← Back
Two family brick
505 3 STREET
BROOKLYN · Park Slope · BIN 3025342
💬 Discuss this project
1899Year Built
3Stories
B1Building Class
R6AZoning
3,128 sfGross Floor Area
2Units
Two family brick · 1,530 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.201/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MR. AIR NYC CORPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781201/10/2024
Building Lifecycle
All (24)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (20)
01/12/2024
Signed off — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00961334-I1
01/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
01/12/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/10/2024
Filed — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00961334-P1
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/09/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
12/04/2023
Permit issued — Mechanical Systems
B00961334-I1-MS
11/14/2023
Filed — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 3-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00961334-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP12/04/2023
BISPLISSUEDHENRY MYERS P & H, INC11/26/2008
1 project · most recent 11/03/2023
HVAC Wiring
FiledStatusContractorScope
11/03/2023CompleteINTELOGIC ELECTRIC, INC.HVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/12/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/12/2024Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
01/12/2024Mechanical SystemsCHRISTIAN LOZADAspecial
01/12/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/12/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/12/2024FinalCHRISTIAN LOZADAprogress
01/12/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/12/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/12/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
01/12/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
01/09/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/09/2024Mechanical SystemsCHRISTIAN LOZADAspecial
01/09/2024Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
01/09/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/09/2024FinalCHRISTIAN LOZADAprogress
01/09/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/09/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/09/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
01/09/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/09/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00961334-I1Request digital key ↗
08/26/2026B00961334-P1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
11/26/2008310208423Open ↗
11/17/2008310208423Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/14/2008310208423Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00961334-P1Open ↗
09/01/2026B00961334-P1Open ↗
09/01/2026B00961334-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00961334-P1Open ↗
09/01/2026B00961334-P1Open ↗
08/30/2026B00961334-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00961334-I1Open ↗
08/13/2026B00961334-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/14/2008310208423Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
01/09/2009310208423Open ↗
▸BISSCHEDULE B - PLUMBING1
10/14/2008310208423Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/14/2008310208423Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSUPERSEDING LETTER1
11/17/2008310208423Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/16/2009310208423Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/14/2008310208423Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/16/2009310208423Open ↗
10/24/2008310208423Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/14/2008310208423Open ↗