← Back
School or academy
Salanter Akiba Riverdale Academy
503 WEST 259 STREET · BIN 2086339
💬 Discuss this project
2003Year Built
6Stories
W3Building Class
R4Zoning
109,914 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
School or academy · 90,858 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof9p · 6 filings · 20 docs
Floor 6Under Construction3p · 3 filings · 20 docs
Floor 5Under Construction5p · 4 filings · 20 docs
Floor 4Under Construction63p · 1 filing · 20 docs
Floor 3Under Construction62p · 2 filings · 20 docs
Floor 2Under Construction61p · 1 filing · 20 docs
Floor 1Under Construction60p · 1 filing · 20 docs
CellarUnder Construction56p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAR ACADEMY ORGANIZATION3508/29/2026
TO THE OWNER OF 503 W 259103/22/2026
HUDSON CONSTRUCTION MNGT.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
DOMANI CONSULTING3003/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
A1 EXPEDITING SERVICE603/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BALGARD LOCKSMITHS INCGeneral Contractor1507/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor204/09/2026
D.D.S. MECH PBG&HTG CORPPlumbing208/01/2026
SKYVIEW HTG&AIR CON CORPPlumbing107/08/2026
BRENMAC CORPGeneral Contractor107/08/2026
DDS MECHANICAL FPS CORPFire Protection107/08/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394707/29/2026
CERTIFIED TESTING LABORAT396402/19/2026
JOEL PHAGOO ,PE, PLLC2416206/09/2025
BECKER ENGINEERING, PC633205/01/2023
HANSEN ENGINEERING PC8174312/22/2022
Building Lifecycle
All (167)Filed (23)Permit Issued (18)Signed Off (11)Violation (47)Inspection (20)Objection (18)Special Inspection (30)
08/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2026
Permit issued — Plumbing
X01405522-I1-PL
07/29/2026
Filed — Alteration
Installing sinks, emergency showers and bunsen burners for classroom lab.
X01405522-P1
07/27/2026
Special inspection requirement — Post-installed Anchors
Paul Raymond
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/13/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/22/2026
Signed off — Alteration
Installing Structural system for proposed enlargement filed under Alt# X00784702-P2 - Vertical enlargement proposed for 4ththrough 6th floors and roof.
X01208943-I1
05/21/2026
Filed — Alteration
Installing sinks, emergency showers and bunsen burners for classroom lab.
X01405522-I1
05/21/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND DUCTWORK TO SERVE ADDITIONAL CLASSROOMS IN EXISTING HIGH SCHOOL BUILDING. RELOCATING HVAC UNITS FROM 3RD AND 4TH FLOOR TO NEW UPPER ROOF.
X01212967-I1
05/12/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AND PIPING TO COORDINATE WITH NEW ARCHITECTURAL ROOM LAYOUTS. INSTAL ROOF DRAINS
X01212905-S1
05/12/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AND PIPING TO COORDINATE WITH NEW ARCHITECTURAL ROOM LAYOUTS. INSTAL ROOF DRAINS
X01212905-I1
05/07/2026
Permit issued — General Construction
X00782704-I1-GC
04/07/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
X01196184-I1
03/02/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
X01196184-S1
02/25/2026
Filed — No Work
X01363026-I1
02/23/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
KIRT DOBBINS
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
KIRT DOBBINS
02/23/2026
Special inspection requirement — Fenestration air leakage
KIRT DOBBINS
02/23/2026
Special inspection requirement — Air barrier - visual inspection
KIRT DOBBINS
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
KIRT DOBBINS
02/23/2026
Special inspection requirement — Interior lighting power
KIRT DOBBINS
02/23/2026
Special inspection requirement — Fenestration areas
KIRT DOBBINS
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KIRT DOBBINS
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
02/23/2026
Special inspection requirement — Lighting controls
KIRT DOBBINS
02/19/2026
Filed — Alteration CO
Filing to infill opening (South Atrium), to create new classrooms, demolition & install interior partitions,filing to comply with audit regarding increase occupant load at 2flmost work filed,approved,permitted under alt#220652791.
X00782704-P3
01/14/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/30/2025
Special inspection requirement — Post-installed Anchors
Paul Raymond
10/29/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND PIPING TO COORDINATE WITH NEW ARCHITECTURAL ROOM LAYOUTS. INSTAL ROOF DRAINS
X01212905-P1
06/12/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
06/09/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
X01196184-P1
06/05/2025
Permit issued — Mechanical Systems
X01212967-I1-MS
05/27/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
05/22/2025
Permit issued — Structural
X01208943-I1-ST
05/19/2025
Permit issued — General Construction
X00782704-I1-GC
05/16/2025
Permit issued — Sidewalk Shed
X01196184-I1-SH
05/16/2025
Permit issued — Supported Scaffold
X01196184-S1-SF
05/15/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
X01196184-I1
05/15/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
X01196184-S1
05/13/2025
Objection resolved — Addressed
04/30/2025
Permit issued — Plumbing
X01212905-S1-PL
04/30/2025
Permit issued — Sprinklers
X01212905-I1-EW-SP
04/30/2025
Objection raised — Structural
04/21/2025
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND DUCTWORK TO SERVE ADDITIONAL CLASSROOMS IN EXISTING HIGH SCHOOL BUILDING. RELOCATING HVAC UNITS FROM 3RD AND 4TH FLOOR TO NEW UPPER ROOF.
X01212967-I1
04/21/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND PIPING TO COORDINATE WITH NEW ARCHITECTURAL ROOM LAYOUTS. INSTAL ROOF DRAINS
X01212905-S1
04/21/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND PIPING TO COORDINATE WITH NEW ARCHITECTURAL ROOM LAYOUTS. INSTAL ROOF DRAINS
X01212905-I1
04/18/2025
Filed — Alteration
Installing Structural system for proposed enlargement filed under Alt# X00784702-P2 - Vertical enlargement proposed for 4ththrough 6th floors and roof.
X01208943-I1
04/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
04/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedD.D.S. MECH PBG&HTG CORP07/31/2026
DOB NOWGeneral ConstructionPermit IssuedBALGARD LOCKSMITHS INC05/07/2026
DOB NOWMechanical SystemsSigned-offBALGARD LOCKSMITHS INC06/05/2025
DOB NOWStructuralSigned-offBALGARD LOCKSMITHS INC05/22/2025
DOB NOWGeneral ConstructionPermit IssuedBALGARD LOCKSMITHS INC05/19/2025
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP05/16/2025
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP05/16/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP04/30/2025
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP04/30/2025
DOB NOWSuspended ScaffoldPermit IssuedKMM CONSTRUCTION OF NY IN09/30/2024
DOB NOWGeneral ConstructionPermit IssuedBALGARD LOCKSMITHS INC05/07/2024
DOB NOWGeneral ConstructionPermit IssuedBALGARD LOCKSMITHS INC04/24/2023
DOB NOWPlumbingSigned-offSKYVIEW HTG&AIR CON CORP03/01/2023
DOB NOWMechanical SystemsSigned-offBALGARD LOCKSMITHS INC01/03/2023
DOB NOWGeneral ConstructionPermit IssuedBALGARD LOCKSMITHS INC12/08/2022
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC12/02/2022
DOB NOWStructuralSigned-offBALGARD LOCKSMITHS INC08/16/2022
DOB NOWSidewalk ShedSigned-offBRENMAC CORP08/31/2018
BISSPISSUEDVILLAGE P & H NY INC03/13/2023
BISOTISSUEDBALGARD LOCKSMITHS INC07/11/2022
BISOTISSUEDBALGARD LOCKSMITHS INC07/11/2022
BISMHISSUEDBALGARD LOCKSMITHS INC07/11/2022
BISOTISSUEDBALGARD LOCKSMITHS INC11/10/2021
BISOTISSUEDBALGARD LOCKSMITHS INC11/10/2021
BISMHISSUEDBALGARD LOCKSMITHS INC11/10/2021
BISMHISSUEDBALGARD LOCKSMITHS INC05/14/2019
BISOTISSUEDBALGARD LOCKSMITHS INC05/14/2019
BISOTISSUEDBALGARD LOCKSMITHS INC05/14/2019
BISSPISSUEDMEJ PLUMBING LLC09/20/2018
BISOTISSUEDBALGARD LOCKSMITHS INC09/12/2018
BISMHISSUEDBALGARD LOCKSMITHS INC08/07/2018
BISOTISSUEDBALGARD LOCKSMITHS INC08/07/2018
BISOTISSUEDBALGARD LOCKSMITHS INC08/07/2018
BISMHISSUEDSKYVIEW HEATING & AIR CON07/26/2018
BIS—ISSUEDBALGARD LOCKSMITHS INC05/31/2017
BIS—ISSUEDBALGARD LOCKSMITHS INC02/14/2017
BISOTISSUEDBALGARD LOCKSMITHS INC09/15/2016
BISOTISSUEDBALGARD LOCKSMITHS INC11/08/2013
BIS—ISSUEDA.M.A HOLDINGS INC08/29/2013
BISOTISSUEDBALGARD LOCKSMITHS INC08/17/2012
+ 28 more permits on file
1 project · most recent 04/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/21/2025Signed-offBALGARD LOCKSMITHS INCHeating and Air Conditioning Systems
Heat / Cool
Aaon RN-013-3-H-GAAY-V0-21-000-A 12 tons · Rooftop Unit ×1
RN-016-3-0-GAAY-V0-21-000-A 15 tons · Rooftop Unit ×1
1 project · most recent 10/29/2025
FiledStatusContractorScope
10/29/2025Signed-offDDS MECHANICAL FPS CORP73 heads
2 projects · most recent 07/29/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
07/29/2026Permit IssuedD.D.S. MECH PBG&HTG CORPGas, Water/Sanitary
10/29/2025Signed-offD.D.S. MECH PBG&HTG CORPGas, Storm, Water/Sanitary
3 projects · most recent 04/11/2025
General Wiring
FiledStatusContractorScope
04/11/2025Permit IssuedMETROPOLIS ELECTRIC CORPGeneral Wiring
03/12/2025CompleteANTHONY G FERRY INC—
08/30/2018CompleteWCK ELECTRIC CORP.—
2 projects · most recent 02/19/2026
Steel Concrete
FiledStatusContractorScope
02/19/2026Permit IssuedBALGARD LOCKSMITHS INC2 scope_items
04/18/2025Signed-offBALGARD LOCKSMITHS INCSteel, Concrete
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/13/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/02/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/07/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/14/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2023Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
07/27/2026Post-installed AnchorsPaul Raymondspecial
07/27/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/23/2026Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
02/23/2026Exterior Insulation and Finish Systems (EIFS)KIRT DOBBINSspecial
02/23/2026Fire-Resistance Rated ConstructionKIRT DOBBINSprogress
02/23/2026Energy Code Compliance InspectionsKIRT DOBBINSprogress
02/23/2026Interior lighting powerKIRT DOBBINSenergy_progress
02/23/2026Lighting controlsKIRT DOBBINSenergy_progress
02/23/2026Air barrier - visual inspectionKIRT DOBBINSenergy_progress
02/23/2026Fenestration air leakageKIRT DOBBINSenergy_progress
02/23/2026Fenestration areasKIRT DOBBINSenergy_progress
02/23/2026Fenestration and door U-factor and product ratingsKIRT DOBBINSenergy_progress
10/30/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
10/30/2025Post-installed AnchorsPaul Raymondspecial
06/12/2025Post-installed AnchorsJOEL PHAGOOspecial
05/27/2025Post-installed AnchorsJOEL PHAGOOspecial
04/18/2025Sprinkler SystemsPaul Raymondspecial
04/18/2025Duct leakage testing, insulation and designPaul Raymondenergy_progress
04/18/2025Shutoff dampersPaul Raymondenergy_progress
04/18/2025Maintenance informationPaul Raymondenergy_progress
04/18/2025HVAC-R and service water heating system controlsPaul Raymondenergy_progress
04/18/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
04/18/2025HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
04/18/2025FinalPaul Raymondprogress
04/18/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
Latest 25 of 73.
▾Documents — 554 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch22
08/26/2026X00072765-I1Request digital key ↗
08/24/2026X00784070-I1Request digital key ↗
08/23/2026X08029225-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026X01363026-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION43
09/05/2023220652791Open ↗
09/01/2023220652791Open ↗
08/07/2023220652791Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION36
03/13/2023220652791Open ↗
05/14/2019220652791Open ↗
05/14/2019220652791Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/02/2017220577025Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY1
01/05/2017220577016Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00782704-I1Open ↗
▸Seals & Professional Certifications176
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
01/24/2020220655155Open ↗
11/19/2018220678354Open ↗
06/18/2018220655155Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026X08046974-I1Open ↗
09/01/2026X08046974-I1Open ↗
08/30/2026X00830054-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026X01212905-I1Open ↗
09/02/2026X01212905-I1Open ↗
09/01/2026X08046974-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
02/18/2020220725614Open ↗
11/19/2018220678354Open ↗
06/18/2018220655155Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/23/2026X08029225-I1Open ↗
08/23/2026X00830054-I1Open ↗
08/23/2026X00830054-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
08/14/2013220330149Open ↗
08/17/2012220227564Open ↗
06/04/2012220206836Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/18/2020220725614Open ↗
11/19/2018220678354Open ↗
06/18/2018220655155Open ↗
Showing 3 of 8 on file for this type
▸BISPC FULL REPORT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/08/2013240041003Open ↗
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
09/15/2021220652979Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/19/2018220678354Open ↗
06/06/2018220652791Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSIGN HANGER CERTIFICATE1
08/31/2013220330149Open ↗
▸BISSPRINKLER SYSTEMS1
06/22/2022220652791Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/23/2026X00782704-P1Open ↗
08/23/2026X00782704-I1Open ↗
08/23/2026X00782704-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
08/12/2020220725614Open ↗
07/09/2018220652791Open ↗
02/07/2017220577025Open ↗
▸BISSTREET TREE SIGNOFF1
12/13/2022220652791Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00782704-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00782704-I1Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/19/2018220678354Open ↗
06/18/2018220655155Open ↗
06/06/2018220652791Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/24/2020220655155Open ↗
11/29/2017220577025Open ↗
10/20/2017220549306Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2022220652791Open ↗
▸BISLIGHTING CONTROLS1
06/22/2022220652791Open ↗
▸BISFENESTRATION AIR LEAKAGE1
06/22/2022220652791Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
06/22/2022220652791Open ↗
▸BISINTERIOR LIGHTING POWER1
06/22/2022220652791Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/22/2022220652791Open ↗
▸BISFENESTRATION AREAS1
06/22/2022220652791Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
06/22/2022220652791Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00782704-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
07/09/2018220652791Open ↗
06/05/2012220206836Open ↗
06/04/2012220206836Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
07/09/2018220652791Open ↗
06/05/2012220206836Open ↗
06/04/2012220206836Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
06/22/2022220652791Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
06/22/2022220652791Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
06/22/2022220652791Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/06/2023220652791Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
06/22/2022220652791Open ↗
▸BISMASONRY1
06/22/2022220652791Open ↗
▸Approvals, Objections & Sign-offs87
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
11/06/2023220652791Open ↗
02/02/2023220652979Open ↗
06/13/2022220655155Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/23/2026X08029225-I1Open ↗
08/23/2026X00830054-P1Open ↗
08/23/2026X00830054-I1Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
08/17/2012220227564Open ↗
06/14/2012220190987Open ↗
06/04/2012220206836Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
02/18/2020220725614Open ↗
04/17/2018220577025Open ↗
04/17/2018220577025Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/18/2020220725614Open ↗
11/19/2018220678354Open ↗
06/04/2012220206836Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER1
03/13/2023220652791Open ↗
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT41
02/18/2020220725614Open ↗
11/19/2018220678354Open ↗
08/07/2018220652791Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/30/2023220652979Open ↗
12/13/2022220652791Open ↗
06/09/2022220655155Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/14/2019220652791Open ↗
08/08/2018220652791Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
05/14/2019220652791Open ↗
03/30/2018220577025Open ↗
▸Filing & Intake Forms38
▸BISEFILING COVER SHEET19
02/18/2020220725614Open ↗
11/19/2018220678354Open ↗
06/18/2018220655155Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION14
09/01/2023220652791Open ↗
08/07/2023220652791Open ↗
08/07/2023220652791Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM4
01/24/2020220655155Open ↗
04/16/2018220577025Open ↗
03/30/2018220577025Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/08/2013240041003Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
08/23/2026X00782704-P2Open ↗
08/23/2026X00782704-P1Open ↗
08/23/2026X00782704-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
06/06/2018220652791Open ↗
01/05/2017220577025Open ↗
▸DOB NOWCalculations2
08/13/2026X01110236-I1Open ↗
08/13/2026X01117041-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026X01117041-I1Open ↗
08/13/2026X01110236-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00782704-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00072765-I1Open ↗