← Back
Elevator apt, semi-fireproof with stores
520 WEST 136 STREET
MANHATTAN · Manhattanville-West Harlem · BIN 1059807
💬 Discuss this project
1926Year Built
6Stories
D7Building Class
R7AZoning
41,358 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized41 Open Violations 36 unresolved · 5 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: 520 W 136 LLC · 9,992 sf lot · 4.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 43p · 1 filing · 10 docs
Floor 3Under Construction3p · 1 filing · 10 docs
Floor 2
Floor 15p · 2 filings · 20 docs
Cellar5p · 1 filing · 13 docs
Site & exterior1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
500 W 1482207/08/2026
CAMPUS REALTY1203/21/2026
CITY SKYLINE REALTY403/22/2026
DAVID GREENBERG REAL ESTATE403/21/2026
CITY SKYLINE209/01/2026
KAUFMAN MANAGEMENT203/21/2026
520 W 136 LLC103/22/2026
WEST 139 STREET LLC103/22/2026
CFF CONSULTING INC.103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/27/2020$8.4M—CAMPUS REALTY LLC → 520 W 136 LLC$204/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC508/06/2026
LAM ENGINEER PC608/04/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NSK HOME IMPROVEMENT CORPGeneral Contractor408/11/2026
CROSSFIELD PLBG.&HTGPlumbing407/08/2026
ENA PLUMBING CORPPlumbing307/08/2026
HONOR CONSTRUCTION INCGeneral Contractor303/21/2026
LAURENCE ROBINElectrical203/21/2026
JIMENEZ LUISElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422107/10/2026
ARCHITECTURAL CONCEPT3642203/31/2022
LAM ENGINEER PC1180608/04/2021
PRAINITO ARCHITECT P.C.7432105/26/2021
Building Lifecycle
All (112)Filed (11)Permit Issued (6)Signed Off (2)Violation (60)Inspection (3)Objection (12)Special Inspection (18)
08/10/2026
Permit issued — General Construction
M01426492-I1-GC
08/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
08/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
08/09/2026
Special inspection requirement — Final
SERDAR CEYLAN
08/06/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT ON 6TH FLOOR AS PER PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01426492-P1
07/10/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT ON 6TH FLOOR AS PER PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01426492-I1
04/27/2026
Violation issued (HPD, open)
I
04/27/2026
Violation issued (HPD, closed)
I
04/23/2026
Violation issued (HPD, closed)
C
04/23/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/01/2026
Violation issued (HPD, closed)
A
04/01/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
A
02/25/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
A
07/08/2025
Violation issued (HPD, closed)
A
07/08/2025
Violation issued (HPD, closed)
B
07/08/2025
Violation issued (HPD, closed)
C
07/08/2025
Violation issued (HPD, closed)
B
07/08/2025
Violation issued (HPD, closed)
A
01/13/2025
Violation issued (HPD, closed)
B
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, closed)
C
07/19/2024
Violation issued (HPD, closed)
C
06/28/2024
Violation issued (HPD, closed)
C
06/28/2024
Violation issued (HPD, closed)
B
06/28/2024
Violation issued (HPD, open)
C
05/18/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
B
02/09/2024
Violation issued (HPD, closed)
C
02/09/2024
Violation issued (HPD, closed)
C
01/25/2024
Violation issued (HPD, closed)
B
01/25/2024
Violation issued (HPD, closed)
B
01/17/2024
Violation issued (HPD, closed)
A
12/10/2023
Violation issued (HPD, closed)
B
12/10/2023
Violation issued (HPD, closed)
B
12/10/2023
Violation issued (HPD, closed)
B
12/10/2023
Violation issued (HPD, closed)
C
12/10/2023
Violation issued (HPD, closed)
C
12/10/2023
Violation issued (HPD, open)
B
12/10/2023
Violation issued (HPD, open)
B
10/15/2023
Violation issued (HPD, closed)
B
10/15/2023
Violation issued (HPD, open)
B
10/15/2023
Violation issued (HPD, closed)
B
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, open)
B
10/15/2023
Violation issued (HPD, closed)
B
10/15/2023
Violation issued (HPD, closed)
A
10/15/2023
Violation issued (HPD, closed)
B
10/15/2023
Violation issued (HPD, closed)
B
10/15/2023
Violation issued (HPD, closed)
C
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNSK HOME IMPROVEMENT CORP08/10/2026
DOB NOWPlumbingPermit IssuedENA PLUMBING CORP02/21/2022
DOB NOWMechanical SystemsPermit IssuedNSK HOME IMPROVEMENT CORP01/05/2022
DOB NOWGeneral ConstructionSigned-offHONOR CONSTRUCTION INC05/04/2021
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/27/2021
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG12/09/2020
BISOTISSUEDHONOR CONSTRUCTION INC11/16/2020
BISBLISSUEDBRYAN A. ENNIST05/28/2019
BISBLISSUEDBRYAN A. ENNIST03/28/2019
BISBLISSUEDBRYAN A. ENNIST01/08/2019
BISPLISSUEDCASA MECHANICAL CO. INC01/08/2019
BISOTISSUEDMAND RESTORATION CORP11/13/2017
BISEQISSUEDSPRING SCAFFOLDING LLC06/06/2017
BISPLISSUEDPLBG P & H INC05/31/2017
BISOTISSUEDIMPACT BUILDERS CORP04/17/2017
BISOTISSUEDIMPACT BUILDERS CORP03/31/2017
BISFBISSUEDMARLANDE HEATING CORP.12/12/2002
BISPLISSUEDALKLEM PLUMBING INC12/12/2002
1 project · most recent 05/26/2021
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/26/2021Permit IssuedNSK HOME IMPROVEMENT CORPAssociated Ducts and Piping
Ducts & Piping
N/A N/A ×1
2 projects · most recent 03/31/2022
Water/Sanitary Plumbing-Sprinkler Gas
FiledStatusContractorScope
03/31/2022Permit IssuedENA PLUMBING CORPPlumbing-Sprinkler, Water/Sanitary
08/04/2021Signed-offCROSSFIELD P & H CORPGas, Water/Sanitary
7 projects · most recent 05/19/2021
General Wiring Boiler Controls
FiledStatusContractorScope
05/19/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
03/31/2021CompleteOM ELECTRIC, INCGeneral Wiring
03/29/2021CompleteOM ELECTRIC, INCGeneral Wiring
11/30/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
02/10/2019CompleteRALEIGH POWELL LIC ELECBoiler Controls
12/05/2018CompleteRALEIGH POWELL LIC ELECBoiler Controls
03/08/2018CompleteSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/10/2022Pass-Final SD - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/09/2026Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
08/09/2026Tenant Protection Plan ComplianceSERDAR CEYLANspecial
08/09/2026FinalSERDAR CEYLANprogress
04/04/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
04/04/2022Energy Code Compliance InspectionsSERDAR CEYLANprogress
04/04/2022HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
03/31/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
03/31/2022Energy Code Compliance InspectionsSERDAR CEYLANprogress
03/31/2022HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
08/17/2021Fire-Resistant Penetrations and JointsYUK LAMspecial
08/17/2021Energy Code Compliance InspectionsYUK LAMprogress
08/12/2021Energy Code Compliance InspectionsYUK LAMprogress
08/12/2021Fire-Resistant Penetrations and JointsYUK LAMspecial
08/12/2021Lighting in dwelling unitsYUK LAMenergy_progress
08/03/2021Fire-Resistant Penetrations and JointsYUK LAMspecial
08/03/2021Energy Code Compliance InspectionsYUK LAMprogress
11/19/2020Energy Code Compliance InspectionsYUK LAMprogress
11/19/2020Fire-Resistant Penetrations and JointsYUK LAMspecial
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
09/04/2026M00482794-P1Request digital key ↗
09/03/2026M00527350-I1Request digital key ↗
09/03/2026M00482797-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00419033-I1Request digital key ↗
08/15/2026M00419033-P1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION15
10/27/2020140970359Open ↗
03/19/2019140825515Open ↗
03/13/2019140825515Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION11
07/27/2021140825515Open ↗
05/12/2021140825515Open ↗
11/16/2020140970359Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/09/2021140970359Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00482794-I1Open ↗
09/02/2026M00514487-I1Open ↗
08/16/2026M01426492-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026M00514487-I1Open ↗
09/28/2026M00514487-I1Open ↗
09/01/2026M01426492-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/28/2026M00514487-I1Open ↗
09/01/2026M01426492-I1Open ↗
08/26/2026M00482797-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/07/2019140825515Open ↗
12/13/2018123558729Open ↗
06/05/2017140651266Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/13/2018123558729Open ↗
04/12/2017123060506Open ↗
04/11/2017123060506Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/13/2018123558729Open ↗
02/28/2018121292733Open ↗
06/12/2017121292733Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/07/2019140825515Open ↗
06/05/2017140651266Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/07/2019140825515Open ↗
06/05/2017140651266Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/27/2020140970359Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
03/19/2019140825515Open ↗
03/13/2019140825515Open ↗
01/22/2019140825515Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
01/22/2019140825515Open ↗
01/18/2019140825515Open ↗
01/07/2019140825515Open ↗
▸BISSCHEDULE B - PLUMBING1
01/07/2019140825515Open ↗
▸Safety & Tenant Protection9
▸BISTENANT PROTECTION PLAN AND NOTES6
10/27/2020140970359Open ↗
01/07/2019140825515Open ↗
06/05/2017140651266Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00419033-P1Open ↗
08/13/2026M00419033-I1Open ↗
▸BISSTREET TREE CHECKLIST1
06/12/2017121292733Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/16/2026M01426492-I1Open ↗
08/16/2026M01426492-P1Open ↗
08/15/2026M00514487-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
10/27/2020140970359Open ↗
01/07/2019140825515Open ↗
12/13/2018123558729Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/10/2017121292733Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/14/2021140825515Open ↗
09/21/2021140825515Open ↗
03/09/2021140970359Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/13/2018123558729Open ↗
02/28/2018121292733Open ↗
06/12/2017121292733Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/14/2021140825515Open ↗
09/21/2021140825515Open ↗
03/09/2021140970359Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/05/2017140651266Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/07/2019140825515Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00482794-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/14/2021140825515Open ↗
09/21/2021140825515Open ↗
03/09/2021140970359Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
03/19/2018140651266Open ↗
02/28/2018121292733Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/14/2021140825515Open ↗
03/09/2021140970359Open ↗
03/19/2018140651266Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/27/2021140825515Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
10/14/2021140825515Open ↗
03/09/2021140970359Open ↗
10/27/2020140970359Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/14/2017121292733Open ↗
▸Filing & Intake Forms22
▸BISBOROUGH INTAKE FORM8
07/27/2021140825515Open ↗
05/12/2021140825515Open ↗
03/13/2019140825515Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION8
06/13/2019140825515Open ↗
03/19/2019140825515Open ↗
01/22/2019140825515Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/27/2020140970359Open ↗
01/07/2019140825515Open ↗
06/05/2017140651266Open ↗
▸BISEFILING COVER SHEET3
12/13/2018123558729Open ↗
06/12/2017121292733Open ↗
04/12/2017123060506Open ↗
▸Other Documents10
▸DOB NOWHPD4: CONH Pilot Program5
08/16/2026M01426492-I1Open ↗
08/16/2026M01426492-P1Open ↗
08/13/2026M00527350-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD: CONH Pilot3
08/14/2026M00482794-I1Open ↗
08/13/2026M00527350-I1Open ↗
08/13/2026M00482794-P1Open ↗
▸BISHPD: CONH PILOT2
10/27/2020140970359Open ↗
01/07/2019140825515Open ↗