| Owner | Filings | Most Recent |
|---|---|---|
| Tishman Speyer Properties | 448 | 09/24/2026 |
| Rcpi Landmark Properries | 394 | 04/09/2026 |
| Rcpi Trust | 93 | 03/21/2026 |
| Rockefeller Center Properties | 10 | 03/21/2026 |
| Osman Realty | 4 | 03/21/2026 |
| Bank of America | 4 | 03/21/2026 |
| Rcpi Holdco LCC Attn: Tracey Frazzetta | 1 | 03/22/2026 |
| Rcpi Holding Co | 1 | 03/22/2026 |
| Rcpi | 1 | 03/21/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Milrose Consultants | 79 | 03/21/2026 |
| Gilman Consultant | 38 | 03/21/2026 |
| Codegreen | 98 | 03/21/2026 |
| KM Associates of New York | 24 | 03/21/2026 |
| Municipal Building Consultants | 15 | 03/21/2026 |
| Spring Scaffolding | 2 | 03/21/2026 |
| A1 Expediting Service | 10 | 03/21/2026 |
| Gillman Consulting | 44 | 03/21/2026 |
| Walter T. Gorman, PE | 8 | 03/21/2026 |
| EA Design Group | 2 | 03/21/2026 |
| Z.S. Engineering | 1 | 03/21/2026 |
| K & M Associates | 24 | 03/21/2026 |
| Walter T Gorman Pepc | 8 | 03/21/2026 |
| Z&T Engineering | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRM Construction Management | General Contractor | 60 | 07/08/2026 |
| JT Magen & Company | General Contractor | 52 | 07/08/2026 |
| James E Fitzgerald | General Contractor | 30 | 07/08/2026 |
| Finaly General Contracting | General Contractor | 18 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 16 | 07/08/2026 |
| Winick Productions | General Contractor | 13 | 09/24/2026 |
| A + Sprinkler | Fire Protection | 13 | 07/08/2026 |
| Coyle Contracting | General Contractor | 12 | 07/08/2026 |
| A&A Plumbing | Plumbing | 11 | 07/08/2026 |
| Gilbane Building Company | General Contractor | 10 | 07/08/2026 |
| Safway Atlantic | Scaffold | 8 | 07/08/2026 |
| MC Gowan Builders | General Contractor | 8 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 6 | 07/08/2026 |
| PSI Partners | Fire Protection | 5 | 07/08/2026 |
| Rinnovo Construction | General Contractor | 4 | 07/08/2026 |
| Allstate Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Universal Fire Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 3 | 03/21/2026 |
| M&T Plumbing and Heating Co | Plumbing | 3 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Versatile Services | General Contractor | 3 | 07/08/2026 |
| Schimenti Construction Co | General Contractor | 3 | 07/08/2026 |
| Robert Hindman | General Contractor | 3 | 07/08/2026 |
| Suffolk Construction Company | General Contractor | 2 | 07/08/2026 |
| G.F. Sheridan | Fire Protection | 2 | 03/21/2026 |
| First Cnstrction Zone | General Contractor | 2 | 07/08/2026 |
| KNS Building Restoration | General Contractor | 2 | 03/21/2026 |
| Ashland Plumbing | Plumbing | 2 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 2 | 07/08/2026 |
| Geoffrey A. Lagas & Associates | Plumbing | 2 | 07/08/2026 |
| Metrotech Mechanical | Plumbing | 2 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 2 | 07/08/2026 |
| JRD Electric | Electrical | 1 | 03/21/2026 |
| Jordan Daniels Electrical Con | Electrical | 1 | 03/21/2026 |
| Amok | Fire Protection | 1 | 07/08/2026 |
| Patriot Electric | Electrical | 1 | 03/22/2026 |
| Empire State Electric Maintenance | Electrical | 1 | 03/22/2026 |
| Decora Electric Co | Electrical | 1 | 03/21/2026 |
| Mazzancello Mark | Electrical | 1 | 03/21/2026 |
| Flow-Right Fire Supp | Fire Protection | 1 | 07/08/2026 |
| RRP Plumbing | Plumbing | 1 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| LCS Plumbing & Consulting | Plumbing | 1 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Lion Electric | Electrical | 1 | 03/22/2026 |
| JRD Electric | Electrical | 1 | 03/22/2026 |
| Fred Geller Electrical | Electrical | 1 | 03/21/2026 |
| New York Ladder & Scaffold | Scaffold | 1 | 07/08/2026 |
| Nbcuniversal Media | General Contractor | 1 | 07/08/2026 |
| Eventpermits | General Contractor | 1 | 04/09/2026 |
| ACES2SPADES | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Codegreen | 510 | 81 | 04/13/2026 |
| Crosscheck Inspection Services | 544 | 17 | 11/19/2024 |
| Milrose Consultants | 2003 | 31 | 05/28/2024 |
| Skyline Engineering | 267 | 3 | 02/27/2023 |
| Walter T. Gorman, P.E., P | 268 | 7 | 01/25/2023 |
| Special Inspection Services | 1200 | 3 | 07/25/2022 |
| Future Tech Consultants O | 589 | 2 | 03/03/2022 |
| DNA Controlled Inspection | 554 | 13 | 01/20/2022 |
| 20/20 Inspections | 1471 | 8 | 08/11/2021 |
| Atlantic Engineeringlabor | 1381 | 1 | 08/04/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Winick Productions | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 12/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 12/08/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 12/08/2025 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 12/08/2025 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 11/20/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 10/30/2025 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 06/06/2025 |
| DOB NOW | General Construction | Signed-off | Eventpermits | 04/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Finaly General Contracting | 12/19/2024 |
| DOB NOW | General Construction | Signed-off | James E Fitzgerald | 11/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | James E Fitzgerald | 11/26/2024 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 11/26/2024 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 05/21/2024 |
| DOB NOW | General Construction | Permit Issued | Winick Productions | 11/27/2023 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 11/14/2023 |
| DOB NOW | General Construction | Signed-off | Versatile Services | 09/13/2023 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 08/01/2023 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 06/26/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Safway Atlantic | 06/23/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Safway Atlantic | 06/06/2023 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 05/25/2023 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 05/10/2023 |
| DOB NOW | Structural | Signed-off | JT Magen & Company | 04/28/2023 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 04/18/2023 |
| DOB NOW | Sprinklers | Permit Issued | Flow-Right Fire Supp | 03/29/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Finaly General Contracting | 03/21/2023 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 03/21/2023 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 03/20/2023 |
| DOB NOW | General Construction | Signed-off | Finaly General Contracting | 02/27/2023 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 02/21/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | Versatile Services | 02/07/2023 |
| DOB NOW | Sprinklers | Signed-off | Sirina Fire Protection | 01/31/2023 |
| DOB NOW | Plumbing | Signed-off | M&T Plumbing and Heating Co | 01/31/2023 |
| DOB NOW | Plumbing | Signed-off | Geoffrey A. Lagas & Associates | 01/26/2023 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 01/23/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Rinnovo Construction | 01/12/2023 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2026 | Signed-off | Abco-Peerless Sprinkler | 32 heads |
| 01/09/2023 | Permit Issued | Flow-Right Fire Supp | 59 heads |
| 11/04/2022 | — | — | 3 heads |
| 08/11/2021 | Permit Issued | Ashlar Mechanical | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2026 | Complete | Crosswire Electrical | — |
| 12/05/2025 | Complete | JRD Electric | General Wiring |
| 11/18/2024 | Complete | On Point Electric | General Wiring |
| 07/23/2024 | Complete | Patriot Electric | General Wiring |
| 07/12/2023 | Complete | Empire State Electric Maintenance | General Wiring, Lighting |
| 07/11/2023 | Complete | Live Wire Electric 1 | General Wiring |
| 06/01/2023 | Complete | Empire State Electric Maintenance | General Wiring |
| 04/12/2023 | Complete | MRD Electrical Services | General Wiring |
| 02/16/2023 | Complete | Denmar Electric | General Wiring |
| 01/05/2023 | Complete | JRD Electric | General Wiring |
| 12/02/2022 | Complete | Patriot Electric | General Wiring |
| 10/31/2022 | Complete | P.E. Stone | General Wiring |
| 09/28/2022 | Complete | Power-Tech Installation Electric | General Wiring |
| 09/27/2022 | Complete | Empire State Electric Maintenance | General Wiring, Lighting |
| 09/21/2022 | Complete | Patriot Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/08/2020 | Permit Issued | MC Gowan Builders | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2021 | Permit Issued | Safway Atlantic | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/18/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 02/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/06/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/06/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/29/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/10/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/31/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/31/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/27/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/05/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/04/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/04/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/26/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/21/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/28/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/02/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/22/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/21/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/15/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/12/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/12/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/12/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/17/2026 | Final | DANNY TRUJILLO | progress |
| 04/14/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 04/14/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/10/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 03/10/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 11/14/2025 | Final | DANNY TRUJILLO | progress |
| 10/16/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 10/10/2025 | Final | Scott Spector | progress |
| 04/07/2025 | Final | JEFFREY REDER | progress |
| 12/11/2024 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 11/22/2024 | Mechanical Systems | HATIM ELSAID | special |
| 11/22/2024 | Final | HATIM ELSAID | progress |
| 11/15/2024 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 10/01/2024 | Sprinkler Systems | EUGENE BIFULCO | special |
| 05/29/2024 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 05/29/2024 | Final | Karen Solomon | progress |
| 05/29/2024 | Energy Code Compliance Inspections | Christopher Drutjons | progress |
| 05/29/2024 | Sprayed fire-resistant materials | Christopher Drutjons | special |
| 01/26/2024 | Final | HATIM ELSAID | progress |
| 01/26/2024 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/26/2024 | Mechanical Systems | HATIM ELSAID | special |
| 01/26/2024 | Post-installed Anchors | HATIM ELSAID | special |
| 01/11/2024 | Final | Scott Spector | progress |
| 01/11/2024 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/11/2024 | Fire-Resistance Rated Construction | HATIM ELSAID | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Applied Underwriters | Office | Floors 13, 14 | Project M01300975 Project M01300981 Project M01300988 Project M01016609 Project M00752114 Project M00752119 Project M00752124 Project M00752104 Project M00726033 Project M00726913 |
| GE Vernova Investor's Toyland | Events & gatherings | — | Project M01319188 |
| Universal Epic Universal Launch | Other | — | Project M01206539 |
| Lego | Retail | — | Project M00963470 |
| United States Postal Service | Government / Civic | Floor 1 | Project M00807213 Project M00807261 Project M00807254 |
| Katten Muchin Rosenman | Office | Sub-cellar, Cellar, Basement, Floors 1, 5–10 | Project M08020208 Project M08020217 Project M08020221 Project M00581574 Project M00581613 Project M00547290 Project M00530258 Project M00515415 Project M00515458 Project M00515473 Project M00515545 Project M00515559 |
| Fifth Third Bank | Office | Floor 11 | Project M08044409 Project M08044419 Project M08040604 Project M08042259 |
| MissionCritical / Consulting | Office | Floor 11 | Project M08008852 Project M08008864 Project M08008867 Project M08008871 |
| Optimum | Retail | Floor 2 | Project M00791273 Project M00791275 Project M00791277 |
| Tishman Speyer | Office | Cellar | Project M00779998 Project M00780011 Project M00780035 Project M00779881 Project M00516136 Project M00516141 Project M00516144 Project M00516148 |
| TM Technology Partners | Office | Floor 2 | Project M00660208 Project M00660113 Project M00660172 Project M00659895 |
| Calamos | Office | Sub-cellar, Cellar, Basement, Floors 1–5, 12, 15, 16 | Project M00590491 Project M00504164 Project M00493985 Project M00494699 Project M00494831 Project M00496841 Project M00480014 Project M01120383 |
| Rockefeller Center Station | Office | Sub-basement, Floor 1 | Project M00559183 Project M00559232 Project M00563824 |
| Anthropologie | Retail | Floors 1, 9 | Project M00485949 Project M00561000 |
| ## Investments | Office | Floors 14–16 | Project M00496676 Project M00496726 Project M00496760 |
| Citrincooperman | Office | Floors 2–4 | Project M00485065 Project M00485066 Project M00485067 Project M00485069 Project M00485456 Project M00485061 |
| USPS | Government / Civic | Sub-cellar, Cellar, Sub-basement, Floor 1, Mezzanine | Project M00327207 Project M00342584 Project M00282159 Project M00282171 Project M00282186 |