| Owner | Filings | Most Recent |
|---|---|---|
| GFP REAL ESTATE | 669 | 09/25/2026 |
| 7 HANOVER FEE OWNER | 128 | 07/08/2026 |
| 25 WATER GP HOLDINGS | 11 | 07/08/2026 |
| PLATINUM SERVICES NY | 12 | 07/08/2026 |
| AVARGA CONSTRUCTION | 4 | 04/09/2026 |
| SEVEN HANOVER ASSOC. | 12 | 03/22/2026 |
| AWR GROUP | 3 | 03/22/2026 |
| MB REAL ESTATE | 154 | 03/22/2026 |
| OWNER OF 84 PEARL STREET | 4 | 03/22/2026 |
| TO OWNER OF 84 PEARL ST. | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| WALTER T. GORMAN, P.E., P.C. | 3 | 08/21/2026 |
| IMEG CONSULTING CORP. | 5 | 07/14/2026 |
| LILKER ASSOCIATES CONSULTING ENGINE | 78 | 06/05/2026 |
| TULLER/MCNEALUS/FELD | 13 | 05/15/2026 |
| RAHMAN CONSULTING | 1 | 05/06/2026 |
| LEON SKVIRSKY PE | 13 | 08/11/2025 |
| THOMAS A SCIBILIA | 1 | 07/18/2025 |
| DEAN MENDEZ RA | 1 | 07/15/2025 |
| SYNC ARCHITECTURE P.C | 2 | 06/11/2025 |
| DESIGN42 ARCHITECTURE, LLC | 1 | 05/08/2025 |
| GEORGE J. XERAKIAS, PE | 1 | 10/23/2024 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 10/22/2024 |
| GILSANZ MURRAY STEFICEK LLP | 16 | 09/23/2024 |
| DXU LLC | 3 | 09/13/2024 |
| CONKLIN COSTANTIN ARCHITECTS LLP | 1 | 08/20/2024 |
| DEWBERRY ENGINEERS INC | 5 | 02/26/2024 |
| TPG ARCHITECTURE, LLP | 3 | 01/10/2024 |
| ABBY SUCKLE ARCHITECT PC | 2 | 08/16/2023 |
| ANDREW FORMICHELLA | 1 | 05/04/2023 |
| PERKINS EASTMAN | 1 | 03/28/2023 |
| SETTY | 15 | 12/08/2022 |
| CASE ENGINEERING, INC. | 4 | 05/23/2022 |
| CUSTODIO CONSULTING, LLC | 2 | 04/29/2022 |
| KZ ENGINEERING, P.C | 6 | 12/20/2021 |
| HC ARCHITECT, PC | 2 | 12/20/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| WALTER T GORMAN PE | 230 | 03/21/2026 |
| CAESAR BUSTAMANTE AIA | 26 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| DESIGN42 ARCHITECTURE | 10 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 9 | 03/21/2026 |
| BUILDING BROTHERS | 26 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 4 | 03/21/2026 |
| KUSHNER STUDIOS | 6 | 03/21/2026 |
| I L CONSULTING | 2 | 03/21/2026 |
| JP EXPEDITE | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| 7 HANOVER FEE OWNER CO LL | General Contractor | 110 | 07/08/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 57 | 07/08/2026 |
| JC ELITE CONSTRUCTION SER | General Contractor | 23 | 07/08/2026 |
| A & M WARSHAW PLBG & HTG | Plumbing | 22 | 07/08/2026 |
| ARCHSTONE BUILDERS LLC | General Contractor | 17 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 14 | 07/08/2026 |
| ADVANCED PLBG LLC | Plumbing | 13 | 07/08/2026 |
| CENTERSTUDIO CONSTRUCTION | General Contractor | 10 | 07/08/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 9 | 07/08/2026 |
| ACTIVE SIGNS | Scaffold | 8 | 07/08/2026 |
| MK MANAGMENT AND MAINTENANCE | General Contractor | 7 | 09/25/2026 |
| TOWER FIRE PROTECTION INC | Fire Protection | 6 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 5 | 07/08/2026 |
| RALLY RESTORATION CORP | General Contractor | 5 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 5 | 07/08/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 4 | 07/19/2026 |
| JEM CONTRACTING CORP | General Contractor | 4 | 03/21/2026 |
| NEW YORK STANDARD MECH CO | Fire Protection | 4 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 4 | 07/08/2026 |
| DEMARTINO CONSTR. CO. INC | General Contractor | 4 | 03/21/2026 |
| P & D MECHANICAL CORP | Fire Protection | 3 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 3 | 03/21/2026 |
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 3 | 07/08/2026 |
| A. BONADUCE, INC | General Contractor | 3 | 07/08/2026 |
| MARLIN MECHANICAL INC | General Contractor | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| WALTER T. GORMAN, P.E., P | 268 | 20 | 07/14/2026 |
| SYNERGY ENGINEERING | 784 | 6 | 08/22/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 1 | 10/23/2024 |
| LILKER ASSOCIATES CONSULT | 816 | 2 | 08/16/2023 |
| AK ENGINEERING PC | 678 | 5 | 08/09/2023 |
| ALAN MARGOLIN & ASSOC | 423 | 4 | 03/01/2023 |
| SPECIAL TESTING & CONSULT | 1688 | 104 | 12/08/2022 |
| KENDALL ENGINEERING PC | 4154 | 6 | 09/20/2021 |
| HOWARD L ZIMMERMAN ARCHIT | 1712 | 1 | 03/08/2021 |
| M/P/S ENGINEERING PLLC | 1588 | 1 | 02/18/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | MK MANAGMENT AND MAINTENANCE | 09/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | ADVANCED PLUMBING MECH | 07/17/2026 |
| DOB NOW | Plumbing | Permit Issued | ADVANCED PLBG, MECH & SPR | 07/17/2026 |
| DOB NOW | Mechanical Systems | Signed-off | DLS MECHANICAL CORP | 06/24/2026 |
| DOB NOW | General Construction | Permit Issued | MK MANAGMENT AND MAINTENANCE | 05/18/2026 |
| DOB NOW | Sign | Signed-off | N.Y. SIGN ART INC | 05/07/2026 |
| DOB NOW | General Construction | Signed-off | MK MANAGMENT AND MAINTENA | 03/16/2026 |
| DOB NOW | Mechanical Systems | Signed-off | MK MANAGMENT AND MAINTENA | 02/09/2026 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLBG, MECH & SPR | 01/29/2026 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLUMBING MECH | 01/29/2026 |
| DOB NOW | General Construction | Signed-off | MK MANAGMENT AND MAINTENA | 01/14/2026 |
| DOB NOW | Sign | Signed-off | A.M.A HOLDINGS INC | 08/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CENTERSTUDIO CONSTRUCTION | 08/27/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 08/01/2025 |
| DOB NOW | Structural | Signed-off | CENTERSTUDIO CONSTRUCTION | 07/25/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | AVARGA CONSTRUCTION CORP | 07/24/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | AVARGA CONSTRUCTION CORP | 07/15/2025 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 07/09/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CENTERSTUDIO CONSTRUCTION | 07/01/2025 |
| DOB NOW | General Construction | Permit Issued | NY TENT, LLC | 06/16/2025 |
| DOB NOW | General Construction | Signed-off | CENTERSTUDIO CONSTRUCTION | 06/11/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 05/12/2025 |
| DOB NOW | Sprinklers | Signed-off | WILLIAM C. GERAKARIS P&H | 02/27/2025 |
| DOB NOW | General Construction | Signed-off | CENTERSTUDIO CONSTRUCTION | 02/27/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CENTERSTUDIO CONSTRUCTION | 02/26/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | HONEYBEE SERVICES INC | 12/09/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | HONEYBEE SERVICES INC | 10/28/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | CEPRINE CONSTRUCTION INC | 10/24/2024 |
| DOB NOW | General Construction | Signed-off | NY TENT, LLC | 09/26/2024 |
| DOB NOW | General Construction | Signed-off | SYNTHESIS INC | 09/24/2024 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 08/26/2024 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 08/26/2024 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 08/26/2024 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 08/26/2024 |
| DOB NOW | Structural | Signed-off | TRI-STAR CONSTRUCTION COR | 07/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | MK MANAGMENT AND MAINTENA | 10/30/2023 |
| DOB NOW | General Construction | Signed-off | BENCHMARK BUILDERS LLC | 08/17/2023 |
| DOB NOW | Mechanical Systems | Signed-off | MARLIN MECHANICAL INC | 08/10/2023 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLBG, MECH & SPR | 06/05/2023 |
| DOB NOW | General Construction | Signed-off | MK MANAGMENT AND MAINTENA | 05/02/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/05/2026 | Signed-off | DLS MECHANICAL CORP | Air Conditioning Systems | Cooling Daikin REYQ144XAYDA 138,000 BTU · Vrf Outdoor ×5 REYQ120XAYDA 114,000 BTU · Vrf Outdoor ×4 REQ144XAYDA 138,000 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | ADVANCED PLBG, MECH & SPR | 59 heads |
| 05/22/2026 | Signed-off | ADVANCED PLBG, MECH & SPR | 271 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | ADVANCED PLUMBING MECH | Water/Sanitary |
| 05/22/2026 | Signed-off | ADVANCED PLUMBING MECH | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 04/23/2026 | Permit Issued | STAR ELECTRIC CORP | General Wiring |
| 04/23/2026 | Permit Issued | STAR ELECTRIC CORP | General Wiring |
| 12/19/2025 | Permit Issued | EXECUTIVE ELECTL SER INC | General Wiring |
| 10/20/2025 | Permit Issued | ECO ELECTRICAL SERVCS LLC | General Wiring |
| 07/16/2025 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 02/19/2025 | Complete | ECO ELECTRICAL SERVCS LLC | General Wiring |
| 10/17/2024 | Complete | HIGH QUALITY ELECTRIC OF | — |
| 09/17/2024 | Complete | KET ELECTRIC LLC | General Wiring |
| 03/08/2024 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/08/2024 | Permit Issued | JAM ELECTRICAL CORP | — |
| 08/24/2023 | Complete | ROBERT B SAMUELS, INC | General Wiring, Lighting |
| 08/20/2023 | Complete | ERNE VALLEY ELECTRIC INC | General Wiring |
| 07/24/2023 | Permit Issued | EXECUTIVE ELECTL SER INC | General Wiring |
| 07/10/2023 | Complete | JAM ELECTRICAL CORP | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/25/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Water Test | Certified | View ↗ |
| 07/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/20/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/05/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/10/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/30/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/02/2024 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 08/22/2023 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 08/17/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/26/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/26/2023 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/06/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/06/2023 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/06/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 07/03/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/16/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/16/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/13/2026 | Energy Code Compliance Inspections | Walter Gorman | progress |
| 07/13/2026 | HVAC-R and service water heating system controls | Walter Gorman | energy_progress |
| 07/13/2026 | HVAC-R and service water heating equipment | Walter Gorman | energy_progress |
| 07/13/2026 | Maintenance information | Walter Gorman | energy_progress |
| 07/13/2026 | HVAC-R and service water piping design and insulation | Walter Gorman | energy_progress |
| 06/15/2026 | Mechanical Systems | Walter Gorman | special |
| 06/15/2026 | Final | Walter Gorman | progress |
| 06/15/2026 | HVAC-R and service water piping design and insulation | Walter Gorman | energy_progress |
| 06/15/2026 | Sprinkler Systems | Walter Gorman | special |
| 06/15/2026 | Interior lighting power | Walter Gorman | energy_progress |
| 06/15/2026 | Post-installed Anchors | Walter Gorman | special |
| 06/15/2026 | HVAC-R and service water heating system controls | Walter Gorman | energy_progress |
| 06/15/2026 | Post-installed Anchors | Walter Gorman | special |
| 06/15/2026 | Lighting controls | Walter Gorman | energy_progress |
| 06/15/2026 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 06/15/2026 | Maintenance information | Walter Gorman | energy_progress |
| 05/22/2026 | Post-installed Anchors | Walter Gorman | special |
| 05/22/2026 | Sprinkler Systems | Walter Gorman | special |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 05/20/2026 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 05/20/2026 | Sprinkler Systems | Walter Gorman | special |
| 05/20/2026 | Post-installed Anchors | Walter Gorman | special |
| 04/13/2026 | Final | Anthony Nicholas | progress |
| 04/13/2026 | Fire-Resistance Rated Construction | Walter Gorman | progress |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| The Hungry Pearl | Restaurant / Food Service | Floor 1 | Project M01072751 Project M01072804 Project M01072810 Project M01072823 |
| New York City Health & Hospitals | Office | Floor 17 | Project M00694369 |
| Open Squash | Fitness / Recreation | Floor 14 | Project M08002435 Project M08010848 |
| Urbanspace | Restaurant / Food Service | Floor 1 | Project M00555873 |
| U.S. Securities and Exchange Commission (SEC) | Office | Floors 20, 26 | Project M00474317 |
| Fred Alger Management | Office | Floors 27–29, Mezzanine | Project M00478929 |
| The Delanski Group | Office | Floors 4, 6, 7 | Project M00311799 |
| NYLAG | Office | Floors 19, 20 | Project M00284090 |
| Advanced Electronic Solutions | Office | Floors 19, 20 | Project M00283137 |