Roger Smith Hotel
501 LEXINGTON AVENUE · East Midtown-Turtle Bay · BIN 1036208
💬 Discuss this project
1927Year Built
17Stories
H3Building Class
C5-3Zoning
92,501 sfGross Floor Area
4Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SWARMP
Limited service hotel, often national chain · Owner of record: 501 LEXINGTON DEVELOPMENT COMPANY, LLC · 6,050 sf lot · 15.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof9p · 3 filings
Floor 3Under Construction2p · 2 filings
Floor 2Under Construction22p · 4 filings
Floor 1Under Construction22p · 5 filings
CellarUnder Construction21p · 6 filings
Site & exterior3 filings · 18 docs
Filed — no permit issued1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIMESHARE ACQUISITIONS AT LEXINGTON8507/08/2026
UNIT NO 31107/08/2026
501 LEXINGTON DEVELOPMENT COMPANY, LLC103/22/2026
Charter Communications103/22/2026
TIMESHARE ACQUISITIONS AT LEX103/21/2026
PHOENIX 132 SUTTON STREET103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2022$41.4M—ROGER SMITH NEW YORK LLC → TIMESHARE ACQUISITIONS AT LEXINGTON LLC$448/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STONEHILL & TAYLOR ARCHITECTS PC708/26/2025
ADS ENGINEERS1708/06/2025
ZENITH HOME INSPECTIONS106/03/2025
PENNONI ENGINEERING201/17/2025
THORNTON TOMASETTI111/15/2024
ASHRAF CORP403/13/2024
GACE DPC411/28/2023
TERRAFORM ARCHITECTURE PLLC110/03/2022
HAMANN ENGINEERING, PLLC207/27/2020
ROYAL ENGINEERING, P.C102/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE ZONING6203/21/2026
PS ENGINEERS203/21/2026
BIG ORANGE EXPEDITING403/21/2026
MONICA SANTOS EXP203/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLINTLOCK CONSTR SERV LLCGeneral Contractor3507/08/2026
RRP PLUMBING CORPFire Protection907/08/2026
PHOENIX SUTTON STR INCGeneral Contractor807/08/2026
VAND MECHANICAL INCPlumbing707/08/2026
TRIBUTE RESTORATION INCGeneral Contractor607/08/2026
ROBERT CHIMENTIElectrical103/22/2026
Z-CAR-DScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC80112508/26/2025
FRANCISCO D. PEREZ PE3306111/28/2023
Building Lifecycle
All (283)Filed (41)Permit Issued (63)Signed Off (11)Facade (FISP) (23)Violation (60)Inspection (30)Objection (25)Special Inspection (30)
06/29/2026
Signed off — Alteration
M08009137-I1
06/29/2026
Signed off — Alteration
Repair columns and steel framing with new sidewalk with vault slab and beam
M00958478-I1
06/29/2026
Signed off — Alteration
Installation of new secondary fire service line on ground level.
M00960180-I1
06/29/2026
Signed off — Alteration
Propose to repair, replacement of slab and install new beams, slab, framing, and stair opening between 1st and 2nd floor
M00957602-I1
06/29/2026
Signed off — Alteration
M08009079-I1
04/29/2026
Violation issued (HPD, open)
A
04/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/09/2026
Permit issued — Sprinklers
M08011614-I1-EW-SP
12/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/17/2025
Violation issued (HPD, open)
I
11/05/2025
Permit issued — Structural
M01135634-I1-ST
10/31/2025
Cycle 9 facade report signed — SWARMP
10/17/2025
Permit issued — Structural
M08009127-I1-ST
10/17/2025
Permit issued — Mechanical Systems
M08009096-I1-MS
10/14/2025
Permit issued — Mechanical Systems
M00958399-I1-MS
10/02/2025
Cycle 9 facade inspection completed
09/10/2025
Objection raised — Admin
08/26/2025
Filed — Alteration CO
Propose renovating the cellar, replacing the storefront on the 1st and 2nd floors, and reconfiguring exit stairs so they discharge directly to the street. demo and construct partitions, ceilings, and doors. Correct floors 3 -17 to show proper hotel room
M00947143-P4
08/20/2025
Signed off — Alteration
Interior renovations of all floors, removing walls, ceilings and doors as shown on drawings.
M00731392-I1
08/06/2025
Filed — Alteration
Modification of sprinkler heads and related piping for entire building.
M08011614-P3
08/06/2025
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
07/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/07/2025
Objection raised — Fire_Protection
06/27/2025
Filed — Alteration CO
Propose renovating the cellar, replacing the storefront on the 1st and 2nd floors, and reconfiguring exit stairs so they discharge directly to the street. demo and construct partitions, ceilings, and doors. Correct floors 3 -17 to show proper hotel room
M00947143-P3
06/24/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/16/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/05/2025
Permit issued — Sign
M01227864-I1-SG
06/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/03/2025
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - KINGFIELD. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01227864-I1
06/03/2025
Special inspection requirement — Final
ADITYA DESAI
05/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/15/2025
Filed — Alteration
Install mechanical ductwork as shown on drawings filed herewith. In conjunction with ALT W/CO# .
M08009096-P1
05/15/2025
Objection resolved — Addressed
05/15/2025
Objection resolved — Addressed
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
05/13/2025
Filed — Alteration
Install new gas line, new plumbing fixtures and related piping
M00958436-P2
05/08/2025
Objection raised — Scope
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
04/29/2025
Objection resolved — Addressed
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2025
Objection raised — Scope
04/28/2025
Objection raised — Scope
04/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2025
Filed — Alteration
Modification of sprinkler heads and related piping for entire building.
M08011614-P2
04/09/2025
Special inspection requirement — Mechanical Systems
RONALD GRAPIN
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
04/09/2025
Special inspection requirement — Maintenance information
RONALD GRAPIN
04/09/2025
Special inspection requirement — Shutoff dampers
RONALD GRAPIN
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
04/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
04/09/2025
Special inspection requirement — Final
RONALD GRAPIN
04/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
04/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
04/09/2025
Special inspection requirement — Heating Systems
RONALD GRAPIN
Latest 60 of 283 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.01/09/2026
DOB NOWStructuralPermit IssuedANDREW WEISS11/05/2025
DOB NOWStructuralPermit IssuedANDREW WEISS10/17/2025
DOB NOWMechanical SystemsSigned-offANDREW WEISS10/17/2025
DOB NOWMechanical SystemsPermit IssuedANDREW WEISS10/14/2025
DOB NOWSignPermit IssuedZ-CAR-D CORP06/05/2025
DOB NOWPlumbingPermit IssuedVAND MECHANICAL INC03/27/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP02/18/2025
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.01/02/2025
DOB NOWStructuralPermit IssuedANDREW WEISS12/16/2024
DOB NOWMechanical SystemsPermit IssuedANDREW WEISS11/13/2024
DOB NOWStructuralSigned-offANDREW WEISS11/13/2024
DOB NOWGeneral ConstructionPermit IssuedANDREW WEISS11/10/2024
DOB NOWStructuralSigned-offANDREW WEISS11/10/2024
DOB NOWGeneral ConstructionSigned-offANDREW WEISS10/17/2024
DOB NOWGeneral ConstructionSigned-offANDREW WEISS10/17/2024
DOB NOWMechanical SystemsSigned-offANDREW WEISS10/15/2024
DOB NOWStructuralPermit IssuedANDREW WEISS10/15/2024
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.07/12/2024
DOB NOWPlumbingSigned-offVAND MECHANICAL INC07/05/2024
DOB NOWStandpipePermit IssuedRALPH W. LANDOLFI JR.07/01/2024
DOB NOWGeneral ConstructionPermit IssuedANDREW WEISS05/14/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP04/09/2024
DOB NOWStructuralSigned-offANDREW WEISS03/22/2024
DOB NOWPlumbingSigned-offVAND MECHANICAL INC03/21/2024
DOB NOWPlumbingPermit IssuedVAND MECHANICAL INC03/21/2024
DOB NOWMechanical SystemsPermit IssuedANDREW WEISS03/21/2024
DOB NOWStructuralSigned-offANDREW WEISS03/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC01/22/2024
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.12/19/2023
DOB NOWSuspended ScaffoldPermit IssuedA & A RESTORATION, INC12/13/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/15/2023
DOB NOWMechanical SystemsSigned-offANDREW WEISS11/09/2023
DOB NOWGeneral ConstructionSigned-offANDREW WEISS11/09/2023
DOB NOWGeneral ConstructionSigned-offANDREW WEISS11/09/2023
DOB NOWStructuralPermit IssuedANDREW WEISS11/09/2023
DOB NOWPlumbingSigned-offVAND MECHANICAL INC08/04/2023
DOB NOWStructuralPermit IssuedANDREW WEISS07/26/2023
DOB NOWMechanical SystemsSigned-offANDREW WEISS07/26/2023
DOB NOWGeneral ConstructionSigned-offANDREW WEISS07/26/2023
+ 38 more permits on file
2 projects · most recent 05/15/2025
Air Conditioning Systems Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
05/15/2025Signed-offFLINTLOCK CONSTR SERV LLCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric PURY-HP120TNU-A Vrf Outdoor ×10
PFFY-P12NMAU-E3 12,000 BTU · Vrf Indoor ×5
PFFY-P15NEMU-E 15,000 BTU · Vrf Indoor ×5
PFFY-P18NEMU-E 18,000 BTU · Vrf Indoor ×5
PFFY-P48NMHU-E2 48,000 BTU · Vrf Indoor ×5
PURY-HP144TSNU-A Vrf Outdoor ×5
PVFY-P12NAMU-E1 12,000 BTU · Vrf Indoor ×5
PVFY-P18NAMU-E1 18,000 BTU · Vrf Indoor ×5
Heat / Cool
Trane PURY-HP120TNU-A 120,000 BTU · Vrf Outdoor ×75
TURYE1683AN41AN(H) 14,850 CFM · Rooftop Unit ×60
TURYP1203AN40 120,000 BTU · Rooftop Unit ×10
11/21/2023Permit IssuedFLINTLOCK CONSTR SERV LLCRefrigeration Systems
Refrigeration
Trane TPLFYP048EM140B 1,235 CFM · Vrf Indoor ×5
TURYE1683AN40AN 168 CFM · Vrf Outdoor ×4
TPEFYP027MH142A 775 CFM ×1
TPEFYP030MH142A 885 CFM · Rooftop Unit ×1
TPEFYP048MH142A 1,340 CFM · Heat Pump Outdoor ×1
TPLFYP008FM140A 315 CFM · Vrf Indoor ×1
TPLFYP018FM140A 460 CFM · Vrf Indoor ×1
TPLFYP024EM140B 810 CFM · Vrf Indoor ×1
1 project · most recent 08/06/2025
FiledStatusContractorScope
08/06/2025Permit IssuedRRP PLUMBING CORP2,052 heads, 8 outlets
2 projects · most recent 08/06/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/06/2025———
05/13/2025Permit IssuedVAND MECHANICAL INCGas, Storm, Water/Sanitary
8 projects · most recent 12/06/2024
General Wiring
FiledStatusContractorScope
12/06/2024CompleteROBERT CHIMENTI2 meters, 1 new_meters
04/12/2024Permit IssuedAL-LECTRIC ELECT'L CONTRG1 meters, 1 new_meters
02/08/2024CompleteROBERT CHIMENTI46 meters, 1 new_meters
01/03/2024CompleteAL-LECTRIC ELECT'L CONTRG1 meters
03/28/2023Permit IssuedAL-LECTRIC ELECT'L CONTRGGeneral Wiring
06/26/2019CompleteLUX ELECTRIC, INC—
02/22/2019CompleteELPO ELECTRICAL CONTG INC—
03/28/2018CompletePK ELECTRIC INC1 meters
3 projects · most recent 11/28/2023
Steel Concrete
FiledStatusContractorScope
11/28/2023Signed-offFLINTLOCK CONSTR SERV LLCSteel
11/28/2023Signed-offFLINTLOCK CONSTR SERV LLCSteel
10/12/2022Permit IssuedFLINTLOCK CONSTR SERV LLCConcrete
1 project · most recent 11/28/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
11/28/2023Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 30
DateTypeResultReport
04/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2025Pass-Final SD - Fire PumpPassView ↗
06/16/2025Pass-Final SD - Fire PumpPassView ↗
06/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/19/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 30.
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
08/06/2025Sprinkler SystemsRONALD GRAPINspecial
06/03/2025FinalADITYA DESAIprogress
05/14/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
05/07/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
04/09/2025Maintenance informationRONALD GRAPINenergy_progress
04/09/2025HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
04/09/2025HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
04/09/2025HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
04/09/2025Shutoff dampersRONALD GRAPINenergy_progress
04/09/2025Energy Code Compliance InspectionsRONALD GRAPINprogress
04/09/2025Mechanical SystemsRONALD GRAPINspecial
04/09/2025Heating SystemsRONALD GRAPINspecial
04/09/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
04/09/2025FinalRONALD GRAPINprogress
02/28/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
02/28/2025Energy Code Compliance InspectionsRONALD GRAPINprogress
02/28/2025Fire-Resistance Rated ConstructionRONALD GRAPINprogress
02/28/2025Fenestration and door U-factor and product ratingsRONALD GRAPINenergy_progress
02/28/2025Fenestration areasRONALD GRAPINenergy_progress
02/28/2025VestibulesRONALD GRAPINenergy_progress
02/28/2025Air barrier continuity plan testingRONALD GRAPINenergy_progress
02/28/2025Air barrier — testing RONALD GRAPINenergy_progress
02/28/2025Insulation placement and R valuesRONALD GRAPINenergy_progress
02/28/2025Air barrier - visual inspectionRONALD GRAPINenergy_progress
02/28/2025Fenestration air leakageRONALD GRAPINenergy_progress
Latest 25 of 71.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
KingfieldOffice—
Project M01227864 Alteration · Permit Entire · 06/03/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 372 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch37
09/02/2026M00731392-I1Request digital key ↗
09/02/2026M00731409-P1Request digital key ↗
09/02/2026M00731409-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00247200-I1Request digital key ↗
08/15/2026M00247200-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/24/2026M01173529-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00135860-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION34
12/10/2024101981937Open ↗
12/10/2024110026310Open ↗
12/10/2024110289401Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION18
03/31/2023123711625Open ↗
03/24/2023123711625Open ↗
12/10/2021123711625Open ↗
Showing 3 of 18 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
12/20/2023141024816Open ↗
▸Seals & Professional Certifications95
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/05/2026M00135860-I1Open ↗
09/05/2026M00247200-I1Open ↗
09/02/2026M00731409-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M08009120-I1Open ↗
09/02/2026M08009096-P1Open ↗
09/01/2026M08011614-P3Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/15/2019123711625Open ↗
08/07/2019123711625Open ↗
08/07/2019123711625Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/03/2026M00731392-I1Open ↗
09/02/2026M08009096-P1Open ↗
09/02/2026M08009096-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/08/2019123801190Open ↗
10/24/2016122920679Open ↗
06/15/2011120719491Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
06/15/2011120719491Open ↗
08/20/2010120447588Open ↗
12/26/2008110422551Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/08/2019123801190Open ↗
10/24/2016122920679Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/20/2023141024816Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/20/2023141024816Open ↗
▸BISPC FULL REPORT1
01/09/2008110024189Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING5
12/05/2008110404900Open ↗
07/07/2008110289401Open ↗
12/11/2007110026310Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
12/10/2024110026310Open ↗
12/09/2024101981937Open ↗
12/09/2024110404900Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection53
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist39
09/05/2026M00135860-I1Open ↗
09/05/2026M00247200-I1Open ↗
09/02/2026M00731409-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWStreet Tree Checklist4
08/21/2026M00947143-P3Open ↗
08/21/2026M00947143-P2Open ↗
08/21/2026M00947143-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
10/08/2019123801190Open ↗
08/07/2019123711625Open ↗
10/24/2016122920679Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
12/20/2023141024816Open ↗
10/08/2019123801190Open ↗
▸DOB NOWTenant Protection Plan2
09/05/2026M00247200-I1Open ↗
08/13/2026M00247200-P1Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
12/12/2016122920679Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
08/15/2019123711625Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/20/2023141024816Open ↗
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/02/2026M00731409-I1Open ↗
09/01/2026M08009079-I1Open ↗
09/01/2026M08009137-I1Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
08/20/2010120447588Open ↗
12/26/2008110422551Open ↗
07/31/2008110239037Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
06/15/2011120719491Open ↗
12/06/2008110404900Open ↗
08/13/2008110301708Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/25/2024104702715Open ↗
12/20/2023141024816Open ↗
09/03/2019123711625Open ↗
Showing 3 of 4 on file for this type
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
03/01/2024110239037Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/07/2019123711625Open ↗
12/12/2016122920679Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/22/2023123711625Open ↗
06/21/2023123711625Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/20/2023123711625Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/20/2023123711625Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/25/2024104702715Open ↗
03/25/2024104702715Open ↗
03/01/2024110239037Open ↗
Showing 3 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
03/01/2024110239037Open ↗
01/30/2024110422551Open ↗
▸BISMASONRY1
06/20/2023123711625Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/10/2018122920679Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/10/2018122920679Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
06/20/2023123711625Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
01/30/2024104701869Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/25/2024104702715Open ↗
03/04/2024110239037Open ↗
02/06/2024120719491Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
06/15/2011120719491Open ↗
08/20/2010120447588Open ↗
12/26/2008110422551Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/10/2021123711625Open ↗
12/28/2011120719491Open ↗
▸BISFINAL2
03/01/2024110239037Open ↗
06/20/2023123711625Open ↗
▸BISSUPERSEDING LETTER1
03/31/2023123711625Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
10/08/2019123801190Open ↗
08/07/2019123711625Open ↗
10/24/2016122920679Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/11/2024104222164Open ↗
06/20/2023123711625Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET9
10/08/2019123801190Open ↗
08/07/2019123711625Open ↗
10/24/2016122920679Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
06/05/2023123711625Open ↗
08/07/2019123711625Open ↗
08/07/2019123711625Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/20/2023141024816Open ↗
07/31/2008110239037Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/10/2024101981937Open ↗
12/10/2024110289401Open ↗
12/10/2024110404900Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026M00947143-P3Open ↗
08/21/2026M00947143-P2Open ↗
08/21/2026M00947143-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/05/2026M00135860-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00967348-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00967348-I1Open ↗