← Back
BuildNYC
Elevator cooperative
The Parker Gramercy
5 WEST 14TH STREET · BIN 1078658
💬 Discuss this project
1964Year Built
21Stories
D4Building Class
C6-2MZoning
350,800 sfGross Floor Area
436Units
LL97 CoveredRent Stabilized12 Active Violations 11 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 5 West 14 Owners · 33,550 sf lot · 10.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofProposed Heavy Duty Supported Pipe Scaffold on Roof20p · 4 filings · 20 docs
BulkheadBulkhead repairs6p · 1 filing · 19 docs
Floor 2Storefront awning framing and connections1p · 1 filing · 13 docs
Floor 1Convenience store tenant build outUnder Construction61p · 10 filings · 20 docs
CellarRetail plumbing renovation and sub-meter relocationUnder Construction42p · 3 filings · 20 docs
Site & exteriorUni K Wax50p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5 West 14th Owners4903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Clip Architects209/16/2026
Studios Architecture609/02/2026
Zenith Home Inspections205/12/2026
Gace503/20/2026
Patti & Anthes Consulting Engineers403/19/2026
Age Engineering202/06/2026
Fellenzer Engineering301/27/2026
Prospect Associates110/21/2025
Rigid Structural Design209/05/2025
Perry M Petrillo Architects105/22/2025
Cta Architects210/19/2023
Mohammad Ahead, PE105/11/2023
PS Engineers105/08/2023
AR Consulting Engineer109/24/2019
Royal T&E208/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen1103/21/2026
Municipal Building Consultants203/21/2026
JM Zoning503/21/2026
Arcometric Design403/21/2026
Rigid Structural Design403/21/2026
Louis Striar203/21/2026
BMB Building Consulting203/21/2026
PS Engineers403/21/2026
Arsenal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Archstone BuildersGeneral Contractor707/08/2026
CM PlumbingPlumbing307/08/2026
Everest ScaffoldingScaffold307/08/2026
Kings Group NYScaffold303/21/2026
Cara Plumbing GroupPlumbing307/08/2026
Total Structural ConceptsScaffold203/21/2026
Coyle ContractingGeneral Contractor204/09/2026
Stat ElectricElectrical203/21/2026
Republic Scaffold & HoistScaffold204/09/2026
Noor Mechanical Servicesspecialty_contractor110/20/2026
Aranda Plumbing & HeatingPlumbing106/28/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Maspeth ContractingScaffold107/08/2026
Signstar NYCSign hanger107/08/2026
Unitech DesignSign hanger107/08/2026
Z-Car-DSign hanger107/08/2026
Elpo Electrical ContgElectrical103/21/2026
Ronan ElectricalElectrical103/22/2026
Ronan ElectricalElectrical103/21/2026
Juahol ConstructionGeneral Contractor104/09/2026
Maspeth ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449109/16/2026
Consulting and Testing SE61521709/02/2026
Buildtech Engineering6369202/06/2026
Milrose Consultants2003301/27/2026
Metric Consulting and Ins1803210/19/2023
AR Consulting Engineer P4054105/08/2023
Catalpa Special Inspectio2004101/23/2023
Building Lifecycle
All (216)Filed (35)Permit Issued (26)Signed Off (14)Facade (FISP) (15)Violation (40)Inspection (6)Objection (50)Special Inspection (30)
10/20/2026
Objection raised — Scope
10/20/2026
Objection raised — Scope
10/19/2026
Signed off — Alteration
Mechanical modifications taking place on ground floor facade as per plans filed herewith. No change in use, egress or occupancy.
M01181009-I1
10/19/2026
Permit issued — General Construction
M01455237-I1-GC
10/05/2026
Objection resolved — Resolved
10/02/2026
Objection raised — Scope
09/22/2026
Signed off — Alteration
M01154106-I1
09/16/2026
Filed — Alteration
TENANT BUILD OUT FOR A CONVENIENCE STORE AS PER PLANS FILED HEREWITH. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY.
M01455237-I1
09/16/2026
Filed — Alteration
TENANT BUILD OUT FOR A CONVENIENCE STORE AS PER PLANS FILED HEREWITH. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY.
M01455237-S1
09/02/2026
Filed — Alteration
General Construction Modification of cellar and 1st floor per plans filed herewith. No change in egress, use, or occupancy.
M01154090-P3
09/02/2026
Special inspection requirement — Lighting controls
09/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL CREIGHTON
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
09/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
DANIEL CREIGHTON
09/02/2026
Special inspection requirement — Final
Sara Schuster
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
09/02/2026
Special inspection requirement — Mechanical Systems
09/02/2026
Special inspection requirement — Sprayed fire-resistant materials
DANIEL CREIGHTON
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/02/2026
Special inspection requirement — Interior lighting power
09/02/2026
Special inspection requirement — Final
06/22/2026
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - UNIKWAX. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01391826-I1
05/22/2026
Signed off — Alteration
Installation of a temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
M01182808-I1
05/20/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/14/2026
Permit issued — Sign
M01391826-I1-SG
05/12/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - UNIKWAX. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01391826-I1
05/12/2026
Special inspection requirement — Final
ADITYA DESAI
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
DANIEL CREIGHTON
05/07/2026
Special inspection requirement — Structural Steel - Details
DANIEL CREIGHTON
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL CREIGHTON
05/07/2026
Special inspection requirement — Final
DANIEL CREIGHTON
05/07/2026
Special inspection requirement — Post-installed Anchors
DANIEL CREIGHTON
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL CREIGHTON
04/29/2026
Special inspection requirement — Final
Sara Schuster
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
04/29/2026
Special inspection requirement — Sprayed fire-resistant materials
DANIEL CREIGHTON
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
DANIEL CREIGHTON
04/21/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Other
04/16/2026
Permit issued — Structural
M01182698-I1-ST
04/09/2026
Objection resolved — Resolved
04/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2026
Objection resolved — Resolved
03/31/2026
Objection raised — Scope
03/31/2026
Objection raised — Cost
03/30/2026
Signed off — Alteration
Mechanical Systems for interior renovation of existing commercial space at the first floor for new tenant. No change to Use, Egress, or Occupancy.
M01172338-S1
03/27/2026
Permit issued — Construction Fence
M01182808-I1-FN
03/25/2026
Permit issued — Plumbing
M01154122-I1-PL
03/20/2026
Filed — Alteration
Structural work on 1st floor per plans filed herewith. No change in egress, use, or occupancy.
M01154101-P2
03/20/2026
Filed — Alteration
General Construction Modification of cellar and 1st floor per plans filed herewith. No change in egress, use, or occupancy.
M01154090-P2
03/19/2026
Filed — Alteration
M01154106-P1
03/02/2026
Special inspection requirement — Structural Steel - Details
DANIEL CREIGHTON
03/02/2026
Special inspection requirement — Post-installed Anchors
DANIEL CREIGHTON
03/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL CREIGHTON
03/02/2026
Special inspection requirement — Final
DANIEL CREIGHTON
02/27/2026
Permit issued — General Construction
M01154090-I1-GC
02/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL CREIGHTON
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
02/24/2026
Special inspection requirement — Sprayed fire-resistant materials
DANIEL CREIGHTON
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNoor Mechanical Services10/19/2026
DOB NOWSignSigned-offSignstar NYC05/14/2026
DOB NOWStructuralSigned-offArchstone Builders04/16/2026
DOB NOWConstruction FenceSigned-offRepublic Scaffold & Hoist03/27/2026
DOB NOWPlumbingSigned-offPrime Plumbing & Heating of NY03/25/2026
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders02/27/2026
DOB NOWPlumbingPermit IssuedAranda Plumbing & Heating02/11/2026
DOB NOWGeneral ConstructionPermit IssuedJuahol Construction01/22/2026
DOB NOWSignSigned-offZ-Car-D12/03/2025
DOB NOWSignSigned-offUnitech Design10/22/2025
DOB NOWMechanical SystemsSigned-offCoyle Contracting09/08/2025
DOB NOWGeneral ConstructionSigned-offCoyle Contracting09/08/2025
DOB NOWPlumbingSigned-offCM Plumbing09/05/2025
DOB NOWMechanical SystemsSigned-offArchstone Builders07/17/2025
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders07/15/2025
DOB NOWMechanical SystemsSigned-offArchstone Builders06/20/2025
DOB NOWStructuralSigned-offArchstone Builders06/20/2025
DOB NOWConstruction FenceSigned-offRepublic Scaffold & Hoist06/17/2025
DOB NOWPlumbingSigned-offPrime Plumbing & Heating of NY03/17/2025
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders03/14/2025
DOB NOWSidewalk ShedSigned-offKings Group NY05/12/2023
DOB NOWSupported ScaffoldSigned-offMaspeth Contracting05/09/2023
DOB NOWGeneral ConstructionSigned-offMaspeth Contracting04/21/2023
DOB NOWSupported ScaffoldPermit IssuedTotal Structural Concepts09/25/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/03/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding08/30/2019
BISOTISSUEDTotal Structural Concepts01/28/2020
BISOTISSUEDJPS Renovation12/09/2015
BIS—ISSUEDPaul Signs09/28/2015
BISOTISSUEDInterstate Interiors07/24/2015
BISPLISSUEDAccurate Mechanical07/14/2015
BISOTISSUEDInterstate Interiors07/07/2015
BISPLISSUEDVMC Plumbing & Heating03/24/2015
BIS—ISSUEDUnitech Design01/20/2015
BISOTISSUEDUnitech Design01/20/2015
BIS—ISSUEDCity Signs12/11/2014
BISMHISSUEDPlus K Construction12/03/2014
BISEQISSUEDPlus K Construction12/03/2014
BISOTISSUEDPhilip Andrews10/09/2014
BISBLISSUEDEfficient Comb & Cooling Co06/15/2012
+ 30 more permits on file
1 project · most recent 09/16/2026
Ventilation Systems
FiledStatusContractorScope
09/16/2026Permit IssuedNoor Mechanical ServicesVentilation Systems
3 projects · most recent 09/16/2026
Water/Sanitary
FiledStatusContractorScope
09/16/2026——Water/Sanitary
02/06/2026Permit IssuedAranda Plumbing & HeatingWater/Sanitary
12/23/2024Signed-offCara Plumbing GroupWater/Sanitary
8 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedRonan ElectricalGeneral Wiring
07/14/2026Permit IssuedTactical ElectricGeneral Wiring
03/27/2026CompleteRiverdale ElectricGeneral Wiring
03/07/2026CompleteTactical Electric—
02/19/2026CompleteTactical Electric—
02/24/2025CancelledTitanium ElectricalGeneral Wiring
05/12/2023CompleteHigh Quality Electric of—
08/27/2019CompleteBorowide Elect'l Contractors—
2 projects · most recent 03/20/2026
Steel Concrete
FiledStatusContractorScope
03/20/2026Signed-offArchstone BuildersSteel, Concrete
11/24/2025Signed-offArchstone BuildersSteel
2 projects · most recent 09/05/2025
Fence Scaffold
FiledStatusContractorScope
09/05/2025Signed-offRepublic Scaffold & HoistFence
09/24/2019Permit IssuedTotal Structural ConceptsScaffold
1 project · most recent 01/09/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/09/2026Permit IssuedJuahol ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2025Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
09/02/2026Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
09/02/2026Sprayed fire-resistant materialsDANIEL CREIGHTONspecial
09/02/2026Tenant Protection Plan ComplianceDANIEL CREIGHTONspecial
09/02/2026FinalSara Schusterprogress
09/02/2026Fire-Resistance Rated ConstructionDANIEL CREIGHTONprogress
09/02/2026Fire-Resistant Penetrations and Joints—special
09/02/2026Final—progress
09/02/2026Lighting controls—energy_progress
09/02/2026Interior lighting power—energy_progress
09/02/2026Energy Code Compliance Inspections—progress
09/02/2026Energy Code Compliance Inspections—progress
09/02/2026Mechanical Systems—special
05/12/2026FinalADITYA DESAIprogress
05/07/2026Post-installed AnchorsDANIEL CREIGHTONspecial
05/07/2026FinalDANIEL CREIGHTONprogress
05/07/2026Structural Steel - DetailsDANIEL CREIGHTONspecial
05/07/2026Concrete - Cast-In-PlaceDANIEL CREIGHTONspecial
05/07/2026Tenant Protection Plan ComplianceDANIEL CREIGHTONspecial
04/29/2026Sprayed fire-resistant materialsDANIEL CREIGHTONspecial
04/29/2026Fire-Resistance Rated ConstructionDANIEL CREIGHTONprogress
04/29/2026FinalSara Schusterprogress
04/29/2026Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
04/29/2026Tenant Protection Plan ComplianceDANIEL CREIGHTONspecial
03/02/2026Structural Steel - DetailsDANIEL CREIGHTONspecial
03/02/2026Post-installed AnchorsDANIEL CREIGHTONspecial
Latest 25 of 92.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Uni K WaxPersonal services—
Project M01391826 Alteration · LOC Issued · 05/12/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 446 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch31
10/04/2026M01455237-S1Request digital key ↗
10/04/2026M01455237-I1Request digital key ↗
08/31/2026M00869243-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00216844-I1Request digital key ↗
09/05/2026M00222998-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00216184-I1Request digital key ↗
▸Applications & Permits53
▸BISWORK PERMIT APPLICATION31
01/29/2020123488831Open ↗
11/07/2019123488831Open ↗
07/31/2019123780211Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
10/22/2019123038943Open ↗
06/19/2019123780211Open ↗
07/25/2018123488831Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/01/2017122251712Open ↗
▸Seals & Professional Certifications168
▸DOB NOWSpecial Inspector Seal & Signature45
10/14/2026M01154090-P3Open ↗
10/14/2026M01154090-P3Open ↗
10/14/2026M01154090-P3Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
10/14/2026M01154090-P3Open ↗
10/04/2026M01455237-I1Open ↗
10/04/2026M01455237-S1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
10/14/2026M01154090-P3Open ↗
10/14/2026M01154090-P3Open ↗
10/09/2026M01221747-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
10/18/2019123780211Open ↗
10/18/2019123780211Open ↗
10/09/2019123780211Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
10/14/2015122540367Open ↗
07/13/2015122454272Open ↗
01/28/2015122251712Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/05/2017121292127Open ↗
10/14/2015122540367Open ↗
07/14/2015122454272Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/03/2014140272755Open ↗
10/08/2014140250038Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/03/2014140272755Open ↗
10/08/2014140250038Open ↗
▸Trade Schedules & Equipment24
▸BISEQUIPMENT USE PERMITS7
11/13/2014120859730Open ↗
11/13/2014120859730Open ↗
11/13/2014120859730Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
10/05/2015122454272Open ↗
10/02/2015122454272Open ↗
04/29/2015140250038Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/08/2014140250038Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/13/2014120859730Open ↗
11/10/2014120859730Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/13/2015122454272Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
06/19/2019123780211Open ↗
07/25/2018123488831Open ↗
03/29/2017123038943Open ↗
▸DOB NOWTenant Protection Plan3
09/05/2026M00216844-I1Open ↗
09/05/2026M00222998-I1Open ↗
08/13/2026M00216184-I1Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
10/14/2026M01154090-P3Open ↗
10/04/2026M01455237-I1Open ↗
08/25/2026M01154122-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
06/19/2019123780211Open ↗
07/25/2018123488831Open ↗
03/29/2017123038943Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026M01182698-I1Open ↗
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
10/18/2019123780211Open ↗
06/19/2019123780211Open ↗
07/25/2018123488831Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
10/18/2019123780211Open ↗
11/01/2017122251712Open ↗
12/06/2016122614545Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/04/2020123488831Open ↗
12/03/2014140272755Open ↗
10/08/2014140250038Open ↗
▸BISTR8: Energy Code Progress Inspections2
06/18/2014120927596Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/03/2014140272755Open ↗
10/08/2014140250038Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
12/03/2014140272755Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/08/2014140250038Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/04/2020123488831Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/04/2020123488831Open ↗
12/04/2020123488831Open ↗
12/03/2014140272755Open ↗
Showing 3 of 4 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/06/2016122614545Open ↗
▸BISSOIL REPORT1
10/08/2014140250038Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
12/04/2020123488831Open ↗
10/18/2019123780211Open ↗
11/01/2017122251712Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/13/2014120859730Open ↗
06/18/2014120927596Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M01181006-I1Open ↗
08/13/2026M01181009-I1Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT29
12/04/2020123488831Open ↗
10/18/2019123780211Open ↗
06/19/2019123780211Open ↗
Showing 3 of 29 on file for this type
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET15
06/19/2019123780211Open ↗
07/25/2018123488831Open ↗
06/05/2017121292127Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM4
10/22/2019123038943Open ↗
10/18/2019123780211Open ↗
11/01/2017122251712Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet4
12/03/2014140272755Open ↗
10/08/2014140250038Open ↗
Showing 2 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
07/25/2018123488831Open ↗
Showing 1 of 2 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/07/2019123488831Open ↗
10/18/2017122251222Open ↗
Showing 2 of 4 on file for this type
▸BISUnknown1
11/07/2019123488831Open ↗