| Owner | Filings | Most Recent |
|---|---|---|
| TISHMAN SPEYER | 448 | 09/24/2026 |
| NEW YORK LADDER & SCAFFOLD | 4 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | 5 | 03/22/2026 |
| RCPI HOLDCO LCC ATTN: TRACEY FRAZZETTA | 3 | 03/22/2026 |
| RCPI HOLDCO LCC | 3 | 03/22/2026 |
| RCPI HOLDCO LLC | 1 | 03/22/2026 |
| RCPI LANDMARK PROPERTIES, LLC | 373 | 03/22/2026 |
| TISHMANSPEYER PROPERTI | 2 | 03/22/2026 |
| RCPI TRUST | 94 | 03/22/2026 |
| J T MAGEN COMPANY | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| URBAN INTEGRATIONS | 6 | 09/18/2026 |
| ANDREW FORMICHELLA | 5 | 05/20/2026 |
| ROBERT DERECTOR ASSOCIATES | 85 | 04/13/2026 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 33 | 12/04/2025 |
| CLARK REDER ENGINEERING | 1 | 04/21/2025 |
| PATTI & ANTHES CONSULTING ENGINEERS | 5 | 12/18/2024 |
| GENSLER | 16 | 05/28/2024 |
| AKF ENGINEERS, LLP | 5 | 01/26/2024 |
| HOPPER ENGINEERING ASSOCIATES | 1 | 11/21/2023 |
| TED MOUDIS ASSOCIATES | 11 | 11/13/2023 |
| BRAND ACCESS SOLUTIONS | 2 | 06/23/2023 |
| LAWRENCE DIGENNARO, ARCHITECT | 2 | 04/26/2023 |
| CHRISTOPHER GLEICH | 4 | 04/24/2023 |
| STANTEC | 3 | 03/02/2023 |
| ACTIVE DESIGN GROUP ENGINEERING | 5 | 02/27/2023 |
| MONTROY ARCHITECTURE PLLC | 4 | 02/27/2023 |
| ENGINEERING DRIVEN DESIGN PC | 4 | 01/25/2023 |
| CTS GROUP ARCHITECTS | 2 | 01/25/2023 |
| AMA CONSULTING ENGINEERS, PC | 18 | 01/09/2023 |
| ADVANTAGE ARCHITECTURE PLLC | 2 | 01/04/2023 |
| THETA CONSULTING LLC | 2 | 11/18/2022 |
| GACE DPC | 5 | 11/04/2022 |
| TOHFAZ UDDIN PE PC | 1 | 10/03/2022 |
| JACOB FEINBERG KATZ & MICHAELI CONS | 3 | 08/25/2022 |
| KTA ENGINEERING | 3 | 08/18/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 79 | 03/21/2026 |
| GILMAN CONSULTANT | 38 | 03/21/2026 |
| RIZZO GROUP | 98 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 24 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 15 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 10 | 03/21/2026 |
| GILLMAN CONSULTING | 44 | 03/21/2026 |
| WALTER T. GORMAN, PE, PC | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRM CONSTRUCTION MGMT LLC | General Contractor | 60 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 52 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 30 | 07/08/2026 |
| FINALY GENL CONTR CORP | General Contractor | 18 | 07/08/2026 |
| A PLUS PLUMBING CORP | Plumbing | 16 | 07/08/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 13 | 09/24/2026 |
| A + SPRINKLER CORP | Fire Protection | 13 | 07/08/2026 |
| COYLE CONTRACTING CORP | General Contractor | 12 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 11 | 07/08/2026 |
| GILBANE BUILDING COMPANY | General Contractor | 10 | 07/08/2026 |
| MC GOWAN BUILDERS INC | General Contractor | 8 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 8 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 6 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 5 | 07/08/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 4 | 07/08/2026 |
| UNIVERSAL FIRE SPR LLC | Fire Protection | 4 | 07/08/2026 |
| RINNOVO CONSTRUCTION, LLC | General Contractor | 4 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| VERSATILE SERVICES LLC | General Contractor | 3 | 07/08/2026 |
| ROBERT HINDMAN, INC | General Contractor | 3 | 07/08/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 3 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 3 | 07/08/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 3 | 07/08/2026 |
| SUFFOLK CONSTRUCTION COMP | General Contractor | 2 | 07/08/2026 |
| KNS BUILDING REST. INC | General Contractor | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CODEGREEN | 510 | 81 | 04/13/2026 |
| CROSSCHECK INSPECTION SER | 544 | 17 | 11/19/2024 |
| MILROSE CONSULTANTS LLC | 2003 | 31 | 05/28/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 3 | 02/27/2023 |
| WALTER T. GORMAN, P.E., P | 268 | 7 | 01/25/2023 |
| SPECIAL INSPECTION SERVIC | 1200 | 3 | 07/25/2022 |
| FUTURE TECH CONSULTANTS O | 589 | 2 | 03/03/2022 |
| DNA CONTROLLED INSPECTION | 554 | 13 | 01/20/2022 |
| 20/20 INSPECTIONS INC | 1471 | 8 | 08/11/2021 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 1 | 08/04/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 12/15/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 12/08/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 12/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 12/08/2025 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 11/20/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 10/30/2025 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 06/06/2025 |
| DOB NOW | General Construction | Signed-off | EVENTPERMITS | 04/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | FINALY GENL CONTR | 12/19/2024 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 11/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 11/26/2024 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 11/26/2024 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 05/21/2024 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 11/27/2023 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 11/14/2023 |
| DOB NOW | General Construction | Signed-off | VERSATILE SERVICES LLC | 09/13/2023 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 08/01/2023 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 06/26/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 06/23/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 06/06/2023 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 05/25/2023 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 05/10/2023 |
| DOB NOW | Structural | Signed-off | JT MAGEN & COMPANY INC | 04/28/2023 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 04/18/2023 |
| DOB NOW | Sprinklers | Permit Issued | FLOW-RIGHT FIRE SUPP CORP | 03/29/2023 |
| DOB NOW | Mechanical Systems | Signed-off | FINALY GENL CONTR | 03/21/2023 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 03/21/2023 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 03/20/2023 |
| DOB NOW | General Construction | Signed-off | FINALY GENL CONTR | 02/27/2023 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 02/21/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | VERSATILE SERVICES LLC | 02/07/2023 |
| DOB NOW | Plumbing | Signed-off | SIRINA FIRE PROT CORP | 01/31/2023 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 01/31/2023 |
| DOB NOW | Plumbing | Signed-off | GEOFFREY A. LAGAS & ASSOC | 01/26/2023 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 01/23/2023 |
| DOB NOW | Mechanical Systems | Signed-off | RINNOVO CONSTRUCTION, LLC | 01/12/2023 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 32 heads |
| 01/09/2023 | Permit Issued | FLOW-RIGHT FIRE SUPP CORP | 59 heads |
| 11/04/2022 | — | — | 3 heads |
| 08/11/2021 | Permit Issued | ASHLAR MECHANICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2026 | Complete | CROSSWIRE ELECTRICAL INC | — |
| 12/05/2025 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 11/18/2024 | Complete | ON POINT ELECTRIC INC | General Wiring |
| 07/23/2024 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 07/12/2023 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring, Lighting |
| 07/11/2023 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 06/01/2023 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring |
| 04/12/2023 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 02/16/2023 | Complete | DENMAR ELECTRIC CORP | General Wiring |
| 01/05/2023 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 12/02/2022 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 10/31/2022 | Complete | P.E. STONE INC | General Wiring |
| 09/28/2022 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 09/27/2022 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring, Lighting |
| 09/21/2022 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/08/2020 | Permit Issued | MC GOWAN BUILDERS INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2021 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/18/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/25/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 02/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/20/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 12/29/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/16/2025 | No Access-Final General Construction Non-Directive 14 | No Access | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/29/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/29/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/10/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/11/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/04/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/29/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/31/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/31/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/27/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/05/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/04/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/04/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/27/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/17/2026 | Final | DANNY TRUJILLO | progress |
| 04/14/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 04/14/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/10/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/10/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 11/14/2025 | Final | DANNY TRUJILLO | progress |
| 10/16/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 10/10/2025 | Final | Scott Spector | progress |
| 04/07/2025 | Final | JEFFREY REDER | progress |
| 12/11/2024 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 11/22/2024 | Mechanical Systems | HATIM ELSAID | special |
| 11/22/2024 | Final | HATIM ELSAID | progress |
| 11/15/2024 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 10/01/2024 | Sprinkler Systems | EUGENE BIFULCO | special |
| 05/29/2024 | Final | Karen Solomon | progress |
| 05/29/2024 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 05/29/2024 | Sprayed fire-resistant materials | Christopher Drutjons | special |
| 05/29/2024 | Energy Code Compliance Inspections | Christopher Drutjons | progress |
| 01/26/2024 | Mechanical Systems | HATIM ELSAID | special |
| 01/26/2024 | Final | HATIM ELSAID | progress |
| 01/26/2024 | Post-installed Anchors | HATIM ELSAID | special |
| 01/26/2024 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/11/2024 | Mastic and Intumescent Fire-resistant Coatings | HATIM ELSAID | special |
| 01/11/2024 | Final | Scott Spector | progress |
| 01/11/2024 | Fire-Resistance Rated Construction | HATIM ELSAID | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Applied Underwriters | Office | Floors 13, 14 | Project M01300975 Project M01016609 Project M00752119 Project M00752124 |
| GE Vernova Investor's Toyland | Other | — | Project M01319188 |
| Katten Muchin Rosenman | Office | Cellar, Floors 5–10 | Project M08020208 Project M08020221 Project M00581574 Project M00581613 Project M00547290 Project M00530258 Project M00515458 Project M00515545 |
| Fifth Third Bank | Office | Floor 11 | Project M08040604 |
| Applied Underwriter/Applied Underwriters | Office | Floors 13, 14 | Project M00752114 |
| Calamos | Office | Floor 15 | Project M00590491 Project M00504164 |
| Rockefeller Center Station | Office | — | Project M00563824 |
| Citrincooperman | Office | Floors 2–4 | Project M00485061 |