← Back
BuildNYC
Walk-up apt, over six families with stores
52 WEST 56TH STREET
MANHATTAN · BIN 1085109
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
C5-PZoning
22,626 sfGross Floor Area
21Units
Rent Stabilized3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Building 48-52 West 56th Street · 6,025 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Xi'an Famous FoodsUnder Construction14p · 1 filing · 20 docs
CellarXi'an Famous FoodsUnder Construction10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IGD203/21/2026
IG Greenpoint203/21/2026
Building 48-52 West 56th Street103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JD Design Associates710/14/2026
Jack Green Associates103/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JD Arch803/21/2026
J.A.M. Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SJ Construction DesignGeneral Contractor404/09/2026
WTG ElectricElectrical303/21/2026
Jem Electrical ContractingElectrical103/21/2026
Monitor Electric ConstructionElectrical103/21/2026
Crossfield Plumbing & HeatingPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244410/14/2026
Building Lifecycle
All (50)Filed (8)Permit Issued (3)Violation (7)Inspection (2)Special Inspection (30)
10/14/2026
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-P3
10/09/2026
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-P4
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/02/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
10/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/02/2026
Special inspection requirement — Final
Guoyu Liu
10/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Guoyu Liu
10/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Guoyu Liu
10/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Guoyu Liu
10/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Guoyu Liu
10/02/2026
Special inspection requirement — Maintenance information
Guoyu Liu
10/02/2026
Special inspection requirement — Interior lighting power
Guoyu Liu
10/02/2026
Special inspection requirement — Lighting controls
Guoyu Liu
10/01/2026
Special inspection requirement — Interior lighting power
Guoyu Liu
10/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Guoyu Liu
10/01/2026
Special inspection requirement — Lighting controls
Guoyu Liu
07/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-P2
07/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-P1
02/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/30/2026
Permit issued — Plumbing
M01319531-S2-PL
12/16/2025
Permit issued — Mechanical Systems
M01319531-S1-MS
12/15/2025
Permit issued — General Construction
M01319531-I1-GC
12/04/2025
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-S2
12/04/2025
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-S1
11/21/2025
Filed — Alteration
INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK ON 1ST FLOOR, KITCHEN EXHAUST FOR EXISTING KITCHEN.
M01319531-I1
11/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Guoyu Liu
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Guoyu Liu
11/21/2025
Special inspection requirement — Interior lighting power
Guoyu Liu
11/21/2025
Special inspection requirement — Lighting controls
Guoyu Liu
11/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Guoyu Liu
11/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Guoyu Liu
11/21/2025
Special inspection requirement — Interior lighting power
Guoyu Liu
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Guoyu Liu
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/21/2025
Special inspection requirement — Lighting controls
Guoyu Liu
03/21/2023
Filed — Alteration
INSTALL (1) NEW GAS METER ON EXISTING PIPING IN THE CELLAR.
M00844014-I1
10/07/2010
Violation issued (ECB, closed)
Unknown
05/30/2003
Violation issued (ECB, closed)
Construction
08/06/1979
Violation issued (HPD, closed)
B
08/06/1979
Violation issued (HPD, closed)
A
08/06/1979
Violation issued (HPD, closed)
B
08/06/1979
Violation issued (HPD, closed)
A
08/06/1979
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating01/30/2026
DOB NOWMechanical SystemsPermit IssuedSJ Construction Design12/16/2025
DOB NOWGeneral ConstructionPermit IssuedSJ Construction Design12/15/2025
BISPLISSUEDDPH Plumbing & Heating09/17/2019
BISFPISSUEDWilliam Hird & Co06/21/2019
BISMHISSUEDRoyal Renovation05/29/2019
BISEQISSUEDFoodbridge LLC Dba Printon 5611/13/2002
BISOTISSUEDFoodbridge LLC Dba Printon 5611/13/2002
1 project · most recent 10/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Permit IssuedSJ Construction DesignHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric AC#A.#B#C#D:MXZ-SM48NL; 48,000 BTU · Condensing Unit ×4
AC#E.#F#H#G:PEFY-L48NMAU-A 48,000 BTU · Fan Coil Indoor ×4
2 projects · most recent 10/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/14/2026Signed-offCrossfield Plumbing & HeatingGas, Water/Sanitary
03/21/2023——Gas
3 projects · most recent 12/31/2025
General Wiring
FiledStatusContractorScope
12/31/2025Permit IssuedJem Electrical ContractingGeneral Wiring
06/09/2023Permit IssuedWTG ElectricGeneral Wiring
03/23/2023Permit IssuedWTG ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
10/02/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/02/2026Tenant Protection Plan Compliance—special
10/02/2026Mechanical SystemsNARESH MAHANGUspecial
10/02/2026Tenant Protection Plan Compliance—special
10/02/2026FinalGuoyu Liuprogress
10/02/2026Fire-Resistance Rated ConstructionGuoyu Liuprogress
10/02/2026HVAC-R and service water heating equipmentGuoyu Liuenergy_progress
10/02/2026HVAC-R and service water heating system controlsGuoyu Liuenergy_progress
10/02/2026HVAC-R and service water piping design and insulationGuoyu Liuenergy_progress
10/02/2026Maintenance informationGuoyu Liuenergy_progress
10/02/2026Interior lighting powerGuoyu Liuenergy_progress
10/02/2026Lighting controlsGuoyu Liuenergy_progress
10/01/2026Interior lighting powerGuoyu Liuenergy_progress
10/01/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/01/2026Fire-Resistance Rated ConstructionGuoyu Liuprogress
10/01/2026Lighting controlsGuoyu Liuenergy_progress
07/22/2026Tenant Protection Plan Compliance—special
07/07/2026Tenant Protection Plan Compliance—special
02/12/2026Tenant Protection Plan Compliance—special
11/21/2025HVAC-R and service water heating equipmentGuoyu Liuenergy_progress
11/21/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/21/2025Fire-Resistance Rated ConstructionGuoyu Liuprogress
11/21/2025Interior lighting powerGuoyu Liuenergy_progress
11/21/2025Lighting controlsGuoyu Liuenergy_progress
11/21/2025Fire-Resistance Rated ConstructionGuoyu Liuprogress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Xi'an Famous FoodsRestaurant / Food ServiceCellar, Floor 1
Project M01319531 Alteration · Permit Entire · 11/21/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026M00844014-I1Request digital key ↗
08/18/2026M01319531-S2Request digital key ↗
08/18/2026M01319531-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
02/24/2020123758683Open ↗
02/24/2020123758683Open ↗
06/18/2019123595314Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
09/18/2019123758683Open ↗
06/21/2019123595314Open ↗
05/29/2019123758683Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature22
10/11/2026M01319531-P4Open ↗
10/11/2026M01319531-P4Open ↗
10/11/2026M01319531-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/11/2026M01319531-P3Open ↗
10/11/2026M01319531-P4Open ↗
08/18/2026M01319531-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/11/2026M01319531-P3Open ↗
10/11/2026M01319531-P4Open ↗
10/11/2026M01319531-P4Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/21/2019123595314Open ↗
05/20/2019123758683Open ↗
12/28/2018123595314Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/20/2019123758683Open ↗
10/28/2010120511856Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/20/2019123758683Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/28/2010120511856Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/24/2020123758683Open ↗
05/20/2019123758683Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/21/2019123595314Open ↗
05/20/2019123758683Open ↗
12/28/2018123595314Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/11/2026M01319531-P3Open ↗
10/11/2026M01319531-P4Open ↗
08/18/2026M01319531-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/28/2010120511856Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/20/2019123758683Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/20/2019123758683Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
10/28/2010120511856Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
06/21/2019123595314Open ↗
05/20/2019123758683Open ↗
12/28/2018123595314Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
02/24/2020123758683Open ↗
11/14/2019123758683Open ↗
06/21/2019123595314Open ↗
▸BISEFILING COVER SHEET3
05/20/2019123758683Open ↗
12/28/2018123595314Open ↗
10/28/2010120511856Open ↗
▸BISBOROUGH INTAKE FORM2
02/24/2020123758683Open ↗
05/29/2019123595314Open ↗
▸Other Documents1
▸BISDHCR DOCUMENT1
05/20/2019123758683Open ↗