← Back
BuildNYC
Luxury hotel
InterContinental Hotel
520 LEXINGTON AVENUE · BIN 1036224
💬 Discuss this project
1926Year Built
14Stories
H1Building Class
C6-6Zoning
443,607 sfGross Floor Area
8Units
LL97 CoveredRent Stabilized14 Active Violations ▸FISP: SAFE
Luxury hotel · Owner of record: Metropolitan Transportation Authority · 41,170 sf lot · 10.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofIntercontinental New York Barclay1p · 1 filing · 16 docs
Floor 4Intercontinental New York Barclay4p · 1 filing · 6 docs
Floor 3
Floor 2
Floor 1Intercontinental New York Barclay55p · 9 filings · 20 docs
Site & exteriorIntercontinental New York Barclay1p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
111 East 48 St Holdings9507/08/2026
Barkley Operating9303/21/2026
International Hotel Group203/21/2026
Metropolitan Transportation Authority103/22/2026
111 East 48 Street103/21/2026
Katoreal Estate103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WJY Electric510/20/2025
Albert Montoya Architect108/19/2025
New York Design Architects301/03/2025
CL Engineering211/21/2023
HC Engineering108/22/2023
Alsa Architecture107/06/2021
Syed Engineering104/08/2021
Southport212/13/2019
Leon Skvirsky PE103/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates403/21/2026
CSMR Designs103/21/2026
JP Expedite203/21/2026
New York Design Arhictects603/21/2026
Expediting103/21/2026
Municipal Building Consultants103/21/2026
NY Signs Com203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shawmut Woodworking SupplyGeneral Contractor4003/21/2026
Cox Fire ProtectionFire Protection1703/21/2026
Paramount PlumbingPlumbing1503/21/2026
GrinnellFire Protection703/21/2026
ArtconGeneral Contractor603/21/2026
Kaj NY ConstructionScaffold603/21/2026
Universal Services GroupGeneral Contractor307/08/2026
W.J. Regan & CompanyGeneral Contractor304/09/2026
KSW Mechanicalspecialty_contractor303/21/2026
Altair Plumbing and HeatingPlumbing207/08/2026
M&D Fire SprinklerFire Protection207/08/2026
PAR PlumbingPlumbing203/21/2026
Nicholson GallowayGeneral Contractor203/21/2026
Preferred BuildersGeneral Contractor203/21/2026
CPM BuildersGeneral Contractor203/21/2026
Safway AtlanticGeneral Contractor203/21/2026
CS BridgeGeneral Contractor203/21/2026
NY Building Associatesspecialty_contractor203/21/2026
American Standard P&H Cororpspecialty_contractor207/08/2026
NYC Plumbing & Heatingspecialty_contractor207/08/2026
Hydronic Concepts NY Plumbingspecialty_contractor203/21/2026
L.S. SignSign hanger107/08/2026
Signs CadSign hanger107/08/2026
Dato A Cspecialty_contractor104/09/2026
Orbit SprinklerFire Protection107/08/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
Standard Fire SupplyFire Protection107/08/2026
Chief Fire Prev MechanicalFire Protection103/21/2026
Lund Fire ProductsFire Protection103/21/2026
AMEC Construction ManagementGeneral Contractor103/21/2026
EasternGeneral Contractor103/21/2026
Integral ContractingGeneral Contractor103/21/2026
Joseph Teklits WoodcraftGeneral Contractor103/21/2026
NY Building AssociatesGeneral Contractor107/08/2026
Rite-Way Internal RemovalGeneral Contractor103/21/2026
Spring EnterprisGeneral Contractor103/21/2026
Pace PlumbingPlumbing103/21/2026
Five Town Neon SignSign hanger107/08/2026
AMEC Construction ManagementGeneral Contractor205/14/2001
Apco GroupGeneral Contractor112/04/2006
Atlantic Hoisting & ScaffGeneral Contractor105/08/2013
Atlantic ScaffoldingGeneral Contractor206/16/1997
Breenan BrothersPlumbing108/24/1999
Deem PlumbingPlumbing208/29/2013
I.M.P. Plumbing & HeatingPlumbing105/05/2010
Imp Plumbing & HeatingFire Protection107/22/2005
Imp Plumbing & HeatingFire Protection107/22/2005
Imp Plumbing & HeatingFire Protection507/22/2005
Imp Plumbing & HeatingFire Protection207/22/2005
Lab Plumbing & HeatingPlumbing108/21/2002
Mechanical ResourceGeneral Contractor709/16/2002
Paramount PlumbingPlumbing104/26/2017
Phoenix BridgingGeneral Contractor107/25/2003
PSI FireFire Protection111/08/2018
PSI PlumbingPlumbing110/16/2018
Red Wing ElectricGeneral Contractor309/02/2010
Riehm PlumbingPlumbing109/24/2002
Sentinel Fire ControlFire Protection108/11/1999
S.N. TannorGeneral Contractor210/28/1997
Statewide DemolitionGeneral Contractor111/12/2014
Sunset Plumbing & Fire ProtectionPlumbing105/03/1996
Tishman ConstructionGeneral Contractor312/31/2012
Vantage AssociatesGeneral Contractor112/09/2014
W5 GroupGeneral Contractor109/15/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNS Inspection Services7566510/20/2025
Aks Architectural & Engineering1957301/03/2025
NKM Engineering6244211/21/2023
AK Engineering678112/13/2019
Southport Engineering Associates7514110/10/2019
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/22/2026
Signed off — Alteration
INSTALLLATION OF A NON-ADVERTISING ILLUMMINATED ACCESSORY BUSINESS WALL SIGN WORDING : ATELIER LENVIE
M01268653-I1
06/15/2026
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION WITH GENERAL CONSTRUCTION WORK ON FIRST FLOOR AS PER PLAN FILED HEREWITH, NO CHANGE OF USE, EGRESS OR OCCUPANCY
M00917651-I1
06/05/2026
Signed off — Alteration
RENOVATION OF FIRST FLOOR TENANT SPACE TO ACCOMMODATE NEW TENANT LAYOUT. WORK INCLUDES NEW PARTITIONS, CEILING, FLOORING, AND FINISHES. NEW FANS FOR EXISTING MECHANICAL SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00794943-I1
05/29/2026
Elevator Category 1 inspection report filed
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAltair Plumbing and Heating09/23/2025
DOB NOWSignSigned-offWeinfeld, Elliot09/11/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler07/16/2025
DOB NOWSprinklersSigned-offM&D Fire Sprinkler05/13/2025
DOB NOWGeneral ConstructionSigned-offW.J. Regan & Company03/24/2025
DOB NOWMechanical SystemsSigned-offDato A/C02/03/2025
DOB NOWSprinklersSigned-offM&D Fire Sprinkler01/09/2025
DOB NOWGeneral ConstructionSigned-offArtcon08/12/2024
DOB NOWPlumbingSigned-offAltair Plumbing and Heating06/26/2024
DOB NOWGeneral ConstructionSigned-offArtcon04/29/2024
DOB NOWGeneral ConstructionSigned-offNY Building Associates01/16/2024
DOB NOWMechanical SystemsSigned-offNY Building Associates01/16/2024
DOB NOWSprinklersSigned-offAmerican Standard Plumbing01/16/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp01/16/2024
DOB NOWSignSigned-offSigns Cad08/22/2023
DOB NOWSprinklersSigned-offNYC Plumbing & Heating02/03/2023
DOB NOWPlumbingSigned-offNYC Plumbing & Heating02/03/2023
DOB NOWGeneral ConstructionSigned-offMedcon Services01/10/2023
DOB NOWGeneral ConstructionSigned-offUniversal Services Group07/27/2022
DOB NOWGeneral ConstructionSigned-offUniversal Services Group05/12/2022
DOB NOWGeneral ConstructionSigned-offUniversal Services Group11/12/2021
DOB NOWSidewalk ShedSigned-offKaj NY Construction11/01/2021
DOB NOWSidewalk ShedSigned-offKaj NY Construction04/08/2021
DOB NOWSprinklersSigned-offStandard Fire Supply02/20/2020
DOB NOWMechanical SystemsSigned-offKSW Mechanical01/04/2020
DOB NOWSignSigned-offEnrico Passaro04/03/2019
BISOTISSUEDW.J. Regan & Company05/18/2022
BISOTISSUEDW.J. Regan & Company03/05/2020
BISOTISSUEDEastern 200003/04/2020
BISOTISSUEDW.J. Regan & Company01/28/2020
BISMHISSUEDIntegral Contracting04/10/2019
BISPLISSUEDHydronic Concepts NY P&H01/17/2019
BISSPISSUEDHydronic Concepts NY Plumbing01/17/2019
BISSPISSUEDPSI Fire11/08/2018
BISPLISSUEDPSI Plumbing10/16/2018
BISMHISSUEDIntegral Contracting10/11/2018
BISOTISSUEDIntegral Contracting10/10/2018
BISSPISSUEDGrinnell03/05/2018
BISSDISSUEDGrinnell03/05/2018
BISOTISSUEDShawmut Woodworking & Supply11/01/2017
+ 36 more permits on file
1 project · most recent 10/20/2025
FiledStatusContractorScope
10/20/2025Signed-offOrbit Sprinkler—
10 projects · most recent 12/06/2023
General Wiring
FiledStatusContractorScope
12/06/2023CompleteLens ElectricGeneral Wiring
09/13/2023CompleteSigns Cad—
06/16/2023CompleteUnity ElectricGeneral Wiring
02/09/2023CompleteGlendale Electl ContngGeneral Wiring
04/08/2021CompleteRichard Neu—
05/06/2020CompleteE-J Electric InstallationGeneral Wiring
03/30/2020CompleteAgir Electrical Ltd D/B/AGeneral Wiring
03/27/2020CompleteDooley ElectricGeneral Wiring
04/26/2019CompleteH & L ElectricGeneral Wiring
11/29/2018CompleteR.C.M. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/21/2025Fire-Resistant Penetrations and JointsADITYA DESAIspecial
10/21/2025Sprinkler SystemsADITYA DESAIspecial
01/22/2025FinalADITYA DESAIprogress
01/22/2025Mechanical SystemsADITYA DESAIspecial
01/22/2025Fire-Resistant Penetrations and JointsADITYA DESAIspecial
01/09/2025FinalCHRISTIAN LOZADAprogress
01/09/2025Fire-Resistant Penetrations and JointsADITYA DESAIspecial
01/09/2025Mechanical SystemsADITYA DESAIspecial
11/15/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
11/14/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/14/2023Interior lighting powerNARESH MAHANGUenergy_progress
11/14/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/23/2023FinalPETER CHOprogress
07/26/2023FinalHackjong Choiprogress
03/13/2023HVAC-R and service water piping design and insulationJoseph Smerinaenergy_progress
03/13/2023Shutoff dampersJoseph Smerinaenergy_progress
03/13/2023HVAC-R and service water heating system controlsJoseph Smerinaenergy_progress
03/13/2023Maintenance informationJoseph Smerinaenergy_progress
03/13/2023Tenant Protection Plan ComplianceJoseph Smerinaspecial
03/13/2023Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
03/13/2023Mechanical SystemsJoseph Smerinaspecial
03/13/2023Post-installed AnchorsJoseph Smerinaspecial
03/13/2023Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
03/13/2023Energy Code Compliance InspectionsJoseph Smerinaprogress
03/13/2023FinalJoseph Smerinaprogress
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Intercontinental New York BarclayHotel / LodgingFloors 1, 4, Roof
Project M01268653 Alteration · LOC Issued · 08/19/2025
Project M00917651 Alteration · LOC Issued · 11/21/2023
Project M00927932 Alteration · LOC Issued · 11/21/2023
Project M00928124 Alteration · LOC Issued · 11/20/2023
Project M00928128 Alteration · LOC Issued · 11/20/2023
Project M00909975 Alteration · LOC Issued · 08/22/2023
Project M00794943 Alteration · LOC Issued · 11/15/2022
Project M00794996 Alteration · LOC Issued · 11/15/2022
Project M00528994 Alteration · LOC Issued · 07/06/2021
Project M00499338 Alteration · LOC Issued · 04/08/2021
Project M00275098 Alteration · LOC Issued · 12/13/2019
Project M00196726 Alteration · LOC Issued · 10/10/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
1,780 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account