← Back
BuildNYC
Other college and university
510 WEST 121ST STREET
MANHATTAN · Morningside Heights · BIN 1083643
💬 Discuss this project
1910Year Built
9Stories
W6Building Class
R8Zoning
476,512 sfGross Floor Area
1Units
LL97 Covered8 Active Violations 2 unresolved · 6 paperwork only 29 likely answered 3 old, status unconfirmed ▸FISP: SWARMP
Other college and university · 133,715 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTeachers College Columbia University, Teacher's College31p · 5 filings · 17 docs
PenthouseGrace Dodge Hall columns repair1p · 1 filing · 5 docs
Floor 7Grace Dodge Hall columns repair2p · 1 filing · 5 docs
Floor 6
Floor 5Teacher's College32p · 4 filings · 16 docs
Floor 4Teacher's College32p · 4 filings · 16 docs
Floor 3
Floor 2
Floor 1
Site & exteriorTeachers College Columbia University17p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Construction Mang1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus New York108/22/2024
Rimkus108/08/2024
R.G. Vanderweil Engineers312/12/2022
Joseph J. Aliotta, AIA208/10/2022
Superstructures Engineering + Architects204/29/2022
KZ Engineering205/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kma Designs203/21/2026
Socotec1603/21/2026
Synergy Building Consultants203/21/2026
Danico Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mamais ContractingGeneral Contractor403/21/2026
Kings Group NYScaffold407/08/2026
CS BridgeScaffold307/08/2026
Skyline Builders GroupGeneral Contractor207/08/2026
Commercial Electric ContElectrical203/21/2026
Henry Restorationspecialty_contractor203/21/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
Off Shore ElectricElectrical103/21/2026
Twins ElectricElectrical103/21/2026
R & L SystemsElectrical103/21/2026
High Quality Electric ofElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rimkus New York8123108/22/2024
Alan Margolin & Associates423712/12/2022
Building Lifecycle
All (147)Filed (13)Permit Issued (14)Signed Off (4)Facade (FISP) (20)Violation (60)Inspection (3)Objection (4)Special Inspection (29)
07/23/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF nycc
M01093161-I1
07/09/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR FACADE RESTORATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01094170-I1
07/09/2026
Cycle 10 facade report submitted
07/07/2026
Cycle 10 facade inspection completed
04/13/2026
Cycle 9 facade report signed — SWARMP
03/25/2026
Cycle 9 facade inspection completed
03/20/2026
Permit issued — Suspended Scaffold
M01374556-I1-SC
03/18/2026
Filed — Alteration
ROPE ACCESS INSTALLATION FOR FACADE ACCESS AND INSPECTIONS
M01374556-I1
02/04/2026
Violation issued (ECB, closed)
Construction
01/20/2026
Cycle 9 facade report submitted
10/03/2025
Permit issued — General Construction
M01094170-I1-GC
09/10/2025
Cycle 9 facade report signed — UNSAFE
08/14/2025
Cycle 9 facade inspection completed
07/29/2025
Permit issued — Supported Scaffold
M01093161-I1-SF
07/28/2025
Permit issued — Sidewalk Shed
M01093161-I1-SH
07/08/2025
Permit issued — Suspended Scaffold
M01248313-I1-SC
07/02/2025
Objection resolved — Addressed
07/01/2025
Objection raised — Other
06/30/2025
Filed — Alteration
INSTALLATION OF THE SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01248313-I1
12/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2024
Violation issued (ECB, closed)
Construction
11/13/2024
Cycle 9 facade report submitted
10/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2024
Violation issued (ECB, closed)
Construction
10/07/2024
Permit issued — General Construction
M01094170-I1-GC
09/17/2024
Objection resolved — Addressed
09/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DAVIS
09/11/2024
Objection raised — Other
08/22/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR FACADE RESTORATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01094170-I1
08/09/2024
Special inspection requirement — Post-installed Anchors
WILLIAM DAVIS
08/09/2024
Special inspection requirement — Masonry
WILLIAM DAVIS
08/09/2024
Special inspection requirement — Final
WILLIAM DAVIS
08/08/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF nycc
M01093161-I1
08/08/2024
Permit issued — Sidewalk Shed
M01093161-I1-SH
08/08/2024
Permit issued — Sidewalk Shed
M01093161-I1-SF
01/16/2024
Violation issued (ECB, closed)
Local Law
08/31/2023
Violation issued (ECB, closed)
Elevators
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/08/2023
Permit issued — General Construction
M00725246-I1-GC
12/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2022
Filed — Alteration
plumbing modifications
M00691486-P1
08/11/2022
Special inspection requirement — Final
Young Suh
08/11/2022
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
08/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/11/2022
Special inspection requirement — Post-installed Anchors
Young Suh
08/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/10/2022
Filed — Alteration
ARCHITECTURAL RENOVATION & INFRASTRUCTURE. RENOVATION OF THE 4TH & 5TH FLOOR GRACE DODGE CLASSROOMS AND ASSOCIATED HVAC & IT INFRASTRUCTURE
M00725246-P1
08/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/10/2022
Special inspection requirement — Post-installed Anchors
Young Suh
08/10/2022
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedTC Zone03/20/2026
DOB NOWGeneral ConstructionSigned-offSkyline Builders Group10/03/2025
DOB NOWSupported ScaffoldSigned-offKings Group NY07/29/2025
DOB NOWSidewalk ShedSigned-offKings Group NY07/28/2025
DOB NOWSuspended ScaffoldPermit IssuedC&C Daley's Construction07/08/2025
DOB NOWGeneral ConstructionSigned-offSkyline Builders Group10/07/2024
DOB NOWSidewalk ShedSigned-offKings Group NY08/08/2024
DOB NOWSidewalk ShedSigned-offKings Group NY08/08/2024
DOB NOWGeneral ConstructionPermit IssuedMamais Contracting05/08/2023
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating07/27/2022
DOB NOWGeneral ConstructionPermit IssuedMamais Contracting06/22/2022
DOB NOWStructuralPermit IssuedHenry Restoration04/20/2022
DOB NOWSupported ScaffoldSigned-offCS Bridge05/24/2019
DOB NOWSidewalk ShedSigned-offCS Bridge05/22/2019
BISOTISSUEDKing Rose of NY06/03/2019
BISOTISSUEDKing Rose of NY06/03/2019
BISMHISSUEDKing Rose of NY06/03/2019
BISPLISSUEDTaggart Associates09/11/2013
BISEQISSUEDRepublic Scaffold06/18/2012
BISEQISSUEDRepublic Scaffold05/22/2012
BISOTISSUEDSoho Contracting05/17/2012
BISPLISSUEDAbsolute Plumbing & Heating03/26/2012
BISOTISSUEDTSS Facility Services02/10/2012
BISPLISSUEDThe Right Connection P&H11/17/2011
BISOTISSUEDIdeal Interiors11/14/2011
BISOTISSUEDIdeal Interiors11/14/2011
BISMHISSUEDIdeal Interiors11/14/2011
BISOTISSUEDIdeal Interiors09/02/2011
BISEQISSUEDIdeal Interiors09/02/2011
BISEQISSUEDConsolidated Scaffold & Bridge08/09/2011
BISOTISSUEDIdeal Interiors06/01/2011
BISOTISSUEDAbbey Tent & Party Rental05/17/2011
BISEQISSUEDPerimeter Bridge & Scaffo05/17/2011
BISMHISSUEDReliable Fire Protection04/18/2011
BISOTISSUEDColumbia University04/14/2011
BISOTISSUEDJDP Contracting Services11/24/2010
BISEQISSUEDCS Bridge10/04/2010
BISEQISSUEDCS Bridge10/04/2010
BISPLISSUEDMiller Plumbing & Heating07/30/2010
BISOTISSUEDStructure Tone06/30/2010
+ 24 more permits on file
1 project · most recent 05/03/2022
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/03/2022——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems
Cooling
Ventrol CSU−16K STM/CHW 16,000 CFM · Ahu ×2
Heating
Trane S-060 900 CFM · Unit Heater ×1
1 project · most recent 12/12/2022
Water/Sanitary
FiledStatusContractorScope
12/12/2022Signed-offJohn Fitzgerald Plumbing & HeatingWater/Sanitary
4 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedFirst Choice Electrical—
10/23/2024CompleteHigh Quality Electric of—
07/16/2019CancelledAmra ElectricalGeneral Wiring
05/21/2019CompleteNash Electric Services—
2 projects · most recent 04/29/2022
Steel Concrete
FiledStatusContractorScope
04/29/2022——Steel, Concrete
04/11/2022Permit IssuedHenry RestorationSteel
1 project · most recent 08/08/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/08/2024Signed-offKings Group NYScaffold, Sidewalk Shed
2 projects · most recent 03/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/18/2026Permit IssuedTC Zone—
06/30/2025Permit IssuedC&C Daley's ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/17/2024Structural Stability – Alterations of existing buildingsWILLIAM DAVISspecial
08/09/2024Post-installed AnchorsWILLIAM DAVISspecial
08/09/2024MasonryWILLIAM DAVISspecial
08/09/2024FinalWILLIAM DAVISprogress
08/11/2022FinalYoung Suhprogress
08/11/2022Sprayed fire-resistant materialsYoung Suhspecial
08/11/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
08/11/2022Post-installed AnchorsYoung Suhspecial
08/11/2022Energy Code Compliance InspectionsYoung Suhprogress
08/10/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
08/10/2022Post-installed AnchorsYoung Suhspecial
08/10/2022Sprayed fire-resistant materialsYoung Suhspecial
08/10/2022Energy Code Compliance InspectionsYoung Suhprogress
08/10/2022FinalYoung Suhprogress
03/17/2022Post-installed AnchorsYoung Suhspecial
03/17/2022Energy Code Compliance InspectionsYoung Suhprogress
03/17/2022Structural Steel - DetailsYoung Suhspecial
03/17/2022Concrete - Cast-In-PlaceYoung Suhspecial
03/17/2022Sprayed fire-resistant materialsYoung Suhspecial
03/17/2022Structural Steel - High Strength BoltingYoung Suhspecial
03/17/2022Structural Steel - WeldingYoung Suhspecial
03/11/2022Structural Stability – Alterations of existing buildingsYoung Suhspecial
03/11/2022Structural Steel - WeldingYoung Suhspecial
03/11/2022FinalYoung Suhprogress
03/11/2022Structural Steel - DetailsYoung Suhspecial
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Teacher's CollegeEducationEntire building
Project M01094170 Alteration · LOC Issued · 08/22/2024
Project M01374556 Alteration · Permit Entire · 03/18/2026
Project M00682168 Alteration · Approved · 05/03/2022
Project M00691470 Alteration · Approved · 04/29/2022
Project M00725246 Alteration · Permit Entire · 04/28/2022
Project M00691486 Alteration · Permit Entire · 04/19/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 627 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
09/06/2026M01374556-I1Request digital key ↗
09/02/2026M00696603-I1Request digital key ↗
09/02/2026M00691486-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00169903-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00169906-I1Request digital key ↗
▸Applications & Permits126
▸BISPLAN / WORK APPROVAL APPLICATION74
08/06/2020104101936Open ↗
07/29/2020104101936Open ↗
07/27/2020104101936Open ↗
Showing 3 of 74 on file for this type
▸BISWORK PERMIT APPLICATION45
07/23/2019123763249Open ↗
06/03/2019123763249Open ↗
06/03/2019123763249Open ↗
Showing 3 of 45 on file for this type
▸BISPLACE OF ASSEMBLY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Seals & Professional Certifications169
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION96
06/03/2019123763249Open ↗
05/30/2019123763249Open ↗
05/30/2019123763249Open ↗
Showing 3 of 96 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM22
06/15/2012121101477Open ↗
05/23/2012121086653Open ↗
01/03/2012120935667Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00169903-I1Open ↗
09/02/2026M00691486-P1Open ↗
09/02/2026M00691486-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00725246-P1Open ↗
08/26/2026M00725246-I1Open ↗
08/26/2026M00682168-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00725246-P1Open ↗
08/26/2026M00725246-I1Open ↗
08/26/2026M00682168-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING9
04/29/2013121599378Open ↗
01/03/2012120935667Open ↗
09/27/2011120823564Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
07/17/2014121599378Open ↗
01/14/2013120935667Open ↗
02/27/2012120823564Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
05/12/2017120540110Open ↗
08/05/2013120540110Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/17/2019123763249Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
10/24/2011120823564Open ↗
▸Environmental & Asbestos53
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
08/15/2011120785766Open ↗
06/08/2011120448088Open ↗
05/26/2011120695220Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/02/2026M00691486-I1Open ↗
08/13/2026M00691470-I1Open ↗
08/13/2026M00682168-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
05/17/2019123763249Open ↗
05/10/2019123762017Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)3
06/18/2012121101477Open ↗
04/29/2013121599378Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
10/24/2011120823564Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01094170-I1Open ↗
08/13/2026M00169906-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY4
01/03/2012120935667Open ↗
01/03/2012120935667Open ↗
07/26/2011120662354Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
11/17/2011120823564Open ↗
11/15/2011120823564Open ↗
09/27/2011120823564Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
11/17/2020123763249Open ↗
10/16/2015121045519Open ↗
04/19/2013120823564Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/17/2019123763249Open ↗
10/16/2015121045519Open ↗
04/19/2013120823564Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/17/2020123763249Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/17/2020123763249Open ↗
▸Approvals, Objections & Sign-offs99
▸BISADMINISTRATIVE OBJECTIONS45
04/29/2013121599378Open ↗
06/15/2012121101477Open ↗
01/18/2012120942203Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
09/13/2017120785766Open ↗
05/26/2017120823564Open ↗
05/15/2017120823564Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
10/16/2015121045519Open ↗
05/07/2012120141195Open ↗
07/26/2011120662354Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
09/05/2026M00169903-I1Open ↗
09/02/2026M00691486-I1Open ↗
09/02/2026M00691486-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026M00682168-I1Open ↗
08/13/2026M00691470-I1Open ↗
08/13/2026M00725246-I1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
06/30/2011120742054Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS APPROVAL1
05/07/2012120141195Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT49
11/17/2020123763249Open ↗
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
Showing 3 of 49 on file for this type
▸Filing & Intake Forms69
▸BISEFILING COVER SHEET47
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
05/17/2019123763249Open ↗
Showing 3 of 47 on file for this type
▸BISADDITIONAL INFORMATION15
11/14/2012120095280Open ↗
04/25/2012120823617Open ↗
11/15/2011120823564Open ↗
Showing 3 of 15 on file for this type
▸BISeFiling Job Application Cover Sheet4
09/27/2011120823617Open ↗
09/27/2011120823564Open ↗
Showing 2 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
02/07/2020104101936Open ↗
02/03/2020104101936Open ↗
09/13/2017120785766Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/29/2020104101936Open ↗
05/10/2019123762017Open ↗
05/23/2011120659661Open ↗
Showing 3 of 5 on file for this type
▸BISPlot Diagram2
06/30/2011120742054Open ↗
Showing 1 of 2 on file for this type
▸BISPC FILING CLUSTER DETAILS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01374556-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01248313-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00682168-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01248313-I1Open ↗