← Back
Primarily 2 family with 1 store or office
5202 16 AVENUE
BROOKLYN · BIN 3129874
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6Zoning
2,400 sfGross Floor Area
3Units
22 Open Violations 21 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 5202 16TH AVE LLC · 800 sf lot · 3 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 34p · 1 filing · 9 docs
Floor 24p · 1 filing · 9 docs
Floor 14p · 1 filing · 9 docs
Cellar5p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSD REALTY GROUP LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2021$1.4M—MSD REALTY GROUP LLC → 5202 16TH AVE LLC$601/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL HOME IMPROVEMENTSGeneral Contractor1007/08/2026
WNW & SONS PLUMBING & HTGFire Protection207/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor107/08/2026
WNW & SONS PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050802/29/2024
Building Lifecycle
All (49)Filed (9)Permit Issued (8)Signed Off (4)Violation (22)Inspection (6)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/06/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/23/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/20/2024
Permit issued — Sprinklers
B00623233-I1-EW-SP
06/10/2024
Signed off — Alteration
Interior renovation of existing UG 6 retail space on first floor -Proposed retail store with medical office - remove demising wall between buildings (5204 16th Ave Filed under Application B00622968-I1
B00577689-I1
02/29/2024
Filed — Alteration
Proposed Sprinkler System on new water service in conjunction with DOB #B00577689-I1
B00623233-P1
01/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2023
Signed off — Alteration
Filing structural work to remove demising wall between 5202 & 5204 16th Ave install steel beams - Architectural Drawings approved under B00577689 & B00622968
B00682015-I1
11/29/2023
Signed off — Alteration
TEMPORARY 8' CONSTRUCTION FENCE FILED HEREWITH FOR 76 LINEAR FEET (CONTRACTOR TO COORDINATE DOT PERMIT. for fence extending more than 3' beyond property line)
B00699295-I1
11/17/2023
Filed — Alteration
Interior renovation of existing UG 6 retail space on first floor -Proposed retail store with medical office - remove demising wall between buildings (5204 16th Ave Filed under Application B00622968-I1
B00577689-P3
08/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2022
Permit issued — General Construction
B00577689-I1-GC
09/29/2022
Signed off — Alteration
B00764114-I1
09/20/2022
Permit issued — Sprinklers
B00623233-I1-EW-SP
09/20/2022
Permit issued — Plumbing
B00593744-I1-PL
06/27/2022
Filed — Alteration
B00764114-I1
06/27/2022
Permit issued — Sidewalk Shed
B00764114-I1-SH
04/05/2022
Filed — Alteration
Filing Plumbing fixtures in conjunction with DOB B00577689-P1
B00593744-I1
03/29/2022
Permit issued — Construction Fence
B00699295-I1-FN
03/24/2022
Permit issued — Structural
B00682015-I1-ST
03/22/2022
Filed — Alteration
TEMPORARY 8' CONSTRUCTION FENCE FILED HEREWITH FOR 76 LINEAR FEET (CONTRACTOR TO COORDINATE DOT PERMIT. for fence extending more than 3' beyond property line)
B00699295-I1
02/28/2022
Filed — Alteration
Proposed Sprinkler System on new water service in conjunction with DOB #B00577689-I1
B00623233-I1
02/22/2022
Filed — Alteration
Filing structural work to remove demising wall between 5202 & 5204 16th Ave install steel beams - Architectural Drawings approved under B00577689 & B00622968
B00682015-I1
11/04/2021
Filed — Alteration
Interior renovation of existing UG 6 retail space on first floor -Proposed retail store with medical office - remove demising wall between buildings (5204 16th Ave Filed under Application B00622968-I1
B00577689-P1
10/14/2021
Permit issued — General Construction
B00577689-I1-GC
08/31/2021
Filed — Alteration
Interior renovation of existing UG 6 retail space on first floor -Proposed retail store with medical office - remove demising wall between buildings (5204 16th Ave Filed under Application B00622968-I1
B00577689-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2012
Violation issued (ECB, open)
Boilers
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedWNW & SONS PLUMBING & HTG09/20/2024
DOB NOWGeneral ConstructionSigned-offGLOBAL HOME IMPROVEMENTS12/02/2022
DOB NOWSprinklersPermit IssuedWNW & SONS PLUMBING & HTG09/20/2022
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC09/20/2022
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL06/27/2022
DOB NOWConstruction FenceSigned-offGLOBAL HOME IMPROVEMENTS03/29/2022
DOB NOWStructuralSigned-offGLOBAL HOME IMPROVEMENTS03/24/2022
DOB NOWGeneral ConstructionSigned-offGLOBAL HOME IMPROVEMENTS10/14/2021
1 project · most recent 02/29/2024
FiledStatusContractorScope
02/29/2024Permit IssuedHQ FIRE PROTECTION INC39 heads
1 project · most recent 04/05/2022
Water/Sanitary
FiledStatusContractorScope
04/05/2022Signed-offWNW & SONS PLBG & HTG INCWater/Sanitary
1 project · most recent 06/28/2022
FiledStatusContractorScope
06/28/2022CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/23/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
03/15/2024Sprinkler SystemsPAUL MARINOspecial
03/15/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
03/15/2024Post-installed AnchorsPAUL MARINOspecial
11/21/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/21/2023Interior lighting powerPAUL MARINOenergy_progress
11/21/2023Fenestration air leakagePAUL MARINOenergy_progress
11/21/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/21/2023Fenestration air leakagePAUL MARINOenergy_progress
11/21/2023Interior lighting powerPAUL MARINOenergy_progress
11/21/2023Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/21/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/21/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/21/2023FinalJAMES SCHAEFERprogress
11/21/2023Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/21/2023FinalJAMES SCHAEFERprogress
06/01/2022HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
06/01/2022HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
06/01/2022Maintenance informationPAUL MARINOenergy_progress
06/01/2022HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
05/25/2022Energy Code Compliance InspectionsPAUL MARINOprogress
04/04/2022Fire-Resistant Penetrations and JointsPAUL MARINOspecial
02/16/2022Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
02/16/2022FinalJAMES SCHAEFERprogress
02/16/2022Structural Cold-Formed SteelPAUL MARINOspecial
02/16/2022Structural Steel - High Strength BoltingPAUL MARINOspecial
Latest 25 of 27.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00577689-P2Request digital key ↗
08/31/2026B00577689-P3Request digital key ↗
08/31/2026B00682015-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B00682015-I1Open ↗
09/01/2026B00593744-I1Open ↗
09/01/2026B00593744-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00682015-I1Open ↗
09/01/2026B00682015-I1Open ↗
09/01/2026B00682015-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00682015-I1Open ↗
08/30/2026B00699295-I1Open ↗
08/25/2026B00623233-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00682015-I1Open ↗
08/25/2026B00623233-I1Open ↗
08/14/2026B00623233-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00593744-I1Open ↗
08/13/2026B00577689-I1Open ↗