← Back
General warehouse
5208 3 AVENUE
BROOKLYN · BIN 3388017
💬 Discuss this project
2004Year Built
2Stories
E1Building Class
M1-2DZoning
47,600 sfGross Floor Area
2Units
LL97 Covered7 Open Violations ▸FDNY Report ↗
General warehouse · Owner of record: 5202-3RD AVE CORP · 16,020 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof3p · 2 filings · 20 docs
Floor 101p · 1 filing · 20 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 226p · 5 filings · 20 docs
Floor 118p · 6 filings · 20 docs
Mezzanine2p · 2 filings · 16 docs
Cellar1p · 1 filing · 12 docs
Basement1p · 1 filing · 4 docs
1 job · most recent 04/24/2025
Water/Sanitary
FiledStatusContractorScope
04/24/2025Signed-offSCHUMACHER & FARLEY P&H CWater/Sanitary
5 jobs · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteJANON ELECTRIC CORPGeneral Wiring
06/20/2022CompleteLCJ ELEC'L CONTR'S INCGeneral Wiring
03/03/2022CompleteLCJ ELEC'L CONTR'S INC—
08/03/2021CompleteGLO ELECTRIC LLC4 meters, 2 new_meters
01/22/2019CompleteR.C.M. ELECTRIC CORP.General Wiring
Building Lifecycle
All (200)Filed (40)Permit Issued (26)Signed Off (24)Violation (55)Inspection (17)Objection (8)Special Inspection (30)
06/01/2026
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-S1
11/06/2025
Signed off — Alteration
FILING FOR INSTALLATION OF FREE-STANDING RACKS WITHIN EXISTING WAREHOUSE. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B01210565-I1
10/16/2025
Special inspection requirement — Final
Joseph Smerina
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
10/14/2025
Filed — Alteration
FILING FOR INSTALLATION OF FREE-STANDING RACKS WITHIN EXISTING WAREHOUSE. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B01210565-P1
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
10/10/2025
Special inspection requirement — Final
Joseph Smerina
09/26/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228059-I1
09/26/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228090-I1
09/05/2025
Signed off — Alteration
HEREWITH FILING FOR REMOVAL OF MASONRY FACADE MEMBERS TO CREATE OPENING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01155784-I1
07/25/2025
Permit issued — Sign
B01228090-I1-SG
07/24/2025
Permit issued — Sign
B01228059-I1-SG
07/23/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228059-I1
07/23/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228090-I1
07/11/2025
Permit issued — General Construction
B01210565-I1-GC
06/16/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-I1
06/12/2025
Permit issued — Structural
B01155784-I1-ST
05/19/2025
Special inspection requirement — Final
LEON SKVIRSKY
05/16/2025
Filed — Alteration
FILING FOR INSTALLATION OF FREE-STANDING RACKS WITHIN EXISTING WAREHOUSE. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B01210565-I1
05/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-P1
04/02/2025
Permit issued — Structural
B01155784-I1-ST
03/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2025
Permit issued — Plumbing
B01174316-S1-PL
02/19/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-S1
02/10/2025
Permit issued — General Construction
B01174316-I1-GC
02/03/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-I1
01/27/2025
Filed — Alteration
HEREWITH FILING FOR REMOVAL OF MASONRY FACADE MEMBERS TO CREATE OPENING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01155784-I1
12/13/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Masonry
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Final
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
03/20/2023
Violation issued (FDNY_NOV, closed)
11/23/2022
Signed off — Alteration
412K - Herewith filing additional sprinkler work type for tenant fit-out to include additional sprinkler heads.
B08027565-I1
11/16/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/10/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2022
Signed off — Alteration
Two new roof penetrations for PS 412K tenant fitout space
B00612942-I1
11/09/2022
Signed off — Alteration
412K - Herewith filing Mechanical work type for tenant fit-out.
B00614065-I1
11/04/2022
Permit issued — Sprinklers
B08027565-I1-EW-SP
11/02/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/31/2022
Filed — Alteration
412K - Herewith filing additional sprinkler work type for tenant fit-out to include additional sprinkler heads.
B08027565-I1
10/30/2022
Filed — Alteration
412K - Herewith filing Mechanical work type for tenant fit-out.
B00614065-P5
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
10/25/2022
Signed off — Alteration
412K - Herewith filing Plumbing work type for tenant fit-out space.
B00614055-I1
10/25/2022
Signed off — Alteration
412K - Herewith filing sprinkler work type for tenant fit-out.
B00614070-I1
10/25/2022
Special inspection requirement — Sprinkler Systems
Michael Marchese
10/19/2022
Filed — Alteration
412K - Herewith filing Mechanical work type for tenant fit-out.
B00614065-P4
10/12/2022
Special inspection requirement — Duct leakage testing, insulation and design
Michael Marchese
10/12/2022
Special inspection requirement — Maintenance information
Michael Marchese
10/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
10/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
10/12/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
10/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
10/12/2022
Special inspection requirement — Final
Michael Marchese
Latest 60 of 200 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5202 3RD AVE10807/08/2026
451-453 PARK AVE SOUTH1507/08/2026
5202-3RD AVE CORP MWC MAN203/22/2026
5202 3 AVENUE CORP103/22/2026
MILCO GENERAL CONTRACT103/22/2026
FERGUSON103/22/2026
EAGLE ELEVATOR CO, INC103/22/2026
5202 THIRD AVENUE3503/21/2026
5202 THIRD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK DESIGN ARCHITECTS, LLP210/14/2025
LEON SKVIRSKY PE1007/23/2025
MICHAEL REIDY RA304/24/2025
IMEG101/27/2025
LORING CONSULTING ENGINEERS, INC.1310/31/2022
DIGROUPARCHITECTURE309/12/2022
SILMAN107/22/2022
CHARLES G. MICHEL ENGINEERING, PC.406/03/2022
CAMERON ENGINEERING204/11/2022
GKV ARCHITECTS111/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.1703/21/2026
METROPOLIS GROUP INC1603/21/2026
BUILDING BROTHERS2003/21/2026
NEW YORK DESIGN ARCHITECT LLP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAUL SIGNSScaffold1007/08/2026
ATLAS CONSTRUCTION LLCGeneral Contractor607/08/2026
SCHUMACHER & FARLEY P&H CPlumbing407/08/2026
FORTE CONSTRUCTION CORPGeneral Contractor307/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection207/08/2026
ENOBRAC PLUMBING, INCFire Protection207/08/2026
GLO ELECTRIC LLCElectrical103/22/2026
PRODUCTION CONTRACT. LLCGeneral Contractor107/08/2026
TRINIDAD CONSTRUCTION CORPGeneral Contractor104/09/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
ENOBRAC PLUMBING, INCPlumbing107/08/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
JANON ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957210/14/2025
PSI AGENCY INC.254101/27/2025
FUTURE TECH CONSULTANTS O5891610/31/2022
CHARLES G MICHEL ENGINEER2871206/03/2022
J & M INSPECTIONS LLC8017304/11/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC07/25/2025
DOB NOWSignSigned-offPAUL SIGNS, INC07/24/2025
DOB NOWGeneral ConstructionSigned-offTRINIDAD CONSTRUCTION COR07/11/2025
DOB NOWStructuralSigned-offATLAS CONSTRUCTION LLC06/12/2025
DOB NOWStructuralSigned-offATLAS CONSTRUCTION LLC04/02/2025
DOB NOWPlumbingSigned-offSCHUMACHER & FARLEY P&H C02/21/2025
DOB NOWGeneral ConstructionSigned-offPRODUCTION CONTRACT. LLC02/10/2025
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC11/04/2022
DOB NOWStructuralSigned-offFORTE CONSTRUCTION CORP08/01/2022
DOB NOWMechanical SystemsSigned-offFORTE CONSTRUCTION CORP04/21/2022
DOB NOWStructuralSigned-offATLAS CONSTRUCTION LLC04/15/2022
DOB NOWGeneral ConstructionSigned-offATLAS CONSTRUCTION LLC04/08/2022
DOB NOWPlumbingSigned-offENOBRAC PLUMBING, INC03/28/2022
DOB NOWSprinklersSigned-offENOBRAC PLUMBING, INC03/28/2022
DOB NOWStandpipeSigned-offENOBRAC PLUMBING, INC03/28/2022
DOB NOWGeneral ConstructionSigned-offFORTE CONSTRUCTION CORP03/22/2022
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC03/15/2022
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP03/11/2022
DOB NOWSignSigned-offPAUL SIGNS, INC01/28/2020
DOB NOWSignSigned-offPAUL SIGNS, INC01/28/2020
DOB NOWSignSigned-offPAUL SIGNS, INC01/27/2020
DOB NOWSignSigned-offPAUL SIGNS, INC03/21/2019
DOB NOWSignSigned-offPAUL SIGNS, INC03/21/2019
DOB NOWSignSigned-offPAUL SIGNS, INC04/10/2018
DOB NOWSignSigned-offPAUL SIGNS, INC04/10/2018
DOB NOWSignSigned-offPAUL SIGNS, INC04/10/2018
BIS—ISSUED5202 THIRD AVENUE CORP03/13/2024
BISOTISSUEDATLAS CONSTRUCTION LLC05/17/2019
BISMHISSUEDATLAS CONSTRUCTION LLC05/17/2019
BISOTISSUEDATLAS CONSTRUCTION LLC05/17/2019
BISSPISSUEDVIP FIRE SPRINKLER INC05/10/2019
BISPLISSUEDENOBRAC PLUMBING, INC04/18/2019
BISOTISSUEDATLAS CONSTRUCTION LLC04/15/2019
BISOTISSUEDATLAS CONSTRUCTION LLC04/15/2019
BISMHISSUEDATLAS CONSTRUCTION LLC04/15/2019
BIS—ISSUED5202 THIRD AVENUE CORP09/26/2017
BISSDISSUEDANTHONY GALLINA H&M CORP05/09/2005
BISSPISSUEDANTHONY GALLINA H&M CORP10/20/2004
BIS—ISSUEDMILCO GENERAL CONTRACTING CORP09/21/2004
BISEQISSUEDNEW VISION ENTERPRISE INC08/13/2004
+ 30 more permits on file
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
05/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/10/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/02/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/27/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
10/16/2025FinalJoseph Smerinaprogress
10/16/2025Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
10/10/2025Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
10/10/2025FinalJoseph Smerinaprogress
05/19/2025FinalLEON SKVIRSKYprogress
12/13/2024Structural Steel - DetailsMAURICIO ANDRADEspecial
12/13/2024Structural Steel - WeldingMAURICIO ANDRADEspecial
12/13/2024FinalMAURICIO ANDRADEprogress
12/13/2024Post-installed AnchorsMAURICIO ANDRADEspecial
12/13/2024Structural Steel - High Strength BoltingMAURICIO ANDRADEspecial
12/13/2024Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
12/13/2024MasonryMAURICIO ANDRADEspecial
10/26/2022Fire-Resistant Penetrations and JointsMichael Marchesespecial
10/25/2022Sprinkler SystemsMichael Marchesespecial
10/12/2022FinalMichael Marcheseprogress
10/12/2022Fire-Resistant Penetrations and JointsMichael Marchesespecial
10/12/2022Mechanical SystemsMichael Marchesespecial
10/12/2022Energy Code Compliance InspectionsMichael Marcheseprogress
10/12/2022Maintenance informationMichael Marcheseenergy_progress
10/12/2022Duct leakage testing, insulation and designMichael Marcheseenergy_progress
10/12/2022Shutoff dampersMichael Marcheseenergy_progress
10/12/2022HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
10/12/2022HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
09/14/2022Sprinkler SystemsMichael Marchesespecial
09/13/2022Fire-Resistance Rated ConstructionMichael Marcheseprogress
Latest 25 of 80.
▾Documents — 322 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch37
09/03/2026B00031016-I1Request digital key ↗
09/03/2026B00031013-I1Request digital key ↗
09/03/2026B00031019-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/02/2026B00288359-I1Request digital key ↗
09/02/2026B00288379-I1Request digital key ↗
09/02/2026B00288383-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION41
01/15/2025322113770Open ↗
02/29/2024322113770Open ↗
10/26/2023322113770Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION11
03/21/2024322113770Open ↗
03/11/2024322113770Open ↗
05/22/2019321953481Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
10/21/2019321953481Open ↗
10/21/2019321953481Open ↗
10/11/2019321953481Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/19/2024322113770Open ↗
05/28/2019321645172Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT2
01/21/2025322113770Open ↗
11/23/2021321645172Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/23/2021321645172Open ↗
▸Seals & Professional Certifications120
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/03/2026B00031016-I1Open ↗
09/03/2026B00031013-I1Open ↗
09/03/2026B00031019-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/01/2026B00614065-P1Open ↗
09/01/2026B00614065-P1Open ↗
09/01/2026B00614055-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/01/2026B00614065-P1Open ↗
09/01/2026B00614055-P2Open ↗
08/30/2026B00614070-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
08/12/2021321953481Open ↗
10/22/2019321953490Open ↗
04/18/2019321953481Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/05/2023322113770Open ↗
05/30/2019321953481Open ↗
04/19/2019321953490Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/19/2019321953490Open ↗
04/15/2019321953481Open ↗
04/15/2019321953481Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/13/2010320080292Open ↗
10/09/2009320080292Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/26/2017321645172Open ↗
▸Trade Schedules & Equipment13
▸BISEQUIPMENT USE PERMITS6
08/20/2021321953481Open ↗
08/20/2021321953481Open ↗
08/20/2021321953481Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/22/2019321953481Open ↗
10/15/2019321953481Open ↗
04/19/2019321953490Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
08/20/2021321953481Open ↗
08/20/2021321953481Open ↗
07/27/2021321953481Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/05/2023322113770Open ↗
09/26/2017321645172Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026B08027565-I1Open ↗
08/13/2026B00612942-P2Open ↗
08/13/2026B00614065-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00614070-I1Open ↗
08/13/2026B00614055-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/09/2009320080292Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/07/2019321953481Open ↗
04/18/2019321953481Open ↗
04/18/2019321953481Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/31/2026B00621017-I1Open ↗
08/13/2026B00614055-I1Open ↗
08/13/2026B00614065-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/05/2023322113770Open ↗
07/27/2021321953481Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/27/2021321953481Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/05/2023322113770Open ↗
07/27/2021321953481Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE15
01/15/2025322113770Open ↗
02/29/2024322113770Open ↗
10/26/2023322113770Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/25/2024322113770Open ↗
01/22/2024322113770Open ↗
12/12/2023322113770Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/12/2021321953481Open ↗
11/21/2019321953490Open ↗
03/12/2010320080292Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/09/2009320080292Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00614065-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
09/05/2023322113770Open ↗
10/22/2019321953490Open ↗
05/31/2019321645172Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/09/2025322113770Open ↗
08/12/2021321953481Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION8
03/08/2024322113770Open ↗
09/29/2023322113770Open ↗
09/05/2023322113770Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
08/31/2023322113770Open ↗
04/15/2019321953481Open ↗
04/15/2019321953481Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
11/21/2019321953490Open ↗
09/20/2019321953481Open ↗
06/13/2019321953481Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISPLOT DIAGRAM2
09/05/2023322113770Open ↗
09/26/2017321645172Open ↗