← Back
BuildNYC
School or academy
Columbia Grammar & Prep School
5 WEST 93RD STREET · BIN 1031644
💬 Discuss this project
1900Year Built
3Stories
W3Building Class
R7-2Zoning
14,067 sfGross Floor Area
1Units
6 Active Violations ▸
School or academy · Owner of record: Columbia Grammar School · 7,550 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofColumbia Grammar and Prep SchoolUnder Construction69p · 9 filings · 20 docs
Floor 2Columbia Grammar and Prep SchoolUnder Construction21p · 2 filings · 20 docs
Floor 1Columbia Grammar and Prep School, CGF / CGPSUnder Construction114p · 9 filings · 20 docs
CellarColumbia Grammar and Prep SchoolUnder Construction103p · 7 filings · 20 docs
Site & exteriorColumbia Grammar and Prep SchoolUnder Construction38p · 7 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Columbia Grammar School8910/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lombardo Professional Engineering408/24/2026
Kohler Ronan408/24/2026
Gilsanz Murray Steficek408/07/2026
Rogers208/07/2026
Urban Integrations1308/06/2026
Ancora Engineering106/24/2026
Marshall Sellers Architecture105/01/2026
PBDW Architects606/12/2025
Alber Camargo309/26/2024
Cosentini Associates409/12/2024
Ibi Group Architects207/06/2024
Ashraf107/08/2023
Bazini Engineering411/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 21471803/21/2026
Hierarch-E603/21/2026
United Safety Consultants803/21/2026
Codegreen303/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1207/08/2026
Richter & Ratner ContractingGeneral Contractor407/08/2026
Brend Restoration ServiceScaffold409/12/2026
Archstone BuildersGeneral Contractor407/08/2026
Volk Industrial ServicesScaffold407/08/2026
Intersystems Installation S&SScaffold303/21/2026
MC Construction ConsultingGeneral Contractor307/08/2026
Guaranteed Home ImprovemeGeneral Contractor107/08/2026
Brend Restoration Servicespecialty_contractor107/08/2026
Bonaline Construction CoGeneral Contractor107/08/2026
AJC SprinklerFire Protection107/08/2026
Cara Plumbing GroupPlumbing107/08/2026
Donato PlumbingPlumbing107/08/2026
KG SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ancora Engineering6818208/07/2026
Obaid Mian849608/07/2026
Outsource Special Inspection2827508/07/2026
Trolydia Testing & Inspec4422208/07/2026
Eugene Architecture8045105/01/2026
EP Inspections and Commis7079305/02/2025
PSI Agency254408/13/2024
Codegreen510302/14/2023
Bazini Engineering1808101/04/2021
Building Lifecycle
All (164)Filed (49)Permit Issued (34)Signed Off (19)Violation (10)Inspection (8)Objection (14)Special Inspection (30)
09/10/2026
Permit issued — Sidewalk Shed
M01415577-I1-SH
08/31/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01414839-I1
08/24/2026
Filed — Alteration CO
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE. EGRESS OR OCCUPANCY.
M01373076-P3
08/24/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01415577-P1
08/14/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Structural
08/11/2026
Special inspection requirement — Masonry
JONAR MADRIAGA
08/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Gregory Moormann
08/11/2026
Special inspection requirement — Post-installed Anchors
Gregory Moormann
08/11/2026
Special inspection requirement — Sprayed fire-resistant materials
Obaid Mian
08/11/2026
Special inspection requirement — Concrete - Cast-In-Place
Obaid Mian
08/11/2026
Special inspection requirement — Structural Steel - Details
Obaid Mian
08/11/2026
Special inspection requirement — Structural Steel - Welding
Gregory Moormann
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gregory Moormann
08/11/2026
Special inspection requirement — Final
Philip Murray
08/11/2026
Special inspection requirement — Subgrade Inspections
EDWARD TOROSSIAN
08/07/2026
Filed — Alteration CO
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE. EGRESS OR OCCUPANCY.
M01373076-P2
08/07/2026
Filed — Alteration CO
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE. EGRESS OR OCCUPANCY.
M01373076-P1
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01414839-P1
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Obaid Mian
08/04/2026
Special inspection requirement — Sprayed fire-resistant materials
Obaid Mian
08/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Obaid Mian
08/04/2026
Special inspection requirement — Fenestration air leakage
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Post-installed Anchors
Gregory Moormann
08/04/2026
Special inspection requirement — Structural Steel - Welding
Gregory Moormann
08/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Gregory Moormann
08/04/2026
Special inspection requirement — Insulation placement and R values
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Air barrier - visual inspection
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Concrete - Cast-In-Place
Obaid Mian
08/04/2026
Special inspection requirement — Subgrade Inspections
EDWARD TOROSSIAN
08/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Masonry
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Sprayed fire-resistant materials
Obaid Mian
08/04/2026
Special inspection requirement — Fenestration areas
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JONAR MADRIAGA
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gregory Moormann
08/04/2026
Special inspection requirement — Structural Steel - Details
Obaid Mian
08/04/2026
Special inspection requirement — Final
Philip Murray
07/14/2026
Violation issued (ECB, closed)
Construction
07/14/2026
Violation issued (ECB, closed)
Site Safety
06/26/2026
Permit issued — Structural
M01420628-I1-ST
06/25/2026
Permit issued — Protection and Mechanical Methods
M01414839-S3-PMM
06/25/2026
Permit issued — Protection and Mechanical Methods
M01414839-S2-PMM
06/25/2026
Permit issued — Construction Fence
M01414839-S1-FN
06/25/2026
Permit issued — Supported Scaffold
M01414839-I1-SF
06/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01414839-I1
06/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01414839-S3
06/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01414839-S2
06/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01414839-S1
06/24/2026
Filed — Alteration
M01420628-I1
06/24/2026
Permit issued — Construction Fence
M01419233-I1-FN
06/24/2026
Permit issued — Structural
M01373076-S4-ST
06/24/2026
Permit issued — Supported Scaffold
M01417483-I1-SF
06/23/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01417483-I1
06/23/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01419233-I1
06/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gregory Moormann
06/16/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01415577-I1
06/16/2026
Permit issued — Sidewalk Shed
M01415577-I1-SH
06/11/2026
Permit issued — General Construction
M01373076-I1-GC
06/09/2026
Permit issued — Mechanical Systems
M01373076-S2-MS
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBrend Restoration Service09/10/2026
DOB NOWStructuralPermit IssuedArchstone Builders06/26/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding06/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding06/25/2026
DOB NOWConstruction FencePermit IssuedSpring Scaffolding06/25/2026
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/25/2026
DOB NOWConstruction FencePermit IssuedBrend Restoration Service06/24/2026
DOB NOWStructuralPermit IssuedArchstone Builders06/24/2026
DOB NOWSupported ScaffoldPermit IssuedBrend Restoration Service06/24/2026
DOB NOWSidewalk ShedPermit IssuedBrend Restoration Service06/16/2026
DOB NOWGeneral ConstructionPermit IssuedArchstone Builders06/11/2026
DOB NOWMechanical SystemsPermit IssuedArchstone Builders06/09/2026
DOB NOWPlumbingPermit IssuedCara Plumbing Group06/08/2026
DOB NOWGeneral ConstructionPermit IssuedBrend Restoration Service05/28/2026
DOB NOWGeneral ConstructionSigned-offBonaline Construction06/18/2025
DOB NOWGeneral ConstructionSigned-offRichter & Ratner Contracting02/28/2025
DOB NOWSprinklersSigned-offH M Sprinkler10/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offVolk Industrial Services09/26/2024
DOB NOWPlumbingSigned-offDonato Plumbing09/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/23/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding08/23/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding08/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offVolk Industrial Services08/22/2024
DOB NOWStructuralSigned-offRichter & Ratner Contracting08/12/2024
DOB NOWGeneral ConstructionSigned-offMC Construction Consulting07/24/2024
DOB NOWGeneral ConstructionSigned-offRichter & Ratner Contracting06/28/2024
DOB NOWSprinklersSigned-offAJC Sprinkler07/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offIntersystems Installation S&S07/10/2023
DOB NOWGeneral ConstructionSigned-offMC Construction Consulting02/15/2023
DOB NOWBoiler EquipmentSigned-offNulite Fuel Oil Co09/30/2021
DOB NOWBoiler EquipmentSigned-offNulite Fuel Oil Co03/30/2021
DOB NOWMechanical SystemsSigned-offGuaranteed Home Improveme01/05/2021
DOB NOWBoiler EquipmentSigned-offNulite Fuel Oil Co11/25/2020
BISOTISSUEDJagiellon Renovation06/28/2018
BISMHISSUEDAir Mechanical Service08/31/2017
BISSPISSUEDAljer Plumbing & Heating02/12/2016
BISMHISSUEDAirmech Mechanical08/17/2015
BISOTISSUEDMC Construction Consulting05/12/2015
BISSPISSUEDAljer Plumbing & Heating09/17/2014
+ 13 more permits on file
2 projects · most recent 08/24/2026
Heating Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Permit IssuedArchstone BuildersAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Aaon RNA-020 301,700 BTU · Rooftop Unit ×2
RQA-005 59,900 BTU · Rooftop Unit ×1
Heating
Aaon RNA-016 328,100 BTU ×1
RNA-020 437,400 BTU ×1
RQA-005 48,600 BTU ×1
Ventilation
Aaon RNA-016 1,700 CFM ×1
RNA-020 5,500 CFM · Makeup Air ×1
RQA-005 250 CFM · Rooftop Unit ×1
02/13/2023——Heating Systems
Heating
__Junk__ T46D102433B50DOF 500 CFM · Unit Heater ×1
1 project · most recent 08/24/2026
Sprinkler System
FiledStatusContractorScope
08/24/2026——Sprinkler System
1 project · most recent 08/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/24/2026Permit IssuedCara Plumbing GroupGas, Storm, Water/Sanitary
3 projects · most recent 06/18/2026
FiledStatusContractorScope
06/18/2026Permit IssuedCrosswire Electrical—
06/15/2026Permit IssuedTop Shelf Electric—
08/19/2024CompleteM.C. Electrical NY—
1 project · most recent 08/24/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/24/2026Permit IssuedArchstone BuildersSteel, Concrete, Masonry
4 projects · most recent 08/24/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
08/24/2026Permit IssuedBrend Restoration ServiceSidewalk Shed
08/06/2026Permit IssuedSpring ScaffoldingFence, Scaffold
06/23/2026Permit IssuedBrend Restoration ServiceFence
06/23/2026Permit IssuedBrend Restoration ServiceScaffold
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/11/2026Subgrade InspectionsEDWARD TOROSSIANspecial
08/11/2026FinalPhilip Murrayprogress
08/11/2026Concrete - Cast-In-PlaceObaid Mianspecial
08/11/2026Structural Steel - WeldingGregory Moormannspecial
08/11/2026Sprayed fire-resistant materialsObaid Mianspecial
08/11/2026Structural Steel - DetailsObaid Mianspecial
08/11/2026Structural Steel - High Strength BoltingGregory Moormannspecial
08/11/2026MasonryJONAR MADRIAGAspecial
08/11/2026Post-installed AnchorsGregory Moormannspecial
08/11/2026Structural Stability – Alterations of existing buildingsGregory Moormannspecial
08/04/2026Structural Steel - High Strength BoltingGregory Moormannspecial
08/04/2026Structural Stability – Alterations of existing buildingsGregory Moormannspecial
08/04/2026Sprayed fire-resistant materialsObaid Mianspecial
08/04/2026Post-installed AnchorsGregory Moormannspecial
08/04/2026MasonryJONAR MADRIAGAspecial
08/04/2026Concrete - Cast-In-PlaceObaid Mianspecial
08/04/2026Energy Code Compliance InspectionsObaid Mianprogress
08/04/2026Fire-Resistance Rated ConstructionObaid Mianprogress
08/04/2026Fenestration air leakageJONAR MADRIAGAenergy_progress
08/04/2026Air barrier - visual inspectionJONAR MADRIAGAenergy_progress
08/04/2026Fenestration areasJONAR MADRIAGAenergy_progress
08/04/2026Sprayed fire-resistant materialsObaid Mianspecial
08/04/2026Wall Panels, Curtain Walls, and VeneersJONAR MADRIAGAspecial
08/04/2026FinalPhilip Murrayprogress
08/04/2026Subgrade InspectionsEDWARD TOROSSIANspecial
Latest 25 of 82.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Columbia Grammar and Prep SchoolEducationCellar, Floors 1, 2, Roof
Project M01395098 Alteration · Permit Entire · 05/01/2026
Project M01373076 Alteration CO · Permit Entire · 03/27/2026
Project M01183950 Alteration · LOC Issued · 02/25/2025
Project M01091807 Alteration · LOC Issued · 09/26/2024
Project M01062916 Alteration · LOC Issued · 06/11/2024
Project M01027512 Alteration · LOC Issued · 05/08/2024
Project M00433014 Alteration · LOC Issued · 01/04/2021
Project M00430881 Alteration · LOC Issued · 11/25/2020
CGF / CGPSEducationFloor 1
Project M00818501 Alteration · LOC Issued · 02/14/2023
Project M00818353 Alteration · LOC Issued · 02/13/2023
Project M00818541 Alteration · Approved · 02/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 495 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch44
08/31/2026M00818541-I1Request digital key ↗
08/31/2026M00818353-I1Request digital key ↗
08/31/2026M00818501-I1Request digital key ↗
Showing 3 of 44 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/04/2026M00430881-P1Request digital key ↗
09/04/2026M00430881-P2Request digital key ↗
09/04/2026M00430881-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00433014-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION27
05/02/2018123455484Open ↗
09/11/2017123122897Open ↗
08/25/2017123122897Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION20
06/29/2018123455484Open ↗
09/01/2017123122897Open ↗
09/08/2015122235447Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/22/2015120368547Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026M01373076-P1Open ↗
08/16/2026M01373076-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026M01373076-P1Open ↗
08/16/2026M01373076-I1Open ↗
▸Seals & Professional Certifications162
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/04/2026M00430881-P1Open ↗
09/04/2026M00430881-I1Open ↗
09/04/2026M00430881-P2Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/23/2026M00430881-I1Open ↗
09/02/2026M00818353-I1Open ↗
09/02/2026M00818353-I1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
08/09/2018123455484Open ↗
08/09/2018123455484Open ↗
09/13/2017123122897Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/02/2026M00818353-I1Open ↗
09/01/2026M01027512-I1Open ↗
09/01/2026M01373076-S4Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
08/25/2017123122897Open ↗
01/09/2015122235447Open ↗
01/09/2015122235447Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
07/24/2013121700917Open ↗
07/19/2013121709767Open ↗
07/18/2013121709794Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/25/2017123122897Open ↗
01/09/2015122235447Open ↗
01/09/2015122235447Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE5
02/03/2015121709794Open ↗
01/30/2015121709794Open ↗
02/18/2014121709794Open ↗
Showing 3 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION5
01/30/2015121709794Open ↗
01/30/2015121709794Open ↗
01/30/2015121709794Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
08/29/2014121709794Open ↗
10/31/2013121709794Open ↗
07/18/2013121709794Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
09/13/2017123122897Open ↗
04/16/2014121414807Open ↗
04/08/2014121414807Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/13/2017123122897Open ↗
04/08/2014121414807Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
01/30/2015121709794Open ↗
07/15/2014121759347Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
01/30/2015121709794Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/22/2014121414807Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/16/2026M01373076-P1Open ↗
08/16/2026M01373076-I1Open ↗
▸BISTenant Protection Plan and Notes1
08/25/2017123122897Open ↗
▸BISSTREET TREE CHECKLIST1
07/12/2013121704450Open ↗
▸Environmental & Asbestos40
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/10/2026M01373076-P3Open ↗
09/04/2026M00430881-P1Open ↗
09/04/2026M00430881-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/09/2015122235447Open ↗
01/22/2014121414807Open ↗
07/24/2013121700917Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/24/2026M01183950-I1Open ↗
08/16/2026M01373076-S1Open ↗
08/16/2026M01373076-S2Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/26/2018123455484Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
08/09/2018123455484Open ↗
05/02/2018123455484Open ↗
08/25/2017123122897Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
08/09/2018123455484Open ↗
10/27/2017123122897Open ↗
10/25/2017123122897Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections4
01/30/2014121414807Open ↗
12/30/2013121704450Open ↗
07/26/2013121700917Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
09/04/2026M00430881-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/04/2026M00430881-I1Open ↗
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
09/04/2026M00430881-P1Open ↗
09/04/2026M00430881-I1Open ↗
09/04/2026M00430881-P2Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
08/09/2018123455484Open ↗
10/27/2017123122897Open ↗
10/25/2017123122897Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
01/22/2014121414807Open ↗
07/24/2013121700917Open ↗
07/19/2013121709767Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT19
08/09/2018123455484Open ↗
05/02/2018123455484Open ↗
10/27/2017123122897Open ↗
Showing 3 of 19 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET15
05/02/2018123455484Open ↗
08/25/2017123122897Open ↗
01/09/2015122235447Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION7
09/11/2017123122897Open ↗
08/27/2015122235447Open ↗
08/26/2015122235447Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
08/09/2018123455484Open ↗
10/27/2017123122897Open ↗
10/25/2017123122897Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet1
01/22/2014121414807Open ↗
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
02/03/2015121709794Open ↗
02/03/2015121709794Open ↗
02/03/2015121709794Open ↗
Showing 3 of 11 on file for this type
▸BISRESTRICTION: DEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSite Survey: Initial2
08/16/2026M01373076-P1Open ↗
08/16/2026M01373076-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026M01373076-I1Open ↗
08/16/2026M01373076-P1Open ↗
▸DOB NOWPlot Diagram2
08/16/2026M01373076-I1Open ↗
08/16/2026M01373076-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026M01373076-P1Open ↗
08/16/2026M01373076-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type