Public elementary, junior or senior high
I.S. 303 Herbert S. Eisenberg
2650 SHORE PARKWAY · BIN 3196292
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R6Zoning
237,312 sfGross Floor Area
1Units
LL97 Covered32 Open Violations 6 unresolved · 26 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 138,262 sf lot · 1.72 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction60p · 2 filings · 20 docs
Floor 4Under Construction42p · 2 filings · 20 docs
Floor 3Under Construction50p · 2 filings · 20 docs
Floor 2Under Construction30p · 2 filings · 20 docs
Floor 1Under Construction72p · 2 filings · 20 docs
CellarUnder Construction39p · 1 filing · 20 docs
Sub-BasementUnder Construction12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY7709/19/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE IS 303 040903/22/2026
DEPT OF EDU 0103/22/2026
DOE - JHS 303703/22/2026
DEPARTMENT OF EDUCATION1803/22/2026
D.O.E P.S.303303/22/2026
DOE I.S. 303603/22/2026
I.S. 303 DOE503/22/2026
DOE 040503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES1403/21/2026
AME SERVICES1003/21/2026
STANTEC ARCHITECTURE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BQE INDUSTRIES, INCGeneral Contractor2409/19/2026
THERMO TECH MECHANICAL I*General Contractor907/08/2026
N.B.A CONSTRUCTION INCGeneral Contractor407/08/2026
VARSITY PLBG AND HTG INCPlumbing308/20/2026
MOSZO AIR CONDITION AND *General Contractor207/08/2026
ARORA CONSTRUCTION INCGeneral Contractor209/17/2026
BEKKERMAN, MIKHAILElectrical203/21/2026
PANILI PLUMBING & HTG LLCPlumbing208/26/2026
MP & L METAL INCElectrical203/21/2026
L.L.G. PLBG & HTG INCPlumbing106/28/2026
RALPH ISMAEILElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
GENE HUMPHREYSElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
JOHN MILIOTIElectrical103/21/2026
LEONCIO REYESElectrical103/21/2026
ACE ELEC'L CONSTRUCTIONElectrical103/22/2026
REYES LEONCIOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171908/11/2026
JPC LOGISTICS DBA JPCL EN351305/05/2025
Building Lifecycle
All (178)Filed (28)Permit Issued (37)Violation (60)Inspection (3)Objection (20)Special Inspection (30)
09/18/2026
Permit issued — Sidewalk Shed
B00937663-I1-SH
09/16/2026
Permit issued — General Construction
B01192190-I1-GC
08/19/2026
Permit issued — Plumbing
B00849124-S4-PL
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
08/12/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
08/11/2026
Filed — Alteration
TEMPORARILY REMOVE AND REINSTALL EXIST OPERATIONAL MECHANICAL EQUIPMENT TO ACCOMODATE ROOF WORK. MODIFY BOILRE BLOW DOWN PIPING TO ACCOMODATE ARCH SLAB WORK IN CELLAR.
B00849124-P1
08/06/2026
Filed — Alteration
TEMPORARILY REMOVE AND REINSTALL EXIST OPERATIONAL MECHANICAL EQUIPMENT TO ACCOMODATE ROOF WORK. MODIFY BOILRE BLOW DOWN PIPING TO ACCOMODATE ARCH SLAB WORK IN CELLAR.
B00849124-P2
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
08/05/2026
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
08/05/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
08/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
08/03/2026
Permit issued — Plumbing
B00978946-S1-PL
07/30/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
07/27/2026
Permit issued — Structural
B00849124-S5-ST
07/24/2026
Permit issued — General Construction
B00849124-I1-GC
06/22/2026
Permit issued — Sidewalk Shed
B00937663-I1-SH
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, open)
Construction
05/22/2026
Permit issued — General Construction
B00978946-I1-GC
03/31/2026
Permit issued — Mechanical Systems
B00849124-S3-MS
03/24/2026
Permit issued — Sidewalk Shed
B00937663-I1-SH
03/23/2026
Permit issued — Mechanical Systems
B01192190-S1-MS
03/16/2026
Permit issued — Supported Scaffold
B00937660-I1-SF
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/05/2026
Permit issued — Mechanical Systems
B01192190-S1-MS
01/20/2026
Permit issued — Mechanical Systems
B00849124-S3-MS
01/07/2026
Permit issued — Plumbing
B01192190-S2-PL
01/06/2026
Permit issued — General Construction
B01192190-I1-GC
12/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
11/19/2025
Filed — Alteration
Structural work is the installation of a structural beam to support the existing slab at (2) new roof openings for RTU.
B01192190-P2
11/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
MAXIM KORNGOLD
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
11/13/2025
Filed — Alteration
Structural work is the installation of a structural beam to support the existing slab at (2) new roof openings for RTU.
B01192190-P1
11/07/2025
Permit issued — Sidewalk Shed
B00937663-I1-SH
11/07/2025
Permit issued — Construction Fence
B00933475-I1-FN
10/21/2025
Filed — Alteration
H.S. 303-K: Demolish part of the fixed lab tables to create a studio room and art room. Partitions to create 2 new classrooms. New storage closets and new furniture. Lighting work.
B00978946-P5
09/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/19/2025
Violation issued (ECB, closed)
Construction
08/19/2025
Violation issued (ECB, open)
Construction
08/19/2025
Violation issued (ECB, open)
Construction
08/19/2025
Violation issued (ECB, open)
Construction
08/19/2025
Violation issued (ECB, closed)
Construction
08/18/2025
Permit issued — Plumbing
B00849124-S4-PL
07/25/2025
Permit issued — Structural
B00849124-S5-ST
07/25/2025
Permit issued — General Construction
B00849124-I1-GC
07/14/2025
Violation issued (ECB, open)
Construction
07/14/2025
Violation issued (ECB, open)
Construction
07/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/19/2025
Permit issued — Plumbing
B00978946-S1-PL
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC09/18/2026
DOB NOWGeneral ConstructionPermit IssuedARORA CONSTRUCTION INC09/16/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC08/19/2026
DOB NOWPlumbingPermit IssuedPANILI PLUMBING & HTG LLC08/03/2026
DOB NOWStructuralPermit IssuedBQE INDUSTRIES, INC07/27/2026
DOB NOWGeneral ConstructionPermit IssuedBQE INDUSTRIES, INC07/24/2026
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC06/22/2026
DOB NOWGeneral ConstructionPermit IssuedN.B.A CONSTRUCTION INC05/22/2026
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/31/2026
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC03/24/2026
DOB NOWMechanical SystemsPermit IssuedMOSZO AIR CONDITION AND *03/23/2026
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC03/16/2026
DOB NOWMechanical SystemsPermit IssuedMOSZO AIR CONDITION AND *03/05/2026
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*01/20/2026
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC01/07/2026
DOB NOWGeneral ConstructionPermit IssuedARORA CONSTRUCTION INC01/06/2026
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC11/07/2025
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC11/07/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC08/18/2025
DOB NOWStructuralPermit IssuedBQE INDUSTRIES, INC07/25/2025
DOB NOWGeneral ConstructionPermit IssuedBQE INDUSTRIES, INC07/25/2025
DOB NOWPlumbingPermit IssuedPANILI PLUMBING & HTG LLC05/19/2025
DOB NOWGeneral ConstructionPermit IssuedN.B.A CONSTRUCTION INC05/12/2025
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/28/2025
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC03/12/2025
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*12/02/2024
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC11/06/2024
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC11/06/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedBQE INDUSTRIES, INC10/17/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC08/20/2024
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*08/19/2024
DOB NOWGeneral ConstructionPermit IssuedBQE INDUSTRIES, INC08/01/2024
DOB NOWStructuralPermit IssuedBQE INDUSTRIES, INC08/01/2024
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC03/18/2024
DOB NOWSupported ScaffoldPermit IssuedBQE INDUSTRIES, INC12/21/2023
DOB NOWConstruction FencePermit IssuedBQE INDUSTRIES, INC11/17/2023
DOB NOWSidewalk ShedPermit IssuedBQE INDUSTRIES, INC11/17/2023
BISOTISSUEDTHE OUTFIT M&J LLC11/12/2024
BISOTISSUEDIANNELLI CONSTRUCTION CO04/04/2024
BISOTISSUEDTHE OUTFIT M&J LLC03/25/2024
+ 47 more permits on file
3 projects · most recent 08/11/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Permit IssuedBQE INDUSTRIES, INCAssociated Ducts and Piping, Heating and Air Conditioning Systems—
11/19/2025Permit IssuedARORA CONSTRUCTION INCVentilation Systems
Cooling
Trane WHK090A3SON**G2C0A1B10000000000000000000 3,000 CFM · Rooftop Unit ×1
Ventilation
Trane WHK090A3SON**G2C0A1B10000000000000000000 3,000 CFM · Rooftop Unit ×1
05/05/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×4
FUJITSU - ASUB18TLAV2 18,000 BTU · Fan Coil Indoor ×3
FUJITSU - AOU72RLAVL 72,000 BTU · Condensing Unit ×2
FUJITSU - ASUA30TLAV2 30,000 BTU · Fan Coil Indoor ×2
FUJITSU - AOU120RLAVL 120,000 BTU · Vrf Outdoor ×1
FUJITSU - ASUA12TLAV2 12,000 BTU · Fan Coil Indoor ×1
3 projects · most recent 08/11/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
08/11/2026Permit IssuedVARSITY PLBG AND HTG INCStorm
11/19/2025Permit IssuedL.L.G. PLBG & HTG INCWater/Sanitary
10/21/2025Permit IssuedPANILI PLUMBING & HTG LLCGas, Water/Sanitary
17 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
10/09/2025CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
04/10/2025Permit IssuedAUJLA ELECTRIC CORPGeneral Wiring
08/20/2024Permit IssuedHIGH VOLT ELEC CORP. OFGeneral Wiring
05/16/2024CompleteTRU-VAL ELECTRIC CORP.General Wiring
01/16/2024CompleteACE ELEC'L CONSTRUCTIONGeneral Wiring
01/12/2024Permit IssuedI.S.M. ELECTRIC, INC.—
11/15/2023Permit IssuedHIGH VOLT ELEC CORP. OFGeneral Wiring
11/09/2021CompleteABM ELECTRIC, INCGeneral Wiring
09/01/2021Permit IssuedJ&H ELECTRICAL CONT INCGeneral Wiring
11/30/2020CompleteCHARAN ELEC'L ENTERP'S IN—
11/12/2020CompleteLEVIS ELECTR'L CONTR. CORGeneral Wiring
09/01/2020CompleteKANTA ELECTRIC CORP.General Wiring
10/09/2019CompleteCHARAN ELEC'L ENTERP'S IN—
12/11/2018CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 08/11/2026
Steel
FiledStatusContractorScope
08/11/2026Permit IssuedVARSITY PLBG AND HTG INC1 scope_items
11/19/2025Permit IssuedARORA CONSTRUCTION INCSteel
2 projects · most recent 10/10/2024
Scaffold Fence
FiledStatusContractorScope
10/10/2024Permit IssuedBQE INDUSTRIES, INCScaffold
11/14/2023Permit IssuedBQE INDUSTRIES, INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
08/12/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
08/12/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
08/05/2026Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
08/05/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
08/05/2026MasonryMIKHAIL ZEYGMANspecial
08/05/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
08/05/2026Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
07/30/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
07/30/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
12/03/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
11/25/2025Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
11/18/2025Fire-Resistance Rated ConstructionMAXIM KORNGOLDprogress
11/18/2025Fire-Resistant Penetrations and Joints—special
11/18/2025Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
05/02/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/30/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/22/2025Post-installed AnchorsAsma Hashmispecial
04/22/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
04/21/2025FinalAsma Hashmiprogress
04/21/2025Mechanical SystemsAsma Hashmispecial
04/14/2025Structural Steel - High Strength BoltingHakeem Alshawabkehspecial
04/14/2025Structural Stability – Alterations of existing buildingsHakeem Alshawabkehspecial
04/14/2025FinalHakeem Alshawabkehprogress
04/14/2025Structural Steel - WeldingHakeem Alshawabkehspecial
04/14/2025Structural Steel - DetailsHakeem Alshawabkehspecial
Latest 25 of 48.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
09/01/2026B00592673-I1Request digital key ↗
08/27/2026B00849124-S3Request digital key ↗
08/27/2026B00849124-P2Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
11/28/2014320539627Open ↗
07/21/2014321056708Open ↗
07/11/2014320722054Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
07/15/2014321056708Open ↗
04/01/2013320539627Open ↗
04/06/2009320003802Open ↗
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/01/2026B00592673-I1Open ↗
08/27/2026B00849124-I1Open ↗
08/27/2026B00849124-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/21/2026B00849124-P1Open ↗
09/21/2026B00849124-P1Open ↗
09/01/2026B00937660-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/31/2026B00849124-P2Open ↗
08/29/2026B01192190-I1Open ↗
08/28/2026B00849124-S2Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
04/01/2013320539627Open ↗
04/01/2013320539627Open ↗
04/01/2013320539627Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/01/2013320539627Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/06/2009320003802Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/15/2014321056708Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
04/06/2009320003802Open ↗
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/13/2026B00933475-P1Open ↗
08/13/2026B00937660-P1Open ↗
Showing 2 of 5 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026B00978946-S1Open ↗
08/24/2026B00978946-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/06/2009320003802Open ↗
▸Approvals, Objections & Sign-offs75
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
09/01/2026B00592673-I1Open ↗
08/27/2026B00849124-P1Open ↗
08/27/2026B00849124-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)29
08/27/2026B00849124-P1Open ↗
08/27/2026B00849124-P2Open ↗
08/19/2026B01192190-S2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026B00849124-S2Open ↗
08/13/2026B00849124-S1Open ↗
08/13/2026B00937663-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter7
08/13/2026B01192190-S1Open ↗
08/13/2026B01192190-S2Open ↗
08/13/2026B00849124-I1Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/01/2013320539627Open ↗
04/06/2009320003802Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/15/2014321056708Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/06/2009320003802Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
07/15/2014321056708Open ↗
04/15/2013320722054Open ↗
03/05/2013320539627Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAI1 Form2
08/27/2026B00849124-I1Open ↗
08/27/2026B00849124-P2Open ↗
▸Other Documents35
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
08/27/2026B00849124-P1Open ↗
08/27/2026B00849124-P2Open ↗
08/19/2026B01192190-S2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProof of Historic Building6
08/27/2026B00849124-P2Open ↗
08/13/2026B00978946-I1Open ↗
08/13/2026B00978946-P1Open ↗
Showing 3 of 6 on file for this type
▸BISL2 - REQUESTS FOR OVERRIDES, REDUCTIONS, OR WAIVER1
11/28/2014320539627Open ↗