← Back
Telephone utility
5180 AMBOY ROAD
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5082255
💬 Discuss this project
0Year Built
—Stories
U4Building Class
R3XZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Telephone utility · Owner of record: VERIZON NEW YORK INC · 46,637 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneralOther
Roof14p · 3 filings · 20 docs
Floor 52p · 1 filing · 3 docs
Floor 42p · 1 filing · 3 docs
Floor 32p · 1 filing · 3 docs
Floor 22p · 1 filing · 3 docs
Floor 112p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON1707/08/2026
VERIZON WIRELESS707/08/2026
BELL ATLANTIC RM 802103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APT ENGINEERING206/11/2025
MOHAMMAD AHEAD, PE104/20/2022
WFC ARCHITECTS110/04/2021
JACOBSEN & HORAN ENGINEERING, P.C.109/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
SOL BUILDING CONSULTING SERVICES103/21/2026
JAM CONSULTANTS, INC.203/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor307/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor207/08/2026
SIGNSTAR NYCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544210/04/2021
Building Lifecycle
All (43)Filed (5)Permit Issued (5)Signed Off (3)Violation (8)Objection (12)Special Inspection (10)
08/01/2025
Permit issued — Antenna
S08004004-I1-AN
06/11/2025
Filed — Alteration
Modification of existing Verizon site on roof. Installation of 2 antennas, 1 platform with dunnage, and related conduit routage along roof. Replacement of 4 antennas and 4 RRHs. Relocation of 2 GPS units.
S08004004-P1
08/01/2023
Signed off — Alteration
PROVIDE SUPPLEMENTAL AC UNIT IN THE FIRST FLOOR SWITCHROOM AND ASSOCIATED DRYCOOLER ON THE ROOF AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00571819-I1
04/24/2023
Signed off — Alteration
GC work related to the installation of a supplemental AC unit on 1st FL, concrete curb around the unit with a leak detector, new 8 fan quiet line drycooler on the roof & glycol pipe+ conduits running thru interior & down to the new AC unit per plans.
S00571746-I1
03/07/2023
Permit issued — Antenna
S08004004-I1-AN
12/22/2022
Objection raised — Scope
12/22/2022
Objection resolved — Addressed
12/22/2022
Objection raised — Zoning
12/22/2022
Objection resolved — Addressed
12/22/2022
Objection raised — Zoning
12/22/2022
Objection resolved — Addressed
12/19/2022
Filed — Alteration
Modification of existing Verizon site on roof. Installation of 2 antennas, 1 platform with dunnage, and related conduit routage along roof. Replacement of 4 antennas and 4 RRHs. Relocation of 2 GPS units.
S08004004-I1
07/15/2022
Signed off — Alteration
NON ILUMINATED NON ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - VERIZON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00712672-I1
04/25/2022
Permit issued — Sign
S00712672-I1-SG
04/20/2022
Filed — Alteration
NON ILUMINATED NON ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - VERIZON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00712672-I1
04/20/2022
Special inspection requirement — Final
MOHAMMAD AHEAD
03/28/2022
Permit issued — Mechanical Systems
S00571819-I1-MS
03/28/2022
Permit issued — General Construction
S00571746-I1-GC
11/09/2021
Objection raised — Scope
11/09/2021
Objection resolved — Addressed
10/04/2021
Filed — Alteration
GC work related to the installation of a supplemental AC unit on 1st FL, concrete curb around the unit with a leak detector, new 8 fan quiet line drycooler on the roof & glycol pipe+ conduits running thru interior & down to the new AC unit per plans.
S00571746-I1
10/01/2021
Violation issued (FDNY_NOV, closed)
09/30/2021
Objection raised — Scope
09/30/2021
Objection resolved — Addressed
09/30/2021
Objection raised — Admin
09/30/2021
Objection resolved — Addressed
09/03/2021
Filed — Alteration
PROVIDE SUPPLEMENTAL AC UNIT IN THE FIRST FLOOR SWITCHROOM AND ASSOCIATED DRYCOOLER ON THE ROOF AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00571819-I1
08/05/2021
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
08/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/05/2021
Special inspection requirement — Final
EUGENE BIFULCO
08/05/2021
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
08/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
08/05/2021
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
08/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
08/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
08/05/2021
Special inspection requirement — Maintenance information
EUGENE BIFULCO
07/25/2019
Violation issued (FDNY_NOV, closed)
09/25/2018
Violation issued (FDNY_NOV, closed)
01/22/2018
Violation issued (FDNY_NOV, closed)
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedODYSSIA GLOBAL COMM. CORP08/01/2025
DOB NOWAntennaPermit IssuedODYSSIA GLOBAL COMM. CORP03/07/2023
DOB NOWSignSigned-offSIGNSTAR NYC04/25/2022
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP03/28/2022
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP03/28/2022
BISFBISSUEDAMERICAN BOILER & WELDING04/14/2025
BISOTISSUEDTISHMAN INTERIORS CORP02/19/2021
BISFBISSUEDAPEX MECHANICAL CORP09/07/2017
BISBLISSUEDAPEX MECHANICAL CORP03/22/2017
BISOTISSUEDAMERICAN RESOURCE TECHNOL02/01/2017
BISOTISSUEDRAMAPO COMMUNICATION CORP12/09/2016
BISOTISSUEDRAMAPO COMMUNICATION CORP11/17/2016
BISOTISSUEDARROW ALLIANCE CONST.CORP09/22/2016
BISMHISSUEDARROW ALLIANCE CONST.CORP09/22/2016
BISMHISSUEDARROW ALLIANCE CONST.CORP07/26/2016
BISOTISSUEDARROW ALLIANCE CONST.CORP07/26/2016
BISOTISSUEDC.J. ELECTRICAL CONTRACTI11/23/2015
BISMHISSUEDARROW ALLIANCE CONST.CORP04/28/2009
BISOTISSUEDARROW ALLIANCE CONST.CORP04/28/2009
BIS—ISSUEDL.S. SIGN CO., INC11/10/2005
BISOTISSUEDTISHMAN CONSTRUCTION CORP05/25/2005
BISMHISSUEDTISHMAN CONSTRUCTION CORP04/21/2005
BISOTISSUEDTISHMAN CONSTRUCTION CORP04/21/2005
BISOTISSUEDTISHMAN CONSTRUCTION CORP03/17/2005
BISOTRE-ISSUEDTISHMAN CONSTRUCTION CORP02/26/2002
BISMHISSUEDTISHMAN CONSTRUCTION CORP02/26/2002
BISMHISSUEDTISHMAN CONSTRUCTION CORP03/30/2000
BISFSISSUEDRGJ CONTRACTING CO; INC.06/07/1999
BISFSISSUEDUNFLAT & PEROTTO05/21/1999
BISPLISSUEDSANITARY PLUMBING & HEATING CORP03/16/1999
BISMHISSUEDSUGRUE CONTRACTING CORP09/01/1998
BISOTISSUEDSUGRUE CONTRACTING CORP07/21/1998
4 projects · most recent 04/20/2022
General Wiring
FiledStatusContractorScope
04/20/2022CompleteFREEDOM ELECTL & DATA INCGeneral Wiring
03/02/2022CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
04/02/2021CompleteFREEDOM ELECTL & DATA INCGeneral Wiring
03/02/2021CompleteHATZEL AND BUEHLER, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/20/2022FinalMOHAMMAD AHEADprogress
08/05/2021Mechanical SystemsEUGENE BIFULCOspecial
08/05/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/05/2021FinalEUGENE BIFULCOprogress
08/05/2021Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/05/2021HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
08/05/2021Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
08/05/2021HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
08/05/2021HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/05/2021Maintenance informationEUGENE BIFULCOenergy_progress
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00571746-I1Request digital key ↗
08/24/2026S00712672-I1Request digital key ↗
08/19/2026S08004004-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION18
12/26/2024520275880Open ↗
12/19/2024520275880Open ↗
12/18/2024520275880Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION14
04/14/2025520275880Open ↗
04/14/2025520275880Open ↗
02/19/2021540190764Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/24/2017520261216Open ↗
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
03/01/2018520260388Open ↗
03/01/2018520255303Open ↗
07/25/2017520290006Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/25/2026S00571819-I1Open ↗
09/25/2026S00571819-I1Open ↗
09/25/2026S00571819-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00571819-I1Open ↗
08/25/2026S00571746-I1Open ↗
08/24/2026S00712672-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/04/2017520275880Open ↗
01/25/2017520290006Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/04/2017520275880Open ↗
02/02/2017520290006Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/25/2026S00571819-I1Open ↗
09/25/2026S00571819-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/20/2020540190764Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/20/2020540190764Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS2
03/09/2017520261216Open ↗
08/18/2009510052336Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/17/2018520275880Open ↗
04/04/2017520275880Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/06/2017520261216Open ↗
08/18/2009510052336Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/25/2016520260388Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
04/04/2017520275880Open ↗
▸BISTenant Protection Plan and Notes1
04/04/2017520275880Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/04/2017520275880Open ↗
07/27/2016520261216Open ↗
02/05/2016520260388Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/16/2008510057625Open ↗
08/27/2008510052336Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S08004004-P1Open ↗
08/13/2026S08004004-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/19/2021540190764Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026S00571819-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/01/2018520260388Open ↗
03/01/2018520255303Open ↗
07/25/2017520290006Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
05/07/2021540190764Open ↗
03/01/2018520260388Open ↗
03/01/2018520255303Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/11/2021540190764Open ↗
11/20/2020540190764Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/20/2020540190764Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00571819-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/07/2021540190764Open ↗
02/19/2021540190764Open ↗
11/20/2020540190764Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/05/2016520255303Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
05/11/2021540190764Open ↗
05/01/2018520260388Open ↗
05/01/2018520255303Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
04/04/2017520275880Open ↗
01/25/2017520290006Open ↗
01/25/2016520261216Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
04/14/2025520275880Open ↗
04/14/2025520275880Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/17/2021540190764Open ↗
03/06/2017520261216Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
11/30/2023520468093Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
05/07/2021540190764Open ↗
02/17/2021540190764Open ↗
02/16/2021540190764Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET10
11/30/2023520468093Open ↗
03/23/2017520275880Open ↗
01/25/2017520290006Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
04/14/2025520275880Open ↗
04/14/2025520275880Open ↗
03/01/2018520260388Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
12/26/2024520275880Open ↗
02/17/2021540190764Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/20/2020540190764Open ↗