← Back
BuildNYC
Primarily 2 family with 1 store or office
5202 16TH AVENUE
BROOKLYN · Borough Park · BIN 3129874
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6Zoning
2,400 sfGross Floor Area
3Units
3 Active Violations 2 unresolved · 1 paperwork only 3 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 5202 16th Ave · 800 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Avenue Eye Exam4p · 1 filing · 9 docs
Floor 2Avenue Eye Exam4p · 1 filing · 9 docs
Floor 1Avenue Eye Exam, Emes Vision Center15p · 4 filings · 20 docs
CellarAvenue Eye Exam5p · 1 filing · 9 docs
Site & exteriorAvenue Eye Exam10p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSD Realty Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2021$1.4M—MSD REALTY GROUP LLC → 5202 16TH AVE LLC$601/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
City Expediting1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Global Home ImprovementsGeneral Contractor903/21/2026
WNW & Sons Plumbing & HeatingFire Protection207/08/2026
Dynamix Scaffold GroupScaffold107/08/2026
Global Home ImprovementsScaffold107/08/2026
WNW & Sons Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE2050802/29/2024
Building Lifecycle
All (105)Filed (9)Permit Issued (8)Signed Off (4)Violation (22)Inspection (3)Objection (32)Special Inspection (27)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/20/2024
Permit issued — Sprinklers
B00623233-I1-EW-SP
06/10/2024
Signed off — Alteration
Interior renovation of existing UG 6 retail space on first floor -Proposed retail store with medical office - remove demising wall between buildings (5204 16th Ave Filed under Application B00622968-I1
B00577689-I1
03/15/2024
Special inspection requirement — Sprinkler Systems
PAUL MARINO
03/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
03/15/2024
Special inspection requirement — Post-installed Anchors
PAUL MARINO
03/13/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
03/12/2024
Objection raised — Other
03/12/2024
Objection raised — DPL-1
03/07/2024
Objection raised — Scope
03/07/2024
Objection resolved — Addressed
02/29/2024
Filed — Alteration
Proposed Sprinkler System on new water service in conjunction with DOB #B00577689-I1
B00623233-P1
01/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2023
Signed off — Alteration
Filing structural work to remove demising wall between 5202 & 5204 16th Ave install steel beams - Architectural Drawings approved under B00577689 & B00622968
B00682015-I1
11/29/2023
Signed off — Alteration
TEMPORARY 8' CONSTRUCTION FENCE FILED HEREWITH FOR 76 LINEAR FEET (CONTRACTOR TO COORDINATE DOT PERMIT. for fence extending more than 3' beyond property line)
B00699295-I1
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
11/21/2023
Special inspection requirement — Interior lighting power
PAUL MARINO
11/21/2023
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
11/21/2023
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/21/2023
Special inspection requirement — Interior lighting power
PAUL MARINO
11/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
11/21/2023
Special inspection requirement — Final
JAMES SCHAEFER
11/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
11/21/2023
Special inspection requirement — Final
JAMES SCHAEFER
11/17/2023
Filed — Alteration
Interior renovation of existing UG 6 retail space on first floor -Proposed retail store with medical office - remove demising wall between buildings (5204 16th Ave Filed under Application B00622968-I1
B00577689-P3
08/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2022
Permit issued — General Construction
B00577689-I1-GC
09/29/2022
Signed off — Alteration
B00764114-I1
09/20/2022
Permit issued — Plumbing
B00593744-I1-PL
09/20/2022
Permit issued — Sprinklers
B00623233-I1-EW-SP
06/27/2022
Filed — Alteration
B00764114-I1
06/27/2022
Permit issued — Sidewalk Shed
B00764114-I1-SH
06/02/2022
Objection resolved — Addressed
06/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
06/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
06/01/2022
Special inspection requirement — Maintenance information
PAUL MARINO
06/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
05/25/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
04/10/2022
Objection raised — Energy
04/10/2022
Objection resolved — Addressed
04/10/2022
Objection raised — Scope
04/10/2022
Objection resolved — Addressed
04/10/2022
Objection raised — Inspections
04/10/2022
Objection resolved — Addressed
04/10/2022
Objection raised — Fire_Protection
04/10/2022
Objection resolved — Addressed
04/05/2022
Filed — Alteration
Filing Plumbing fixtures in conjunction with DOB B00577689-P1
B00593744-I1
04/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
03/29/2022
Permit issued — Construction Fence
B00699295-I1-FN
03/24/2022
Permit issued — Structural
B00682015-I1-ST
03/23/2022
Objection raised — Structural
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Scope
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedWNW & Sons Plumbing & Heating09/20/2024
DOB NOWGeneral ConstructionSigned-offGlobal Home Improvements12/02/2022
DOB NOWPlumbingSigned-offWNW & Sons Plumbing & Heating09/20/2022
DOB NOWSprinklersPermit IssuedWNW & Sons Plumbing & Heating09/20/2022
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group06/27/2022
DOB NOWConstruction FenceSigned-offGlobal Home Improvements03/29/2022
DOB NOWStructuralSigned-offGlobal Home Improvements03/24/2022
DOB NOWGeneral ConstructionSigned-offGlobal Home Improvements10/14/2021
1 project · most recent 02/29/2024
FiledStatusContractorScope
02/29/2024Permit IssuedHQ Fire Protection39 heads
1 project · most recent 04/05/2022
Water/Sanitary
FiledStatusContractorScope
04/05/2022Signed-offWNW & Sons Plumbing & HeatingWater/Sanitary
1 project · most recent 06/28/2022
FiledStatusContractorScope
06/28/2022CompleteHigh Quality Electric of—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
03/15/2024Sprinkler SystemsPAUL MARINOspecial
03/15/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
03/15/2024Post-installed AnchorsPAUL MARINOspecial
11/21/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/21/2023Interior lighting powerPAUL MARINOenergy_progress
11/21/2023Fenestration air leakagePAUL MARINOenergy_progress
11/21/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/21/2023Fenestration air leakagePAUL MARINOenergy_progress
11/21/2023Interior lighting powerPAUL MARINOenergy_progress
11/21/2023Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/21/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/21/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/21/2023FinalJAMES SCHAEFERprogress
11/21/2023Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/21/2023FinalJAMES SCHAEFERprogress
06/01/2022HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
06/01/2022HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
06/01/2022Maintenance informationPAUL MARINOenergy_progress
06/01/2022HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
05/25/2022Energy Code Compliance InspectionsPAUL MARINOprogress
04/04/2022Fire-Resistant Penetrations and JointsPAUL MARINOspecial
02/16/2022Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
02/16/2022FinalJAMES SCHAEFERprogress
02/16/2022Structural Cold-Formed SteelPAUL MARINOspecial
02/16/2022Structural Steel - High Strength BoltingPAUL MARINOspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Avenue Eye ExamMedical / HealthcareCellar, Floors 1–3
Project B00623233 Alteration · Permit Entire · 02/28/2022
Emes Vision CenterMedical / HealthcareFloor 1
Project B00577689 Alteration · LOC Issued · 08/31/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00577689-P2Request digital key ↗
08/31/2026B00577689-P3Request digital key ↗
08/31/2026B00682015-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B00682015-I1Open ↗
09/01/2026B00593744-I1Open ↗
09/01/2026B00593744-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00682015-I1Open ↗
09/01/2026B00682015-I1Open ↗
09/01/2026B00682015-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00682015-I1Open ↗
08/30/2026B00699295-I1Open ↗
08/25/2026B00623233-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00682015-I1Open ↗
08/25/2026B00623233-I1Open ↗
08/14/2026B00623233-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00593744-I1Open ↗
08/13/2026B00577689-I1Open ↗