Modification of existing Verizon site on roof. Installation of 2 antennas, 1 platform with dunnage, and related conduit routage along roof. Replacement of 4 antennas and 4 RRHs. Relocation of 2 GPS units.
PROVIDE SUPPLEMENTAL AC UNIT IN THE FIRST FLOOR SWITCHROOM AND ASSOCIATED DRYCOOLER ON THE ROOF AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GC work related to the installation of a supplemental AC unit on 1st FL, concrete curb around the unit with a leak detector, new 8 fan quiet line drycooler on the roof & glycol pipe+ conduits running thru interior & down to the new AC unit per plans.
On file for this project
2 documents · 1 drawing sheet
▾Design Consultants (Architect / Engineer of Record)