Condo, residential tower (mixed-use, multi-family elevator) [derived]
500 WEST END AVENUE
MANHATTAN · Upper West Side (Central) · BIN 1033103
💬 Discuss this project
1915Year Built
13Stories
RMBuilding Class
R10AZoning
128,324 sfGross Floor Area
83Units
LL97 CoveredRent Stabilized10 Open Violations ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 500 WEST END CONDOMINIUM CO TUDOR REALTY SERVICES CORP · 13,587 sf lot · 9.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 9Under Construction2p · 1 filing · 10 docs
Floor 84p · 2 filings · 11 docs
Floor 76p · 2 filings · 8 docs
Floor 62p · 1 filing · 15 docs
Floor 5Under Construction6p · 1 filing · 8 docs
Floor 4
Floor 3Under Construction7p · 1 filing · 12 docs
Floor 2
Floor 132p · 5 filings · 20 docs
Site & exteriorUnder Construction30p · 6 filings · 20 docs
Filed — no permit issued17p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
500 WEST END AVE2403/21/2026
WSC WEST END AVENUE OWNERS2203/21/2026
TUDOR REALTY SERVICES1907/08/2026
500 WEST END LLC C O P M G1903/21/2026
DOMINION PROPERTY GROUP1603/21/2026
500 WEST END CONDO1103/21/2026
WEST VENTURES603/21/2026
500 WEST END AVE OWNERS403/21/2026
PROPERTY MARKETS GROUP, INC.403/21/2026
P.M.G. MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC INSTALLATION CORP.General Contractor3007/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor1407/08/2026
AM BUILDING RESTORATION*General Contractor807/08/2026
WESTSHORE INTERIORS INCGeneral Contractor707/08/2026
ANTAR GROUP LLCGeneral Contractor303/21/2026
UP HOUSE DESIGN INGeneral Contractor303/21/2026
BENJAMIN DREBINElectrical203/21/2026
ENSMAN ALEXANDERElectrical203/21/2026
ZORAN VUJICICElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
BIKO RENOVATIONS CORPGeneral Contractor107/08/2026
CENTAURI DEVELOPMENT INCGeneral Contractor107/08/2026
SKOWRONSKI JEFFElectrical103/21/2026
ROBERT COVELLOElectrical103/21/2026
HARRY'S DESIGN INCGeneral Contractor108/16/2026
MZZ RENOVATION CORPGeneral Contractor107/08/2026
PO DESIGN CREATION CORPGeneral Contractor107/08/2026
JUMPER ELECTRIC CORPElectrical103/22/2026
JEFF SKOWRONSKIElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
A PLUS PLUMBING CORPPlumbing109/23/2026
DRILON PLBG & HTG INCPlumbing106/07/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing106/27/2026
P.S.I. MECHANICALPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCH CHADWICK, ARCHITECT2253108/10/2026
IDA GALEA, ARCHITECT838107/17/2026
CHERICO KING ARCHITECT PC5674305/08/2026
ALAN MARGOLIN & ASSOC423101/11/2024
GEE2000 ARCHITECT P.C.691210/11/2023
JONATHAN B. HELD AIA ARCH1288609/29/2023
MOSCHELLA ROBERTS ARCHITE8151110/25/2021
Building Lifecycle
All (239)Filed (41)Permit Issued (50)Signed Off (11)Facade (FISP) (15)Violation (60)Inspection (22)Objection (10)Special Inspection (30)
09/24/2026
Permit issued — General Construction
M01079584-I1-GC
09/01/2026
Permit issued — Plumbing
M01401115-S1-PL
08/19/2026
Filed — Alteration
INTERIOR RENOVATION IN 5B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01079584-S2
08/14/2026
Permit issued — General Construction
M01401115-I1-GC
08/10/2026
Filed — Alteration
INTERIOR RENOVATION IN 5B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01079584-I1
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
07/30/2026
Special inspection requirement — Lighting in dwelling units
Tomasz Gil
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Tomasz Gil
07/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/17/2026
Filed — Alteration
PLUMBING WORK FOR RENOVATED KITCHENETTE AND BATHROOM AS PER PLANS FILED HEREWITH. GENERAL CONSTRUCTION WORK TO BE FILED UNDER SEPARATE DOB NOW APPLICATION. NO CHANGE TO BULK, EGRESS, USE OR OCCUPANCY.
M01401115-S1
07/17/2026
Filed — Alteration
PLUMBING WORK FOR RENOVATED KITCHENETTE AND BATHROOM AS PER PLANS FILED HEREWITH. GENERAL CONSTRUCTION WORK TO BE FILED UNDER SEPARATE DOB NOW APPLICATION. NO CHANGE TO BULK, EGRESS, USE OR OCCUPANCY.
M01401115-I1
07/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/01/2026
Permit issued — Sidewalk Shed
M00741449-I1-SH
06/24/2026
Permit issued — Plumbing
M01395009-S1-PL
06/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Permit issued — General Construction
M01395009-I1-GC
06/05/2026
Signed off — Alteration
This PL subsequent application is filed to supersede an old BIS PL permit (102788583) for bathroom & kitchen renovation. All PL work has been completed in 2001 and no work to be done under this application. No change in use, egress or occupancy
M01386664-S1
06/04/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Scope
05/28/2026
Filed — Alteration
RENOVATE EXISTING APARTMENT 9B MASTER & GUEST BATHROOMS: REPLACE 2 LAV'S., 2 TOILETS, 1 TUB. REMOVE 1 TUB AND NEW 1 SHOWER IN SAME LOCATION AS PER PLANS FILED.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01395009-I1
05/28/2026
Filed — Alteration
RENOVATE EXISTING APARTMENT 9B MASTER & GUEST BATHROOMS: REPLACE 2 LAV'S., 2 TOILETS, 1 TUB. REMOVE 1 TUB AND NEW 1 SHOWER IN SAME LOCATION AS PER PLANS FILED.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01395009-S1
05/26/2026
Signed off — Alteration
This PL subsequent application is filed to supersede an old BIS PL permit (102788583) for bathroom & kitchen renovation. All PL work has been completed in 2001 and no work to be done under this application. No change in use, egress or occupancy
M01386664-I1
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2026
Permit issued — Plumbing
M01386664-S1-PL
05/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ida Galea
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ida Galea
05/12/2026
Special inspection requirement — Lighting in dwelling units
Ida Galea
05/12/2026
Special inspection requirement — Final
Ida Galea
05/08/2026
Filed — Alteration
This PL subsequent application is filed to supersede an old BIS PL permit (102788583) for bathroom & kitchen renovation. All PL work has been completed in 2001 and no work to be done under this application. No change in use, egress or occupancy
M01386664-P1
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE MAREK
05/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
LAWRENCE MAREK
05/04/2026
Permit issued — General Construction
M01386664-I1-GC
04/30/2026
Permit issued — Protection and Mechanical Methods
M08001504-I1-PM
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
CARL FINER
04/29/2026
Special inspection requirement — Lighting in dwelling units
CARL FINER
04/29/2026
Special inspection requirement — Final
CARL FINER
04/28/2026
Filed — Alteration
This PL subsequent application is filed to supersede an old BIS PL permit (102788583) for bathroom & kitchen renovation. All PL work has been completed in 2001 and no work to be done under this application. No change in use, egress or occupancy
M01386664-S1
04/28/2026
Filed — Alteration
This PL subsequent application is filed to supersede an old BIS PL permit (102788583) for bathroom & kitchen renovation. All PL work has been completed in 2001 and no work to be done under this application. No change in use, egress or occupancy
M01386664-I1
04/20/2026
Permit issued — Sidewalk Shed
M00741449-I1-SH
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE MAREK
04/13/2026
Special inspection requirement — Final
LAWRENCE MAREK
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
LAWRENCE MAREK
04/06/2026
Permit issued — Supported Scaffold
M00534321-I1-SF
01/09/2026
Permit issued — Protection and Mechanical Methods
M00981302-I1-PMM
11/19/2025
Cycle 9 facade report submitted
11/19/2025
Cycle 9 facade report signed — UNSAFE
11/14/2025
Cycle 9 facade inspection completed
10/10/2025
Permit issued — Supported Scaffold
M00749060-I1-SF
10/03/2025
Violation issued (ECB, open)
Unknown
06/27/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2025
Permit issued — Protection and Mechanical Methods
M08001504-I1-PM
04/21/2025
Permit issued — Sidewalk Shed
M00741449-I1-SH
04/04/2025
Permit issued — Supported Scaffold
M00534321-I1-SF
01/07/2025
Permit issued — Protection and Mechanical Methods
M00981302-I1-PMM
09/25/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 239 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIVENKO INC09/24/2026
DOB NOWPlumbingPermit IssuedA PLUS PLUMBING CORP09/01/2026
DOB NOWGeneral ConstructionPermit IssuedHARRY'S DESIGN INC08/14/2026
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL07/01/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC06/24/2026
DOB NOWGeneral ConstructionPermit IssuedMZZ RENOVATION CORP06/18/2026
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC05/14/2026
DOB NOWGeneral ConstructionSigned-offCENTAURI DEVELOPMENT INC05/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAM BUILDING RESTORATION*04/30/2026
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL04/20/2026
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC INSTALLATION CORP04/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDYNAMIX SCAFFOLD GROUP LL01/09/2026
DOB NOWSupported ScaffoldPermit IssuedDYNAMIX SCAFFOLD GROUP LL10/10/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedAM BUILDING RESTORATION*04/29/2025
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL04/21/2025
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC INSTALLATION CORP04/04/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedDYNAMIX SCAFFOLD GROUP LL01/07/2025
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL05/02/2024
DOB NOWSupported ScaffoldPermit IssuedDYNAMIX SCAFFOLD GROUP LL05/02/2024
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC INSTALLATION CORP04/04/2024
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP02/01/2024
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP01/30/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedDYNAMIX SCAFFOLD GROUP LL12/27/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedAM BUILDING RESTORATION*09/01/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/24/2023
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL05/04/2023
DOB NOWSupported ScaffoldPermit IssuedDYNAMIX SCAFFOLD GROUP LL05/03/2023
DOB NOWGeneral ConstructionSigned-offPO DESIGN CREATION CORP04/28/2023
DOB NOWSidewalk ShedPermit IssuedDYNAMIC INSTALLATION CORP04/13/2023
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC INSTALLATION CORP04/11/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedAM BUILDING RESTORATION*09/22/2022
DOB NOWGeneral ConstructionSigned-offWESTSHORE INTERIORS INC08/22/2022
DOB NOWSupported ScaffoldPermit IssuedDYNAMIX SCAFFOLD GROUP LL06/02/2022
DOB NOWGeneral ConstructionSigned-offWESTSHORE INTERIORS INC05/25/2022
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL05/20/2022
DOB NOWSidewalk ShedPermit IssuedDYNAMIC INSTALLATION CORP04/25/2022
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC INSTALLATION CORP04/25/2022
DOB NOWGeneral ConstructionSigned-offANTAR GROUP LLC03/01/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP02/03/2022
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL02/01/2022
+ 60 more permits on file
5 projects · most recent 08/19/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/19/2026——Gas, Water/Sanitary
07/17/2026Permit IssuedA PLUS PLUMBING CORPGas, Water/Sanitary
05/28/2026Permit IssuedORBIT PLBG & HTG INCWater/Sanitary
01/22/2024——Gas, Water/Sanitary
10/11/2023——Water/Sanitary
13 projects · most recent 09/30/2026
General Wiring
FiledStatusContractorScope
09/30/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
08/02/2026Permit IssuedAGIR ELEC'L LTD. D/B/AGeneral Wiring
06/22/2026CompleteNY CITY ELECTRIC INC—
03/28/2026Permit IssuedJAM ELECTRICAL CORP—
09/03/2025Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
10/16/2024CompleteDONALD MCGEACHY, INC.General Wiring
03/13/2024CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
11/06/2023CompleteASCUATECH ELECTRICAL CORP—
02/09/2022CompleteLINTECH ELECTRIC, INCGeneral Wiring
12/03/2021Permit IssuedASSOCIATED ELEC CONT OF NGeneral Wiring
02/22/2021CompleteLENS ELECTRIC, INCGeneral Wiring
07/31/2020Permit IssuedJUMPER ELECTRIC CORPGeneral Wiring
06/04/2018Permit IssuedV. VASS ELECTRIC CORP—
4 projects · most recent 05/31/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/31/2024Permit IssuedDYNAMIX SCAFFOLD GROUP LLScaffold
12/29/2023Permit IssuedDYNAMIX SCAFFOLD GROUP LLSidewalk Shed
10/07/2021Permit IssuedDYNAMIC INSTALLATION CORPScaffold
06/05/2018Permit IssuedDYNAMIC INSTALLATION CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
07/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/12/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
07/30/2026Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
07/30/2026Lighting in dwelling unitsTomasz Gilenergy_progress
07/30/2026Energy Code Compliance InspectionsTomasz Gilprogress
05/12/2026Fire-Resistance Rated ConstructionIda Galeaprogress
05/12/2026Fire-Resistant Penetrations and JointsIda Galeaspecial
05/12/2026Lighting in dwelling unitsIda Galeaenergy_progress
05/12/2026FinalIda Galeaprogress
05/08/2026Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
05/08/2026Tenant Protection Plan ComplianceLAWRENCE MAREKspecial
04/29/2026Energy Code Compliance InspectionsCARL FINERprogress
04/29/2026Lighting in dwelling unitsCARL FINERenergy_progress
04/29/2026FinalCARL FINERprogress
04/13/2026Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
04/13/2026FinalLAWRENCE MAREKprogress
04/13/2026Tenant Protection Plan ComplianceLAWRENCE MAREKspecial
07/11/2024FinalTomasz Gilprogress
01/14/2024Finalmatthew viedermanprogress
10/11/2023Tenant Protection Plan CompliancePETER GEEspecial
10/03/2023Fire-Resistant Penetrations and JointsJONATHAN HELDspecial
10/03/2023Post-installed AnchorsJONATHAN HELDspecial
10/03/2023Energy Code Compliance InspectionsJONATHAN HELDprogress
10/03/2023FinalJONATHAN HELDprogress
10/03/2023Fire-Resistance Rated ConstructionJONATHAN HELDprogress
10/03/2023Lighting in dwelling unitsJONATHAN HELDenergy_progress
10/03/2023Interior lighting powerJONATHAN HELDenergy_progress
Latest 25 of 55.
▾Documents — 781 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch39
09/06/2026M00050247-I1Request digital key ↗
09/03/2026M00534321-I1Request digital key ↗
09/03/2026M00534321-P1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00451717-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00451398-I1Request digital key ↗
▸Applications & Permits169
▸BISPLAN / WORK APPROVAL APPLICATION71
02/15/2024120833394Open ↗
02/14/2024120833394Open ↗
01/26/2023103098906Open ↗
Showing 3 of 71 on file for this type
▸BISWORK PERMIT APPLICATION71
03/02/2023103098906Open ↗
07/11/2022123407376Open ↗
06/05/2020123674951Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWLPC Approval/Permit27
09/04/2026M00451398-I1Open ↗
09/03/2026M00637904-I1Open ↗
09/03/2026M00637904-P1Open ↗
Showing 3 of 27 on file for this type
▸Seals & Professional Certifications182
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION72
05/14/2019123595010Open ↗
02/28/2019123674951Open ↗
12/21/2018123407376Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/04/2026M00451398-I1Open ↗
09/03/2026M00524510-I1Open ↗
09/03/2026M00637904-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/16/2026M01386664-I1Open ↗
09/02/2026M01395009-I1Open ↗
09/02/2026M01395009-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/21/2018123407376Open ↗
12/20/2017120284209Open ↗
05/12/2015122128731Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/16/2026M01386664-I1Open ↗
08/29/2026M08045046-P1Open ↗
08/29/2026M01386664-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
12/21/2018123407376Open ↗
12/20/2017120284209Open ↗
05/12/2015122128731Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment61
▸BISSELF-CERT PLUMBING NOTICE32
09/10/2015122288906Open ↗
Showing 1 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING13
06/09/2022123595010Open ↗
Showing 1 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
06/27/2019123407376Open ↗
06/19/2019123407376Open ↗
05/14/2019123595010Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
07/10/2019123674951Open ↗
04/03/2019123674951Open ↗
12/21/2018123407376Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/11/2018122807169Open ↗
▸Environmental & Asbestos61
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/04/2026M00451398-I1Open ↗
09/03/2026M00637904-I1Open ↗
09/03/2026M00637904-P1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
05/14/2019123595010Open ↗
02/28/2019123674951Open ↗
12/21/2018123407376Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00524510-I1Open ↗
08/28/2026M00963545-S1Open ↗
08/28/2026M00963545-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/25/2019122807169Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
05/14/2019123595010Open ↗
02/28/2019123674951Open ↗
12/21/2018123407376Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
04/03/2024120833394Open ↗
05/03/2016122288906Open ↗
12/09/2015122128731Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/13/2024120833394Open ↗
04/13/2024120833394Open ↗
04/08/2024120833394Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/02/2026M00617908-I1Open ↗
08/13/2026M00524481-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/13/2024120833394Open ↗
04/13/2024120833394Open ↗
04/08/2024120833394Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
04/15/2024120833394Open ↗
03/17/2023103098906Open ↗
01/22/2018102429258Open ↗
Showing 3 of 27 on file for this type
▸BISLANDMARKS APPROVAL24
07/10/2019123674951Open ↗
05/14/2019123595010Open ↗
12/21/2018123407376Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/28/2019123674951Open ↗
11/06/2017104290358Open ↗
12/09/2015122128731Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
07/05/2017102429258Open ↗
▸DOB NOWLandmark Approval1
08/16/2026M01079584-S2Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT55
04/08/2024120833394Open ↗
04/03/2024120833394Open ↗
03/16/2023103098906Open ↗
Showing 3 of 55 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
08/07/2019123595010Open ↗
Showing 1 of 2 on file for this type
▸BISWELDERS AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms62
▸BISEFILING COVER SHEET28
05/14/2019123595010Open ↗
02/28/2019123674951Open ↗
12/21/2018123407376Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION18
01/31/2023103098906Open ↗
09/22/2022122807169Open ↗
09/01/2022122807169Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM12
03/02/2023103098906Open ↗
07/11/2022123407376Open ↗
08/21/2019123111934Open ↗
Showing 3 of 12 on file for this type
▸BISeFiling Job Application Cover Sheet4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
03/26/2024120833394Open ↗
03/15/2024120833394Open ↗
03/15/2024120833394Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00990266-I1Open ↗
08/13/2026M00990268-I1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type