← Back
Over six families without stores
50 CLIFFORD PLACE
BRONX · Mount Hope · BIN 2008164
💬 Discuss this project
1920Year Built
2Stories
C1Building Class
R8Zoning
7,827 sfGross Floor Area
19Units
Rent Stabilized14 Open Violations ▸
Over six families without stores · Owner of record: CLIFFORD PLACE REALTY GROUP LLC · 2,200 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof37p · 2 filings · 20 docs
Penthouse37p · 1 filing · 20 docs
Floor 437p · 2 filings · 20 docs
Floor 334p · 1 filing · 20 docs
Floor 238p · 2 filings · 20 docs
Floor 135p · 1 filing · 20 docs
Cellar38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT3807/08/2026
CLIFFORD PLACE REALTY GROUP LLC203/22/2026
BUILDERS GROUP USA203/22/2026
EPISCOPAL SOCIAL SERVICES303/22/2026
USA INC BUILDERS GROUP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2022$995K—EPISCOPAL SOCIAL SERVICES OF NEW YORK, INC → CLIFFORD PLACE REALTY GROUP LLC$127/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC911/13/2024
M.INT'L ENGINEERING PLLC705/13/2024
KNF SERVICES CROP102/27/2024
MOHAMMAD AHEAD, PE212/05/2023
FOCAL POINT ARCHITECTS & ASS.307/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1403/21/2026
EMPIRE EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor1607/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor203/21/2026
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161411/13/2024
M. INT'L ENGINEERING PLLC3129205/10/2023
Building Lifecycle
All (204)Filed (22)Permit Issued (17)Signed Off (10)Violation (34)Inspection (11)Objection (80)Special Inspection (30)
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
A
04/10/2026
Violation issued (HPD, closed)
B
04/09/2026
Violation issued (HPD, closed)
B
02/24/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITHMAIN APPLICATION # X00739669-I1
X00739669-I1
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
01/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/07/2026
Violation issued (HPD, closed)
C
01/07/2026
Violation issued (HPD, closed)
C
10/06/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
A
06/25/2025
Violation issued (HPD, closed)
B
05/31/2025
Violation issued (HPD, open)
B
05/31/2025
Violation issued (HPD, open)
B
05/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
02/04/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITHMAIN APPLICATION # X00739669-I1
X00739669-S2
11/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/27/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/27/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/27/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/27/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/27/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
11/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/27/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/27/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/27/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/27/2024
Special inspection requirement — Metering
FAHAD FATEH
11/27/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/27/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
11/27/2024
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
11/27/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/27/2024
Special inspection requirement — Preliminary
FAHAD FATEH
11/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUNCTION WITHMAIN APPLICATION # X00739669-I1
X00739669-P9
11/13/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
11/13/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/13/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/13/2024
Special inspection requirement — Preliminary
FAHAD FATEH
11/13/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/28/2024
DOB NOWStructuralSigned-offBUILDERS GROUP USA06/10/2024
DOB NOWSupported ScaffoldSigned-offBUILDERS GROUP USA05/13/2024
DOB NOWFoundationSigned-offBUILDERS GROUP USA01/18/2024
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA01/03/2024
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL11/14/2023
DOB NOWFoundationSigned-offBUILDERS GROUP USA08/16/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA08/15/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA08/09/2023
DOB NOWFoundationSigned-offBUILDERS GROUP USA08/04/2023
DOB NOWStructuralSigned-offBUILDERS GROUP USA07/24/2023
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA07/21/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY06/30/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/30/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA06/14/2023
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA05/31/2023
DOB NOWFoundationSigned-offSTELLAR INDUSTRIES INC05/28/2022
BIS—ISSUEDCONSTRUCTION & MAINTENANCE SERV.04/02/1998
BISPLISSUEDGRAFES ENDE, INC.D/B/A ADCO PLG.04/02/1998
1 project · most recent 11/13/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/13/2024Signed-offBUILDERS GROUP USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin ftx09nmvjue 19,000 BTU · Fan Coil Indoor ×34
rx09nmvju 10,000 BTU · Ahu ×34
CTXS07LVJU 14,000 BTU · Fan Coil Indoor ×4
3MXS24RMVJU 36,000 BTU · Ahu ×2
RX12bxvju 13,500 BTU · Ahu ×2
ftx12nmvju 24,400 BTU · Fan Coil Indoor ×2
ftxs09lvju 18,000 BTU · Fan Coil Indoor ×2
1 project · most recent 11/13/2024
Sprinkler System
FiledStatusContractorScope
11/13/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 11/13/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/13/2024Signed-offA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
3 projects · most recent 02/26/2025
General Wiring
FiledStatusContractorScope
02/26/2025CompleteD & W ELECTRICAL CONT CORGeneral Wiring
08/08/2024CompleteRIVIERA ELECT BROS CORPGeneral Wiring
11/14/2023CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 11/13/2024
Fence
FiledStatusContractorScope
11/13/2024Signed-offA M B MECHANICAL INCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/02/2024Pass-Final PL - UndergroundPassView ↗
10/26/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
11/27/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
11/27/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/27/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/27/2024PreliminaryFAHAD FATEHprogress
11/27/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/27/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/27/2024Exterior lighting powerFAHAD FATEHenergy_progress
11/27/2024MeteringFAHAD FATEHenergy_progress
11/27/2024Electrical motors and elevatorsFAHAD FATEHenergy_progress
11/27/2024Fenestration air leakageFAHAD FATEHenergy_progress
11/27/2024Fenestration areasFAHAD FATEHenergy_progress
11/27/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/27/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/27/2024Maintenance informationFAHAD FATEHenergy_progress
11/27/2024Interior lighting powerFAHAD FATEHenergy_progress
11/27/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
11/27/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/27/2024Lighting controlsFAHAD FATEHenergy_progress
11/13/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
11/13/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
11/13/2024Fenestration air leakageFAHAD FATEHenergy_progress
11/13/2024MeteringFAHAD FATEHenergy_progress
11/13/2024Electrical motors and elevatorsFAHAD FATEHenergy_progress
11/13/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/13/2024Exterior lighting powerFAHAD FATEHenergy_progress
Latest 25 of 138.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/24/2026X00734484-I1Request digital key ↗
08/23/2026X00734458-P2Request digital key ↗
08/23/2026X00734458-P4Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
07/21/2022240331887Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/21/2022240331887Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026X00739669-I1Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026X00739669-P5Open ↗
08/13/2026X00739669-P9Open ↗
08/13/2026X00739669-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026X00739669-P5Open ↗
08/13/2026X00739669-P8Open ↗
08/13/2026X00739669-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00739669-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWSpecial Inspector Seal & Signature22
09/02/2026X00739669-P9Open ↗
09/01/2026X00739669-P8Open ↗
08/31/2026X00734458-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/23/2026X00734458-P2Open ↗
08/23/2026X00734458-P4Open ↗
08/23/2026X00734458-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026X00739669-P9Open ↗
09/02/2026X00739669-P9Open ↗
09/01/2026X00739669-P8Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/21/2022240331887Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/21/2022240331887Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00739669-P8Open ↗
08/13/2026X00739669-I1Open ↗
08/13/2026X00739669-P5Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/23/2024240331887Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/08/2023240331887Open ↗
▸BISSTREET TREE CHECKLIST1
05/08/2023240331887Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00739669-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00739669-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00739669-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/23/2026X00734458-P2Open ↗
08/23/2026X00734458-P4Open ↗
08/23/2026X00734458-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/21/2022240331887Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/29/2024240331887Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/21/2022240331887Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00739669-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCONSTRUCTION (OT) SIGNOFF1
07/23/2024240331887Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/08/2023240331887Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
07/21/2022240331887Open ↗
▸BISADDITIONAL INFORMATION1
05/09/2023240331887Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/21/2022240331887Open ↗
▸Other Documents21
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00739669-P1Open ↗
08/13/2026X00739669-P5Open ↗
08/13/2026X00739669-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/20/2026X00739669-P9Open ↗
08/20/2026X00739669-P8Open ↗
08/20/2026X00739669-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026X00739669-P5Open ↗
08/13/2026X00739669-P9Open ↗
08/13/2026X00739669-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026X00734458-P4Open ↗
08/13/2026X00734458-P1Open ↗
08/13/2026X00734458-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
07/21/2022240331887Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00739669-I1Open ↗