Hospital, sanitarium, mental institution
New York Presbyterian- Brooklyn Methodist Hospital
515 6TH STREET · Park Slope · BIN 3414197
💬 Discuss this project
2017Year Built
7Stories
I1Building Class
R6Zoning
427,208 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: Methodist Hospital of Brooklyn · 56,395 sf lot · 7.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBrooklyn Methodist Hospital4p · 2 filings · 14 docs
BulkheadBrooklyn Methodist HospitalUnder Construction2p · 2 filings · 19 docs
Floor 5NewYork-Presbyterian2p · 1 filing · 2 docs
Floor 4Brooklyn Methodist Hospital, NewYork-PresbyterianUnder Construction27p · 3 filings · 16 docs
Floor 3Brooklyn Methodist Hospital, NewYork-Presbyterian98p · 7 filings · 14 docs
Floor 2NewYork-Presbyterian4p · 3 filings · 5 docs
Floor 1Brooklyn Methodist Hospital, NewYork-Presbyterian26p · 5 filings · 14 docs
CellarNewYork-Presbyterian6p · 1 filing · 8 docs
Sub-CellarNewYork-Presbyterian, Brooklyn Methodist Hospital9p · 2 filings · 10 docs
BasementBrooklyn Methodist Hospital2p · 2 filings · 17 docs
Site & exteriorBrooklyn Methodist Hospital11p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York Methodist Hospital14803/22/2026
New York Presbyterian5110/04/2026
New York Presbyterian Brooklyn Meth1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar603/21/2026
Premier Expediting Services103/21/2026
Municipal Expediting803/21/2026
Metropolis Group1403/21/2026
Outsource Consultants1803/21/2026
Sato Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alliance PlumbingPlumbing707/08/2026
Hunter Roberts ConstructionGeneral Contractor407/08/2026
Consigli Construction CoGeneral Contractor307/08/2026
Z-Car-DSign hanger307/08/2026
Langan Engineering Env Surey LCP ArchitectsGeneral Contractor303/22/2026
Spring ScaffoldingScaffold309/12/2026
Sirina Fire ProtectionFire Protection307/08/2026
L.F. Driscoll CompanyGeneral Contractor208/26/2026
Cauldwell Wingate CoGeneral Contractor207/08/2026
Tuxedo Electrical ContractingElectrical203/22/2026
Long & Delosa Construction GroupGeneral Contractor203/21/2026
Sirina Fire ProtectionPlumbing203/22/2026
Empire General ContractingGeneral Contractor107/08/2026
DNA ContractingGeneral Contractor104/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control12901607/08/2026
Soni Engineering Consulting9819103/19/2026
Alan Margolin & Associates423402/27/2026
Kendall Engineering4154112/02/2019
Building Lifecycle
All (249)Filed (29)Permit Issued (30)Signed Off (21)Violation (60)Inspection (17)Objection (62)Special Inspection (30)
09/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01366834-I1
09/28/2026
Signed off — Alteration
B01356612-I1
09/10/2026
Permit issued — Sidewalk Shed
B01366834-I1-SH
07/14/2026
Permit issued — General Construction
B01412732-I1-GC
07/14/2026
Permit issued — Mechanical Systems
B01412732-S1-MS
07/08/2026
Filed — Alteration
INTERIOR RENOVATION OF 4TH FLOOR EXAM ROOM AS PER PLANS. NO CHANGE TO USE, EGRESS OROCCUPANCY.
B01412732-S1
07/08/2026
Filed — Alteration
INTERIOR RENOVATION OF 4TH FLOOR EXAM ROOM AS PER PLANS. NO CHANGE TO USE, EGRESS OROCCUPANCY.
B01412732-I1
06/17/2026
Permit issued — Sidewalk Shed
B01366834-I1-SH
06/10/2026
Special inspection requirement — Final
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Maintenance information
GEORGE ANDERSEN
06/05/2026
Special inspection requirement — Mechanical Systems
GEORGE ANDERSEN
06/05/2026
Special inspection requirement — Final
GEORGE ANDERSEN
04/09/2026
Permit issued — General Construction
B01356612-I1-GC
03/23/2026
Permit issued — Suspended Scaffold
B01364238-I1-SC
03/23/2026
Objection resolved — Addressed
03/20/2026
Permit issued — Sidewalk Shed
B01366834-I1-SH
03/19/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01364238-I1
03/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01366834-I1
03/13/2026
Objection raised — Structural
03/10/2026
Signed off — Alteration
BMH Pumps: Modifications of interior partitions and finishes to accommodate alterations to the storm pump room as per plans. no change to use, egress or occupancy.
B01231625-S1
02/27/2026
Filed — Alteration
B01356612-I1
02/27/2026
Signed off — Alteration
BMH Pumps: Modifications of interior partitions and finishes to accommodate alterations to the storm pump room as per plans. no change to use, egress or occupancy.
B01231625-S2
02/25/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
02/25/2026
Special inspection requirement — Post-installed Anchors
nayan soni
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
nayan soni
02/24/2026
Signed off — Alteration
BMH Pumps: Modifications of interior partitions and finishes to accommodate alterations to the storm pump room as per plans. no change to use, egress or occupancy.
B01231625-I1
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Pamela Jerome
02/19/2026
Special inspection requirement — Air barrier - visual inspection
Pamela Jerome
02/19/2026
Special inspection requirement — Masonry
Young Suh
02/19/2026
Special inspection requirement — Final
Pamela Jerome
02/16/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/03/2026
Violation issued (FDNY_ORDER, closed)
12/12/2025
Signed off — Alteration
B01128628-I1
11/17/2025
Signed off — Alteration
HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH XRAY REPLACEMENT PER PLANS.
B01184449-S3
11/17/2025
Signed off — Alteration
HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH XRAY REPLACEMENT PER PLANS.
B01184449-S1
11/12/2025
Permit issued — Plumbing
B01231625-S1-PL
11/05/2025
Special inspection requirement — Maintenance information
GEORGE ANDERSEN
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE ANDERSEN
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
11/05/2025
Special inspection requirement — Mechanical Systems
GEORGE ANDERSEN
11/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE ANDERSEN
11/05/2025
Special inspection requirement — Final
GEORGE ANDERSEN
11/03/2025
Filed — Alteration
HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH XRAY REPLACEMENT PER PLANS.
B01184449-P2
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
10/23/2025
Special inspection requirement — Final
GEORGE ANDERSEN
10/23/2025
Special inspection requirement — Maintenance information
GEORGE ANDERSEN
10/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE ANDERSEN
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
10/23/2025
Special inspection requirement — Mechanical Systems
GEORGE ANDERSEN
10/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE ANDERSEN
10/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/10/2025
Signed off — Alteration
HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH XRAY REPLACEMENT PER PLANS.
B01184449-S2
09/04/2025
Objection resolved — Addressed
08/22/2025
Signed off — Alteration
HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH XRAY REPLACEMENT PER PLANS.
B01184449-I1
Latest 60 of 249 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSpring Scaffolding09/10/2026
DOB NOWGeneral ConstructionPermit IssuedL.F. Driscoll Company07/14/2026
DOB NOWMechanical SystemsPermit IssuedL.F. Driscoll Company07/14/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/17/2026
DOB NOWGeneral ConstructionSigned-offPaul Charlton04/09/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA Contracting03/23/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/20/2026
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/12/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe07/17/2025
DOB NOWMechanical SystemsSigned-offCauldwell Wingate Co07/16/2025
DOB NOWStructuralSigned-offConsigli Construction Co06/27/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co06/25/2025
DOB NOWGeneral ConstructionSigned-offEmpire General Contracting05/02/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe04/15/2025
DOB NOWGeneral ConstructionSigned-offCauldwell Wingate Co04/14/2025
DOB NOWSprinklersSigned-offSirina Fire Protection04/14/2025
DOB NOWSuspended ScaffoldSigned-offSato Construction Co10/11/2024
DOB NOWSprinklersSigned-offSirina Fire Protection09/27/2024
DOB NOWStructuralSigned-offHunter Roberts Construction08/07/2024
DOB NOWGeneral ConstructionSigned-offLong Delosa Construction Group04/09/2024
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/30/2023
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction10/18/2023
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction10/17/2023
DOB NOWSprinklersSigned-offSirina Fire Protection09/21/2023
DOB NOWSignSigned-offZ-Car-D01/04/2021
DOB NOWSignSigned-offZ-Car-D01/04/2021
DOB NOWSignSigned-offZ-Car-D11/18/2020
DOB NOWBoiler EquipmentPermit IssuedC C Controlled Combustion03/10/2020
DOB NOWBoiler EquipmentPermit IssuedC C Controlled Combustion12/31/2019
DOB NOWBoiler EquipmentPermit IssuedC C Controlled Combustion12/13/2019
BISOTISSUEDConsigli Construction Co07/18/2025
BISPLISSUEDCardoza Plumbing02/06/2023
BIS—ISSUEDLendlease (US) Construction12/23/2021
BISEQISSUEDLendlease (US) Construction12/14/2021
BIS—ISSUEDLendlease (US) Construction09/30/2021
BISEQISSUEDSafway Atlantic04/05/2021
BISPLISSUEDCardoza Plumbing01/04/2021
BISMHISSUEDLendlease (US) Construction10/01/2020
BIS—ISSUEDLendlease (US) Construction10/01/2020
BIS—ISSUEDLendlease (US) Construction08/17/2020
+ 40 more permits on file
12 projects · most recent 07/17/2026
General Wiring
FiledStatusContractorScope
07/17/2026Permit IssuedAllan Briteway ElectricalGeneral Wiring
03/17/2026Permit IssuedTop Shelf Electric—
07/10/2025CompleteForest ElectricGeneral Wiring
04/30/2025CompleteAllan Briteway ElectricalGeneral Wiring
04/11/2024CompleteAnco Electl ContctngGeneral Wiring
11/15/2023CompleteE-J Electric Installation CoGeneral Wiring
08/22/2023CancelledLowy & DonnathGeneral Wiring
07/30/2019CompleteTuxedo Electrical Contracting—
03/01/2019CompleteTuxedo Electrical Contracting—
02/21/2019CompleteTuxedo Electrical Contracting—
08/28/2018CompleteTuxedo Electrical Contracting—
08/28/2018CompleteTuxedo Electrical Contracting—
1 project · most recent 03/17/2026
Sidewalk Shed
FiledStatusContractorScope
03/17/2026Signed-offSpring ScaffoldingSidewalk Shed
1 project · most recent 03/19/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/19/2026Permit IssuedDNA ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
02/16/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
08/19/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
08/19/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Medical Gas - MG - PL - FinishCertifiedView ↗
08/23/2024Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
08/23/2024Certified Medical Gas - MG - PL - TestCertifiedView ↗
08/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
06/10/2026Duct leakage testing, insulation and designGEORGE ANDERSENenergy_progress
06/10/2026Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
06/10/2026Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
06/10/2026FinalGEORGE ANDERSENprogress
06/10/2026Maintenance informationGEORGE ANDERSENenergy_progress
06/05/2026Mechanical SystemsGEORGE ANDERSENspecial
06/05/2026FinalGEORGE ANDERSENprogress
02/25/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
02/25/2026Post-installed Anchorsnayan sonispecial
02/25/2026Structural Stability – Alterations of existing buildingsnayan sonispecial
02/19/2026Air barrier - visual inspectionPamela Jeromeenergy_progress
02/19/2026FinalPamela Jeromeprogress
02/19/2026Energy Code Compliance InspectionsPamela Jeromeprogress
02/19/2026MasonryYoung Suhspecial
11/05/2025Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
11/05/2025HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
11/05/2025Maintenance informationGEORGE ANDERSENenergy_progress
11/05/2025FinalGEORGE ANDERSENprogress
11/05/2025Energy Code Compliance InspectionsGEORGE ANDERSENprogress
11/05/2025HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
11/05/2025Mechanical SystemsGEORGE ANDERSENspecial
10/23/2025Energy Code Compliance InspectionsGEORGE ANDERSENprogress
10/23/2025Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
10/23/2025HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
10/23/2025HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
Latest 25 of 76.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn Methodist HospitalMedical / HealthcareSub-cellar, Floors 1, 3, 4, Roof
Project B01412732 Alteration · Permit Entire · 07/08/2026
Project B01364238 Alteration · Permit Entire · 03/19/2026
Project B01366834 Alteration · LOC Issued · 03/17/2026
Project B01356612 Alteration · LOC Issued · 02/27/2026
Project B01184449 Alteration · LOC Issued · 02/27/2025
Project B01120772 Alteration · LOC Issued · 10/02/2024
Project B01007829 Alteration · LOC Issued · 02/22/2024
Project B00975655 Alteration · LOC Issued · 01/04/2024
Project B00904197 Alteration · LOC Issued · 08/17/2023
Project B00904202 Alteration · LOC Issued · 08/17/2023
Project B00904182 Alteration · LOC Issued · 08/15/2023
Project B00273893 Alteration · LOC Issued · 12/02/2019
NewYork-PresbyterianMedical / HealthcareSub-cellar, Cellar, Floors 1–5
Project B01231625 Alteration · LOC Issued · 05/29/2025
Project B01128628 Alteration · LOC Issued · 11/12/2024
Project B00904192 Alteration · LOC Issued · 08/24/2023
Project B00442521 Alteration · LOC Issued · 12/22/2020
Project B00442529 Alteration · LOC Issued · 12/22/2020
Project B00422796 Alteration · LOC Issued · 11/17/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,324 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch26
09/03/2026B01364238-I1Request digital key ↗
09/03/2026B01364238-P1Request digital key ↗
08/27/2026B00904182-P2Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/02/2026B00422796-I1Request digital key ↗
09/02/2026B00442529-I1Request digital key ↗
09/02/2026B00442521-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00273893-I1Request digital key ↗
▸Applications & Permits245
▸BISPLAN / WORK APPROVAL APPLICATION144
04/09/2025340916879Open ↗
03/27/2025340245684Open ↗
07/12/2024320576952Open ↗
Showing 3 of 144 on file for this type
▸BISWORK PERMIT APPLICATION96
07/18/2025340916879Open ↗
02/09/2023320576952Open ↗
01/03/2022320576952Open ↗
Showing 3 of 96 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
02/21/2025320576952Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications274
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION101
04/22/2022340520396Open ↗
03/26/2021340405671Open ↗
03/26/2021340405671Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWProgress Inspector Seal & Signature45
09/15/2026B01007829-I1Open ↗
09/01/2026B00904192-I1Open ↗
09/01/2026B00904192-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/03/2026B01364238-P1Open ↗
09/03/2026B01364238-I1Open ↗
09/02/2026B00422796-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT28
04/09/2025340916879Open ↗
Showing 1 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026B01184449-S2Open ↗
09/15/2026B01007829-I1Open ↗
09/15/2026B01007829-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
04/09/2025340916879Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
04/09/2025340916879Open ↗
Showing 1 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment55
▸BISSCHEDULE B - PLUMBING13
05/15/2023340405671Open ↗
02/01/2021340405671Open ↗
12/08/2020340405671Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS10
11/22/2021320576952Open ↗
01/12/2021320576952Open ↗
01/12/2021320576952Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
06/22/2023321033608Open ↗
03/29/2023321133778Open ↗
01/04/2023321526372Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/12/2021320576952Open ↗
01/12/2021320576952Open ↗
01/12/2021320576952Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRIC CUT-OFF3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISGAS CUT-OFF3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSEWER CUT-OFF3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISWATER CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/21/2025320576952Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection48
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSTREET TREE CHECKLIST6
03/08/2024340245684Open ↗
09/28/2021340245684Open ↗
Showing 2 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREE SIGNOFF3
07/14/2025340245684Open ↗
07/14/2025340245684Open ↗
02/21/2025320576952Open ↗
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISRODENT CONTROL3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY17
12/16/2025340916879Open ↗
12/03/2025340916879Open ↗
Showing 2 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/01/2021321797560Open ↗
Showing 1 of 4 on file for this type
▸Inspections & Test Reports86
▸BISTECHNICAL REPORT: RESPONSIBILITY62
12/03/2025340916879Open ↗
04/09/2025340916879Open ↗
04/26/2022321305048Open ↗
Showing 3 of 62 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
05/04/2022340520396Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE2
04/12/2022340520396Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs227
▸BISLETTERS - SUPPORTING DOCUMENTATION116
12/17/2025340916879Open ↗
02/15/2024340245684Open ↗
04/22/2022340520396Open ↗
Showing 3 of 116 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST44
12/17/2025340916879Open ↗
11/17/2023340405671Open ↗
06/28/2023321033608Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
09/03/2026B01364238-P1Open ↗
08/27/2026B00904182-P2Open ↗
08/22/2026B01184449-P1Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE23
07/12/2024320576952Open ↗
06/26/2024320576952Open ↗
09/28/2023320576952Open ↗
Showing 3 of 23 on file for this type
▸BISSUPERSEDING LETTER7
01/03/2022320576952Open ↗
12/16/2021320576952Open ↗
Showing 2 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL5
04/26/2022321305048Open ↗
03/25/2022340610404Open ↗
03/16/2022321635272Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership74
▸BISCOST AFFIDAVIT32
04/09/2025340916879Open ↗
04/18/2023321133778Open ↗
06/01/2021321797560Open ↗
Showing 3 of 32 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE21
01/03/2022320576952Open ↗
12/16/2021320576952Open ↗
Showing 2 of 21 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)14
01/03/2022320576952Open ↗
Showing 1 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
12/15/2025340916879Open ↗
10/24/2023340405671Open ↗
06/08/2023321033608Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms140
▸BISEFILING COVER SHEET61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸BISADDITIONAL INFORMATION50
02/25/2026320576952Open ↗
04/08/2025340245684Open ↗
03/08/2024340245684Open ↗
Showing 3 of 50 on file for this type
▸BISBOROUGH INTAKE FORM21
02/09/2023320576952Open ↗
01/03/2022320576952Open ↗
03/26/2021340405671Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
04/09/2025340916879Open ↗
Showing 1 of 8 on file for this type
▸Other Documents53
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION25
05/04/2021321445566Open ↗
Showing 1 of 25 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSupporting Document: Fee Exempt4
05/15/2023340405671Open ↗
07/22/2021321470813Open ↗
07/22/2021321470813Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
09/03/2026B01364238-P1Open ↗
08/13/2026B01364238-I1Open ↗
▸DOB NOWCalculations2
09/03/2026B01364238-P1Open ↗
08/13/2026B01364238-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01120772-I1Open ↗