Office, 20+ stories, with or without commercial
512 MADISON AVENUE
MANHATTAN · BIN 1035727
💬 Discuss this project
1982Year Built
43Stories
O4Building Class
C5-3Zoning
1,015,287 sfGross Floor Area
29Units
LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: 520 MADISON OWNERS, L.L.C. ATTN: TRACEY FRAZZETTA · 43,532 sf lot · 23.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof22p · 4 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 821p · 1 filing · 7 docs
Floor 81
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 68
Floor 67
Floor 66
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 433p · 1 filing · 5 docs
Floor 42
Floor 41Under Construction2p · 1 filing · 14 docs
Floor 406p · 5 filings · 20 docs
Floor 3913p · 8 filings · 20 docs
Floor 3813p · 8 filings · 20 docs
Floor 37Under Construction49p · 1 filing · 15 docs
Floor 36Under Construction35p · 1 filing · 15 docs
Floor 35
Floor 343p · 2 filings · 6 docs
Floor 331p · 1 filing · 3 docs
Floor 32Under Construction31p · 6 filings · 20 docs
Floor 31Under Construction18p · 4 filings · 20 docs
Floor 30Under Construction17p · 4 filings · 20 docs
Floor 29Under Construction6p · 2 filings · 20 docs
Floor 28Under Construction10p · 3 filings · 20 docs
Floor 27Under Construction3p · 2 filings · 20 docs
Floor 26Under Construction3p · 2 filings · 20 docs
Floor 25Under Construction16p · 4 filings · 17 docs
Floor 2464p · 2 filings · 20 docs
Floor 2323p · 8 filings · 20 docs
Floor 225p · 4 filings · 20 docs
Floor 2166p · 3 filings · 20 docs
Floor 20
Floor 1923p · 4 filings · 20 docs
Floor 18Under Construction3p · 3 filings · 20 docs
Floor 174p · 2 filings · 6 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 1222p · 3 filings · 19 docs
Floor 114p · 2 filings · 8 docs
Floor 10Under Construction110p · 4 filings · 20 docs
Floor 924p · 8 filings · 20 docs
Floor 836p · 4 filings · 20 docs
Floor 737p · 4 filings · 20 docs
Floor 637p · 4 filings · 20 docs
Floor 537p · 4 filings · 20 docs
Floor 426p · 6 filings · 20 docs
Floor 314p · 3 filings · 10 docs
Floor 212p · 1 filing · 20 docs
Floor 172p · 10 filings · 20 docs
MezzanineUnder Construction39p · 7 filings · 20 docs
CellarUnder Construction82p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TISHMAN SPEYER18708/30/2026
520 MADISON AVENUE5707/08/2026
COYLE CONTRACTING307/08/2026
520 MADISON OWNERS86003/22/2026
ELI ACQUISITION LLC103/22/2026
TISHMAN SPEYER PROPERTIES LP51803/22/2026
TO OWNER OF 520 MADISON A103/22/2026
OWNER OF 520 MADISON AVE103/22/2026
2023 SPRING RETRO103/22/2026
TISHMAN203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILLMAN CONSULTING16003/21/2026
A1 EXPEDITING SERVICE CORP.9603/21/2026
RIZZO GROUP4903/21/2026
MARY MCKEOWN203/21/2026
AGOUTI CONSTRUCTION CONSULTING303/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
METROPOLIS GROUP INC603/21/2026
TSOLAKI'S EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JT MAGEN & COMPANY INCGeneral Contractor6109/30/2026
CORE FOUR CONSTRUCTION INGeneral Contractor2707/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor1807/08/2026
COYLE CONTRACTING CORPGeneral Contractor1507/08/2026
OMARA ORGANIZATION INCGeneral Contractor1407/08/2026
PAR FIRE PROTECTION LLCFire Protection1007/08/2026
PAR PLUMBING CO., INCPlumbing1007/08/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor1007/08/2026
STRUCTURE TONE, LLCGeneral Contractor807/08/2026
BUILD NYC GROUP CORPGeneral Contractor807/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection608/30/2026
ASHLAND PLUMBING CORPPlumbing607/08/2026
SIRINA FIRE PROT CORPFire Protection507/08/2026
A&A PLUMBING CORPPlumbing507/10/2026
MC SUPERSTRUCTURE INCGeneral Contractor403/21/2026
LUCIANO, ANTHONYElectrical303/21/2026
STEADFAST DEVELOPMENT ANDGeneral Contractor303/21/2026
ENOBRAC PLUMBING, INCFire Protection307/08/2026
ENOBRAC PLUMBING, INCPlumbing307/08/2026
NYC FIRE SPRINKLER CORPFire Protection307/08/2026
ANTHONY LUCIANOElectrical303/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
TRISTATE PLBG SVCS CORPFire Protection207/08/2026
A.W. & S. CONSTRUCTION COGeneral Contractor209/18/2026
FOLOR INCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843708/17/2026
PROJECT TACTICAL SOLUTION58599906/30/2026
SHAHRISH SHUVO ENGINEERIN8524306/08/2026
SKYLINE ENGINEERING, PLLC2675209/24/2025
PAPER PLANE ARCHITECTURE,7155106/11/2022
AK ENGINEERING PC6781105/12/2022
WALTER T. GORMAN, P.E., P268504/22/2021
QUALITY TESTING, LLC7344109/02/2020
CODEGREEN510508/13/2020
SPECIAL INSPECTION SERVIC1200206/10/2020
Building Lifecycle
All (300)Filed (77)Permit Issued (80)Signed Off (35)Facade (FISP) (1)Violation (9)Inspection (60)Objection (8)Special Inspection (30)
09/29/2026
Permit issued — Structural
M01355353-S5-ST
09/29/2026
Permit issued — General Construction
M01355353-S1-GC
09/29/2026
Permit issued — Mechanical Systems
M01355353-S2-MS
09/17/2026
Permit issued — General Construction
M01454676-I1-GC
09/17/2026
Permit issued — Mechanical Systems
M01454676-S1-MS
08/28/2026
Signed off — Alteration
Modification/additions to existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
M01248972-S2
08/27/2026
Permit issued — Sprinklers
M01248972-S3-EW-SP
08/26/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Final
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
08/18/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
08/17/2026
Filed — Alteration
Modification/additions to existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
M01248972-P2
07/30/2026
Signed off — Alteration
Removal of existing sprinkler heads (wet) and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy under this application.
M01335854-I1
07/30/2026
Signed off — Alteration
Removal of existing sprinkler heads (wet) and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy under this application.
M01335854-S3
07/30/2026
Signed off — Alteration
Removal of existing sprinkler heads (wet) and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy under this application.
M01335854-S2
07/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2026
Permit issued — Sprinklers
M01355353-S4-EW-SP
07/27/2026
Permit issued — Plumbing
M01355353-S3-PL
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2026
Signed off — Alteration
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
M01286300-S2
07/22/2026
Signed off — Alteration
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
M01224847-S2
07/21/2026
Signed off — Alteration
REPAIRS TO EXISTING SIDEWALK GRANITE PAVERS IN KIND AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01249945-I1
07/21/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
07/21/2026
Special inspection requirement — Final
JOHN MCMONAGLE
07/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2026
Signed off — Alteration
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
M01286300-I1
07/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2026
Permit issued — Plumbing
M01379557-S2-PL
07/07/2026
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
06/30/2026
Filed — Alteration
Replacement of the retail entry doors at the storefront and demising a Cellar storage room. No change in use, egress or occupancy under this application. Refer to comments for additional information.
M01379557-S3
06/30/2026
Signed off — Alteration
Removal of existing sprinkler heads (wet) and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy under this application.
M01335854-S1
06/30/2026
Filed — Alteration
Replacement of the retail entry doors at the storefront and demising a Cellar storage room. No change in use, egress or occupancy under this application. Refer to comments for additional information.
M01379557-S2
06/29/2026
Permit issued — General Construction
M01379557-I1-GC
06/29/2026
Permit issued — Mechanical Systems
M01379557-S1-MS
06/24/2026
Filed — Alteration
Replacement of the retail entry doors at the storefront and demising a Cellar storage room. No change in use, egress or occupancy under this application. Refer to comments for additional information.
M01379557-S1
06/23/2026
Signed off — Alteration
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
M01286300-S1
06/23/2026
Filed — Alteration
Replacement of the retail entry doors at the storefront and demising a Cellar storage room. No change in use, egress or occupancy under this application. Refer to comments for additional information.
M01379557-I1
06/17/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/15/2026
Permit issued — Plumbing
M01407167-S3-PL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC09/29/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC09/29/2026
DOB NOWStructuralPermit IssuedJT MAGEN & COMPANY INC09/29/2026
DOB NOWMechanical SystemsPermit IssuedA.W. & S. CONSTRUCTION CO09/17/2026
DOB NOWGeneral ConstructionPermit IssuedA.W. & S. CONSTRUCTION CO09/17/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP08/27/2026
DOB NOWSprinklersPermit IssuedKG SPRINKLER CORP07/27/2026
DOB NOWPlumbingPermit IssuedCONNELLY & SONS PLUMBING07/27/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP07/09/2026
DOB NOWMechanical SystemsPermit IssuedBUILD NYC GROUP CORP06/29/2026
DOB NOWGeneral ConstructionPermit IssuedBUILD NYC GROUP CORP06/29/2026
DOB NOWStructuralPermit IssuedJT MAGEN & COMPANY INC06/15/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC06/15/2026
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC06/15/2026
DOB NOWPlumbingPermit IssuedASHLAND PLUMBING CORP06/15/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP06/12/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC05/28/2026
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC05/28/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC05/27/2026
DOB NOWStructuralPermit IssuedJT MAGEN & COMPANY INC05/27/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP05/22/2026
DOB NOWMechanical SystemsPermit IssuedCOYLE CONTRACTING CORP05/11/2026
DOB NOWGeneral ConstructionPermit IssuedCOYLE CONTRACTING CORP05/11/2026
DOB NOWGeneral ConstructionPermit IssuedICON INTERIORS INC04/28/2026
DOB NOWPlumbingSigned-offREEM PLUMBING & HEATING C03/31/2026
DOB NOWSprinklersPermit IssuedREEM PLBG & HTG CORP02/10/2026
DOB NOWPlumbingSigned-offREEM PLUMBING & HEATING C02/10/2026
DOB NOWGeneral ConstructionSigned-offCOYLE CONTRACTING CORP01/27/2026
DOB NOWSprinklersSigned-offARIANA CONTRACTING INC01/27/2026
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC01/26/2026
DOB NOWGeneral ConstructionSigned-offCOYLE CONTRACTING CORP01/26/2026
DOB NOWPlumbingPermit IssuedABCO-PEERLESS SPRKLR CORP01/26/2026
DOB NOWMechanical SystemsSigned-offCOYLE CONTRACTING CORP01/26/2026
DOB NOWPlumbingPermit IssuedASHLAND PLUMBING CORP01/07/2026
DOB NOWMechanical SystemsSigned-offCOYLE CONTRACTING CORP10/30/2025
DOB NOWMechanical SystemsSigned-offJT MAGEN & COMPANY INC10/03/2025
DOB NOWStructuralSigned-offJT MAGEN & COMPANY INC10/03/2025
DOB NOWGeneral ConstructionSigned-offJT MAGEN & COMPANY INC10/03/2025
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC10/01/2025
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC09/29/2025
+ 60 more permits on file
5 projects · most recent 08/17/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Signed-offJT MAGEN & COMPANY INCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Above Air HKH-028D1-4-00ERH-EC-DC-SF0-HC 8 tons · Crac Unit ×1
HKW-011S1-4-00ERH-EC-FE-SF0-HA 3 tons · Crac Unit ×1
HKW-028D1-4-00ERH-EC-FE-SF0-HC 8 tons · Crac Unit ×1
Heat / Cool
Climatemaster SYB024AEBM0S0VS 2 tons · Wshp ×8
SYP024AEBM0S0VS 18,200 tons · Wshp ×6
SYL024AEBM0S0VS 18,200 BTU · Wshp ×2
SEB060ALBM0R0VS 5 tons · Wshp ×1
SYR024AEBM0S0VS 2 tons · Wshp ×1
SYR048ALBM0S0VS 4 tons · Wshp ×1
06/30/2026Permit IssuedBUILD NYC GROUP CORPAir Conditioning Systems
Cooling
Climatemaster SB-120 119,400 BTU · Wshp ×2
SB-072 70,700 BTU · Wshp ×1
12/09/2025Permit IssuedBUILD NYC GROUP CORPAir Conditioning Systems
Cooling
Climatemaster SC-024 11,600 BTU · Wshp ×2
06/13/2025Permit IssuedFOLOR INCAir Conditioning Systems
Cooling
Florida Heat Pump CL060 58,900 BTU · Wshp ×4
CL042 41,900 BTU · Wshp ×2
07/02/2021Permit IssuedOMARA ORGANIZATION INCAir Conditioning Systems
Cooling
Climatemaster TY-036 33,700 BTU · Condensing Unit ×5
12 projects · most recent 06/30/2026
Sprinkler System
FiledStatusContractorScope
06/30/2026——Sprinkler System
06/08/2026Permit IssuedABCO-PEERLESS SPRKLR CORPSprinkler System
03/23/2026Permit IssuedKG SPRINKLER CORPSprinkler System
03/19/2026Permit IssuedBEDROCK MECHANICAL INC464 heads
01/20/2026Signed-offARIANA CONTRACTING INCSprinkler System
12/09/2025Signed-offFULL CAPACITY FIRE CORPSprinkler System
11/03/2025Permit IssuedREEM PLBG & HTG CORPSprinkler System
09/24/2025Permit IssuedABCO-PEERLESS SPRKLR CORP226 heads
09/10/2025Permit IssuedPAR FIRE PROTECTION LLC24 heads
06/13/2025Permit IssuedCMP PIPING INC60 heads
08/24/2021Permit IssuedPAR FIRE PROTECTION LLC3 heads
07/02/2021Signed-offTRISTATE PLBG SVCS CORP292 heads
15 projects · most recent 08/17/2026
Water/Sanitary
FiledStatusContractorScope
08/17/2026Signed-offCONNELLY & SONS PLUMBINGWater/Sanitary
06/30/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
06/08/2026Permit IssuedASHLAND PLUMBING CORPWater/Sanitary
03/23/2026Permit IssuedCONNELLY & SONS PLUMBINGWater/Sanitary
03/19/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
01/20/2026Signed-offCOPPER PLUMBING INCWater/Sanitary
12/09/2025Permit IssuedA&A PLUMBING CORPWater/Sanitary
11/03/2025Signed-offREEM PLUMBING & HEATING CWater/Sanitary
09/24/2025Permit IssuedASHLAND PLUMBING CORPWater/Sanitary
09/10/2025———
08/19/2025Signed-offA&A PLUMBING CORPWater/Sanitary
06/13/2025Permit IssuedCM PLUMBING INCWater/Sanitary
07/02/2021Signed-offTRISTATE PLBG SVCS CORPWater/Sanitary
02/26/2020Signed-offPAR PLUMBING CO., INCWater/Sanitary
07/25/2019Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
25 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
07/02/2026Permit IssuedFOREST ELECTRIC CORP.General Wiring
06/12/2026Permit IssuedENNELL GRP ELECTRIC CORPGeneral Wiring
06/11/2026Permit IssuedTITAN ELEC'L & ELEV CONTRGeneral Wiring
06/05/2026Permit IssuedD&D ELECTL CONST CO INCGeneral Wiring
05/29/2026CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
05/05/2026CompleteFOREST ELECTRIC CORP.General Wiring
04/30/2026CompleteFOREST ELECTRIC CORP.General Wiring
02/15/2026Permit IssuedSTRONG ISLAND ELEC. LLC—
02/10/2026Permit IssuedACCURATE ELEC'L CONTR'S CGeneral Wiring
01/26/2026Permit IssuedOFF SHORE ELECTRIC CORP—
12/08/2025CompleteTROON ELECTRIC OF NEW YORGeneral Wiring
11/07/2025Permit IssuedCRANA ELECTRIC, INCGeneral Wiring
08/19/2025Permit IssuedFOREST ELECTRIC CORP.General Wiring
07/18/2025Permit IssuedFOREST ELECTRIC CORP.General Wiring
5 projects · most recent 08/17/2026
Steel Concrete
FiledStatusContractorScope
08/17/2026Permit IssuedABCO-PEERLESS SPRKLR CORPSteel, Concrete
06/08/2026Permit IssuedJT MAGEN & COMPANY INCSteel
03/23/2026Permit IssuedJT MAGEN & COMPANY INCSteel
12/09/2025Signed-offFULL CAPACITY FIRE CORP1 scope_items
04/23/2025Permit IssuedJT MAGEN & COMPANY INCSteel
1 project · most recent 11/02/2023
Fence Sidewalk Shed
FiledStatusContractorScope
11/02/2023Permit IssuedMC SUPERSTRUCTURE INCFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 124
DateTypeResultReport
08/26/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/07/2026Fail-Final SP - Up to 3 Requested FloorsFailView ↗
06/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2026Pass-Final PL - UndergroundPassView ↗
05/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 124.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/18/2026Lighting controlsJOHN MCMONAGLEenergy_progress
08/18/2026Mechanical SystemsJOHN MCMONAGLEspecial
08/18/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
08/18/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
08/18/2026Maintenance informationJOHN MCMONAGLEenergy_progress
08/18/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/18/2026Post-installed AnchorsJOHN MCMONAGLEspecial
08/18/2026FinalJOHN MCMONAGLEprogress
08/18/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/18/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
07/21/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
07/21/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/21/2026Maintenance informationJOHN MCMONAGLEenergy_progress
07/21/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/21/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
07/21/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
07/21/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
07/21/2026Post-installed AnchorsJOHN MCMONAGLEspecial
07/21/2026FinalJOHN MCMONAGLEprogress
07/21/2026Mechanical SystemsJOHN MCMONAGLEspecial
07/21/2026Lighting controlsJOHN MCMONAGLEenergy_progress
06/03/2026Structural Steel - High Strength BoltingShahrish Shuvospecial
06/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/03/2026Structural Steel - WeldingShahrish Shuvospecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
JefferiesOfficeFloors 3, 5–10, 12, 17
Project M01089161 Alteration · Permit Entire · 09/10/2025
Project M01089203 Alteration · Permit Entire · 09/10/2025
Project M01089144 Alteration · Permit Entire · 09/09/2025
Project M01208487 Alteration · Permit Entire · 04/23/2025
Project M01143155 Alteration · Permit Entire · 11/25/2024
Project M01059093 Alteration · LOC Issued · 06/13/2024
Project M01059105 Alteration · LOC Issued · 06/13/2024
Project M01058426 Alteration · LOC Issued · 06/12/2024
Project M01037218 Alteration · LOC Issued · 04/22/2024
Project M01032007 Alteration · LOC Issued · 04/18/2024
Project M00511372 Alteration · LOC Issued · 05/04/2021
Project M00511408 Alteration · LOC Issued · 05/04/2021
Renaissance TechnologiesOfficeFloors 30–32
Project M01248972 Alteration · Permit Entire · 08/28/2025
San Pietro RestaurantRestaurant / Food ServiceCellar, Floor 1
Project M01181704 Alteration · Permit Entire · 06/13/2025
AEA InvestorsOfficeFloors 38–40
Project M01016650 Alteration · LOC Issued · 04/09/2024
Project M01016701 Alteration · LOC Issued · 04/09/2024
Project M00405614 Alteration · LOC Issued · 11/02/2020
Project M00405678 Alteration · LOC Issued · 11/02/2020
Project M00405693 Alteration · LOC Issued · 11/02/2020
Project M00392545 Alteration · LOC Issued · 10/01/2020
Project M00392529 Alteration · LOC Issued · 09/30/2020
Project M00392541 Alteration · LOC Issued · 09/30/2020
Element Capital ManagementOfficeFloor 43
Project M00741443 Alteration · LOC Issued · 06/03/2022
Kirkoswald Capital PartnersOfficeFloor 25
Project M00614121 Alteration · LOC Issued · 10/22/2021
Project M00614138 Alteration · LOC Issued · 10/22/2021
Davidson KempnerOfficeFloors 30–32
Project M00590488 Alteration · LOC Issued · 09/27/2021
Project M00590498 Alteration · LOC Issued · 09/27/2021
Project M00591174 Alteration · LOC Issued · 09/27/2021
Project M00296840 Alteration · LOC Issued · 02/03/2020
Project M00296857 Alteration · LOC Issued · 02/03/2020
SephoraRetailFloor 1
Project M00390354 Alteration · LOC Issued · 09/02/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 8,792 on file (BIS + DOB NOW)
▸Plans & Drawings220
▸DOB NOWPlans/Sketch162
09/03/2026M00496248-I1Request digital key ↗
09/03/2026M00511331-I1Request digital key ↗
09/03/2026M00511331-P1Request digital key ↗
Showing 3 of 162 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems18
09/05/2026M00188598-I1Request digital key ↗
09/05/2026M00194434-I1Request digital key ↗
09/05/2026M00216695-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler18
09/05/2026M00188668-I1Request digital key ↗
09/05/2026M00195176-I1Request digital key ↗
09/05/2026M00216714-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing16
09/05/2026M00188739-I1Request digital key ↗
09/05/2026M00199311-I1Request digital key ↗
09/05/2026M00240040-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00451648-I1Request digital key ↗
09/03/2026M00453490-P1Request digital key ↗
09/03/2026M00453490-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00240091-I1Request digital key ↗
▸Applications & Permits1,506
▸BISPLAN / WORK APPROVAL APPLICATION933
02/24/2026103768969Open ↗
02/24/2026102836736Open ↗
02/24/2026102743131Open ↗
Showing 3 of 933 on file for this type
▸BISWORK PERMIT APPLICATION560
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 560 on file for this type
▸BISPLACE OF ASSEMBLY8
12/29/2025104506642Open ↗
12/05/2025104506642Open ↗
10/01/2025104506642Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWState DEC Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications2,463
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,223
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1,223 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST267
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 267 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT258
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 258 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature220
09/05/2026M00188668-I1Open ↗
09/05/2026M00188598-I1Open ↗
09/05/2026M00194434-I1Open ↗
Showing 3 of 220 on file for this type
▸DOB NOWProgress Inspector Seal & Signature185
09/25/2026M00511331-I1Open ↗
09/25/2026M00511331-I1Open ↗
09/25/2026M00511331-I1Open ↗
Showing 3 of 185 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature155
09/27/2026M00886430-S2Open ↗
09/27/2026M00886430-A2Open ↗
09/25/2026M00511331-I1Open ↗
Showing 3 of 155 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM123
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 123 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISProfessional and Owner Certification (POC3)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPC FULL REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Trade Schedules & Equipment885
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE215
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 215 on file for this type
▸BISSELF-CERT PLUMBING NOTICE214
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 214 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA129
06/07/2023123155851Open ↗
Showing 1 of 129 on file for this type
▸BISEQUIPMENT USE PERMITS113
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 113 on file for this type
▸BISSCHEDULE B - PLUMBING107
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 107 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8540
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISSIGN HANGER CERTIFICATE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Safety & Tenant Protection12
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos664
▸BISASBESTOS: CERTIFICATION (DEP ACP5)304
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 304 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report214
09/05/2026M00188668-I1Open ↗
09/05/2026M00188598-I1Open ↗
09/05/2026M00194434-I1Open ↗
Showing 3 of 214 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'134
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 134 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance432
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS269
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 269 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS83
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 83 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.12
09/04/2026M00390354-I1Open ↗
09/02/2026M00714521-I1Open ↗
Showing 2 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)8
08/01/2024140974275Open ↗
04/17/2024122798785Open ↗
01/08/2024123533159Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS5
08/01/2024140974275Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports77
▸BISTECHNICAL REPORT: RESPONSIBILITY60
12/06/2022140991283Open ↗
Showing 1 of 60 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
08/01/2024140974275Open ↗
Showing 1 of 3 on file for this type
▸Approvals, Objections & Sign-offs624
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST410
03/02/2026122858737Open ↗
03/02/2026123762730Open ↗
08/01/2025122798785Open ↗
Showing 3 of 410 on file for this type
▸BISADMINISTRATIVE OBJECTIONS146
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 146 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISFINAL7
05/22/2025140974275Open ↗
01/12/2023123824200Open ↗
01/12/2023123720385Open ↗
Showing 3 of 7 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Cost, Insurance & Ownership954
▸BISCOST AFFIDAVIT913
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 913 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW341
07/30/2025122798785Open ↗
07/30/2025123533159Open ↗
07/30/2025123824200Open ↗
Showing 3 of 41 on file for this type
▸Filing & Intake Forms887
▸BISEFILING COVER SHEET480
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 480 on file for this type
▸BISBOROUGH INTAKE FORM221
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 221 on file for this type
▸BISADDITIONAL INFORMATION171
02/11/2026121736167Open ↗
01/07/2026104506642Open ↗
11/20/2025104506642Open ↗
Showing 3 of 171 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION16
02/24/2026103768969Open ↗
02/24/2026102836736Open ↗
02/24/2026102743131Open ↗
Showing 3 of 16 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type