NOWSuspended ScaffoldPermit IssuedVICHIHEL RESTORATION INC09/17/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedBENT MECHANICAL CORP08/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP07/31/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP07/24/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP07/13/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC06/11/2026
DOB NOWSupported ScaffoldPermit IssuedPRAT ENTERPRISES CORP05/19/2026
DOB NOWGeneral ConstructionPermit IssuedTCE PRESENTS LLC05/18/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC04/28/2026
DOB NOWStructuralPermit IssuedPRAT ENTERPRISES CORP03/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP10/23/2025
DOB NOWSuspended ScaffoldPermit IssuedPRAT ENTERPRISES CORP10/07/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/17/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/10/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP08/08/2025
DOB NOWSupported ScaffoldPermit IssuedPRAT ENTERPRISES CORP05/30/2025
DOB NOWGeneral ConstructionPermit IssuedTCE PRESENTS LLC05/08/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC10/09/2024
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/20/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC07/19/2023
DOB NOWStructuralPermit IssuedSCHIMENTI CONSTRUCTION CO06/22/2023
DOB NOWMechanical SystemsPermit IssuedSCHIMENTI CONSTRUCTION CO06/22/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC05/08/2023
DOB NOWGeneral ConstructionSigned-offARENA EVENT SERVICES INC09/16/2022
DOB NOWStructuralPermit IssuedSCHIMENTI CONSTRUCTION CO06/30/2022
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO06/29/2022
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO06/29/2022
DOB NOWMechanical SystemsPermit IssuedSCHIMENTI CONSTRUCTION CO06/29/2022
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP04/19/2022
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP04/14/2022
DOB NOWStructuralSigned-offSCHIMENTI CONSTRUCTION CO03/23/2022
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN02/08/2022
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO02/04/2022
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO02/04/2022
DOB NOWStructuralSigned-offNY DEVELOPERS & MANAGEMEN09/30/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC07/01/2021
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO06/29/2021
DOB NOWMechanical SystemsPermit IssuedSCHIMENTI CONSTRUCTION CO06/29/2021
+ 58 more permits on file
1 project · most recent 04/15/2021
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2021Permit IssuedSCHIMENTI CONSTRUCTION COAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
United Cool Air CW5G3ASHA 34,200 BTU ×3
VZWL35G3ATAB-R 378,800 BTU · Wshp ×2
USHO24SR001CANWA5D32SSD 23,300 BTU ×1
Stulz CFU-070-D2G 20 tons · Crac Unit ×3
Water Furnace UVH1803R305PVBAN2A32SSA 378,800 BTU · Condensing Unit ×3
Heating
Bell & Gossett SU-84-2 1,200,000 BTU · Heat Exchanger ×1
Ventilation
Greenheck BSQ-160-7 1,800 CFM · Exhaust Fan ×4
CSP-A390-VG 240 CFM · Exhaust Fan ×4
25 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026Permit IssuedAURORA ELECL CONTG INC—
07/10/2026CompleteSAMMY ELECTRIC SVCS CORP—
10/14/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
09/24/2023CompleteASSET ELECTRIC CORP—
01/25/2023CompletePK ELECTRIC INC—
01/23/2023CompleteD&D ELECTL CONST CO INCGeneral Wiring
10/16/2022CompletePATERNY ELECTRIC INCGeneral Wiring
08/03/2022Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
07/11/2022Permit IssuedACCURATE ELEC'L CORP.General Wiring
02/14/2022Permit IssuedISTRA ELEC'L CONTRS CORPGeneral Wiring
11/19/2021Permit IssuedLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
09/14/2021Permit IssuedRE-CON ELECTRIC INC1 meters, 1 new_meters
08/24/2021Permit IssuedCREGGAN ELECTRIAL CORPGeneral Wiring
04/30/2021Permit IssuedLIVE WIRE ELECTRIC 1 LLC—
01/26/2021CompleteISTRA ELEC'L CONTRS CORPGeneral Wiring
2 projects · most recent 09/12/2025
Steel Concrete
FiledStatusContractorScope
09/12/2025Permit IssuedPRAT ENTERPRISES CORP2 scope_items
08/19/2022Permit IssuedSCHIMENTI CONSTRUCTION COSteel, Concrete
2 projects · most recent 08/26/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/26/2026Permit IssuedPRAT ENTERPRISES CORPScaffold
02/03/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
2 projects · most recent 07/30/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/30/2026Permit IssuedBENT MECHANICAL CORPTenant Protection Plan 72 Hour
09/12/2025Permit IssuedPRAT ENTERPRISES CORPTenant Protection Plan 72 Hour
1 project · most recent 08/12/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/12/2026Permit IssuedPRAT ENTERPRISES CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/25/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/25/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/03/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/03/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/14/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/19/2026Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
08/19/2026Post-installed AnchorsDANNY TRUJILLOspecial
08/19/2026Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
06/24/2026Interior lighting power—energy_progress
06/24/2026Lighting in dwelling units—energy_progress
06/24/2026Final—progress
06/09/2026FinalChristopher Carranoprogress
12/08/2025FinalANDY ENGLER ROTHprogress
12/08/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
12/05/2025FinalANDY ENGLER ROTHprogress
12/05/2025Tenant Protection Plan Compliance—special
05/08/2025Tenant Protection Plan Compliance—special
05/08/2025FinalANDY ENGLER ROTHprogress
04/23/2025Construction Operations Influencing Adjacent StructuresJONAR MADRIAGAspecial
04/23/2025Structural Steel - WeldingJONAR MADRIAGAspecial
04/23/2025Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
04/23/2025Post-installed AnchorsJONAR MADRIAGAspecial
04/23/2025MasonryJONAR MADRIAGAspecial
04/14/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/24/2025FinalNicholas Ferraraprogress
02/24/2025Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
12/28/2023Public Assembly Emergency LightingJUSTIN REDMONDprogress
12/18/2023Public Assembly Emergency LightingJUSTIN REDMONDprogress
12/04/2023Public Assembly Emergency LightingJUSTIN REDMONDprogress
09/14/2023FinalChristopher Carranoprogress
Latest 25 of 62.
▾Documents — 1,050 on file (BIS + DOB NOW)
▸Plans & Drawings72
▸DOB NOWPlans/Sketch32
09/06/2026M00096774-I1Request digital key ↗
09/03/2026M00513002-P1Request digital key ↗
09/03/2026M00513002-I1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly23
09/01/2026M08000046-I1Request digital key ↗
09/01/2026M08000106-I1Request digital key ↗
09/01/2026M08016350-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Structural5
09/02/2026M00449886-I1Request digital key ↗
09/02/2026M00449886-P1Request digital key ↗
09/02/2026M00449849-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/02/2026M00716725-P2Request digital key ↗
Showing 1 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/03/2026M00449808-I1Request digital key ↗
09/03/2026M00449808-P1Request digital key ↗
09/03/2026M00449743-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00434830-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00434867-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00434853-I1Request digital key ↗
▸Applications & Permits224
▸BISPLAN / WORK APPROVAL APPLICATION103
11/25/2025121186821Open ↗
08/02/2022121186821Open ↗
02/01/2022121186821Open ↗
Showing 3 of 103 on file for this type
▸BISWORK PERMIT APPLICATION96
02/04/2022121186821Open ↗
03/02/2020123038006Open ↗
01/27/2020140359449Open ↗
Showing 3 of 96 on file for this type
▸DOB NOWLPC Approval/Permit16
09/03/2026M00449808-P1Open ↗
09/03/2026M00449808-I1Open ↗
09/03/2026M00434830-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/09/2023140933060Open ↗
11/13/2020140933060Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT II: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
07/01/2021121186821Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications240
▸DOB NOWDPL-1: Design Professional Seal & Signature76
09/10/2026M01215903-P2Open ↗
09/10/2026M01215903-P3Open ↗
09/10/2026M01283018-P1Open ↗
Showing 3 of 76 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION52
01/29/2020122177679Open ↗
01/29/2020122177679Open ↗
06/19/2019121186821Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/02/2026M00449743-P1Open ↗
09/02/2026M00449743-P1Open ↗
09/01/2026M00575249-I1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026M00449743-P1Open ↗
09/01/2026M00901825-I1Open ↗
08/31/2026M01186450-P3Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
03/01/2019140835121Open ↗
Showing 1 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/04/2020140933060Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
01/29/2020122952439Open ↗
01/06/2020122952439Open ↗
12/20/2019122952439Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING13
04/23/2021121186821Open ↗
10/09/2020121186821Open ↗
02/24/2020121186821Open ↗
Showing 3 of 13 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
02/04/2022121186821Open ↗
02/04/2022121186821Open ↗
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/25/2020123514893Open ↗
06/25/2020122146114Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan4
09/03/2026M00434830-I1Open ↗
09/03/2026M00434867-I1Open ↗
Showing 2 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/04/2020140933060Open ↗
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/03/2026M00449808-I1Open ↗
09/03/2026M00434867-I1Open ↗
09/02/2026M00449886-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/06/2026M00096774-I1Open ↗
08/21/2026M01185397-I1Open ↗
08/16/2026M01421846-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY29
04/04/2023121186821Open ↗
04/04/2023121186821Open ↗
04/23/2021121186821Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/15/2021121186821Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs146
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
03/01/2021121186821Open ↗
01/28/2021121186821Open ↗
10/27/2020121186821Open ↗
Showing 3 of 47 on file for this type
▸BISLANDMARKS APPROVAL22
11/04/2020140933060Open ↗
Showing 1 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
11/04/2020140933060Open ↗
01/06/2020140407129Open ↗
01/06/2020140407129Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/10/2026M01215903-P3Open ↗
08/23/2026M01215903-P2Open ↗
08/23/2026M01215903-P1Open ↗
Showing 3 of 14 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION13
11/12/2021121186821Open ↗
11/12/2021121186821Open ↗
11/12/2021121186821Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
11/25/2025121186821Open ↗
12/10/2021121186821Open ↗
12/07/2021121186821Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER10
01/15/2020121186821Open ↗
04/12/2019121186821Open ↗
Showing 2 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLANDMARKS SIGNOFF6
07/08/2020140407129Open ↗
07/08/2020140468438Open ↗
07/08/2020140468474Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT25
04/23/2021121186821Open ↗
08/04/2020123514893Open ↗
08/04/2020122146114Open ↗
Showing 3 of 25 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
11/06/2019121186821Open ↗
Showing 1 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Filing & Intake Forms154
▸BISADDITIONAL INFORMATION78
08/04/2022121186821Open ↗
05/04/2022121186821Open ↗
11/04/2021121186821Open ↗
Showing 3 of 78 on file for this type
▸BISBOROUGH INTAKE FORM40
02/04/2022121186821Open ↗
03/25/2020121186821Open ↗
03/23/2020121186821Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING COVER SHEET24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
08/04/2020140933060Open ↗
Showing 1 of 12 on file for this type
▸Other Documents41
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
01/21/2021121186821Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWAlternate Plan 34
09/02/2026M00716725-P2Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAlternate Plan 14
09/02/2026M00716725-P2Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAlternate Plan 24
09/02/2026M00716725-P2Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAlternate Plan 54
09/02/2026M00716725-P2Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAlternate Plan 44
09/02/2026M00716725-P2Open ↗
Showing 1 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
08/21/2026M01276163-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/21/2026M01276163-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAlternate Plan 62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type