← Back
BuildNYC
General warehouse
5202 3RD AVENUE
BROOKLYN · BIN 3388017
💬 Discuss this project
2004Year Built
2Stories
E1Building Class
M1-2DZoning
47,600 sfGross Floor Area
2Units
LL97 Covered7 Active Violations ▸FDNY Report ↗
General warehouse · Owner of record: 5202-3rd Ave · 16,020 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3K Center80p · 5 filings · 20 docs
Floor 23K Center101p · 5 filings · 20 docs
Floor 13K Center131p · 12 filings · 20 docs
Mezzanine451-453 Park AVE. South CORP28p · 4 filings · 20 docs
Cellar3K Center103p · 9 filings · 20 docs
BasementMwc Management Corp.1p · 1 filing · 4 docs
Site & exteriorFerguson2p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5202 3rd Ave10607/08/2026
5202 Third Avenue3503/21/2026
451-453 Park Ave South1507/08/2026
5202 Third203/21/2026
Ferguson103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York Design Architects210/14/2025
Leon Skvirsky PE1007/23/2025
Michael Reidy RA304/24/2025
IMEG101/27/2025
Loring Consulting Engineers1310/31/2022
Digrouparchitecture309/12/2022
Silman107/22/2022
Charles G. Michel Engineering406/03/2022
Cameron Engineering204/11/2022
GKV Architects111/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants1703/21/2026
Metropolis Group1603/21/2026
Building Brothers2003/21/2026
New York Design Architect403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Paul SignsSign hanger1007/08/2026
Atlas ConstructionGeneral Contractor607/08/2026
Schumacher & Farley P&HPlumbing407/08/2026
Forte ConstructionGeneral Contractor307/08/2026
Enobrac PlumbingFire Protection207/08/2026
Rael Automatic Sprinkler CoFire Protection207/08/2026
Enobrac PlumbingPlumbing107/08/2026
Trinidad ConstructionGeneral Contractor104/09/2026
Janon ElectricElectrical103/22/2026
R.C.M. ElectricElectrical103/22/2026
Production ContractingGeneral Contractor107/08/2026
Glo ElectricElectrical103/22/2026
Capital Contracting P&HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957210/14/2025
PSI Agency254101/27/2025
Future Tech Consultants O5891610/31/2022
Charles G Michel Engineering2871206/03/2022
J & M Inspections8017304/11/2022
Building Lifecycle
All (200)Filed (40)Permit Issued (26)Signed Off (24)Violation (55)Inspection (17)Objection (8)Special Inspection (30)
06/01/2026
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-S1
11/06/2025
Signed off — Alteration
FILING FOR INSTALLATION OF FREE-STANDING RACKS WITHIN EXISTING WAREHOUSE. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B01210565-I1
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
10/16/2025
Special inspection requirement — Final
Joseph Smerina
10/14/2025
Filed — Alteration
FILING FOR INSTALLATION OF FREE-STANDING RACKS WITHIN EXISTING WAREHOUSE. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B01210565-P1
10/10/2025
Special inspection requirement — Final
Joseph Smerina
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
09/26/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228059-I1
09/26/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228090-I1
09/05/2025
Signed off — Alteration
HEREWITH FILING FOR REMOVAL OF MASONRY FACADE MEMBERS TO CREATE OPENING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01155784-I1
07/25/2025
Permit issued — Sign
B01228090-I1-SG
07/24/2025
Permit issued — Sign
B01228059-I1-SG
07/23/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228059-I1
07/23/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FERGUSON)
B01228090-I1
07/11/2025
Permit issued — General Construction
B01210565-I1-GC
06/16/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-I1
06/12/2025
Permit issued — Structural
B01155784-I1-ST
05/19/2025
Special inspection requirement — Final
LEON SKVIRSKY
05/16/2025
Filed — Alteration
FILING FOR INSTALLATION OF FREE-STANDING RACKS WITHIN EXISTING WAREHOUSE. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B01210565-I1
05/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-P1
04/02/2025
Permit issued — Structural
B01155784-I1-ST
03/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2025
Permit issued — Plumbing
B01174316-S1-PL
02/19/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-S1
02/10/2025
Permit issued — General Construction
B01174316-I1-GC
02/03/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES AS SHOWN PER PLANS.
B01174316-I1
01/27/2025
Filed — Alteration
HEREWITH FILING FOR REMOVAL OF MASONRY FACADE MEMBERS TO CREATE OPENING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01155784-I1
12/13/2024
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Masonry
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
12/13/2024
Special inspection requirement — Final
MAURICIO ANDRADE
03/20/2023
Violation issued (FDNY_NOV, closed)
11/23/2022
Signed off — Alteration
412K - Herewith filing additional sprinkler work type for tenant fit-out to include additional sprinkler heads.
B08027565-I1
11/16/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/10/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2022
Signed off — Alteration
Two new roof penetrations for PS 412K tenant fitout space
B00612942-I1
11/09/2022
Signed off — Alteration
412K - Herewith filing Mechanical work type for tenant fit-out.
B00614065-I1
11/04/2022
Permit issued — Sprinklers
B08027565-I1-EW-SP
11/02/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/31/2022
Filed — Alteration
412K - Herewith filing additional sprinkler work type for tenant fit-out to include additional sprinkler heads.
B08027565-I1
10/30/2022
Filed — Alteration
412K - Herewith filing Mechanical work type for tenant fit-out.
B00614065-P5
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
10/25/2022
Signed off — Alteration
412K - Herewith filing Plumbing work type for tenant fit-out space.
B00614055-I1
10/25/2022
Signed off — Alteration
412K - Herewith filing sprinkler work type for tenant fit-out.
B00614070-I1
10/25/2022
Special inspection requirement — Sprinkler Systems
Michael Marchese
10/19/2022
Filed — Alteration
412K - Herewith filing Mechanical work type for tenant fit-out.
B00614065-P4
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
10/12/2022
Special inspection requirement — Maintenance information
Michael Marchese
10/12/2022
Special inspection requirement — Shutoff dampers
Michael Marchese
10/12/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
10/12/2022
Special inspection requirement — Duct leakage testing, insulation and design
Michael Marchese
10/12/2022
Special inspection requirement — Final
Michael Marchese
10/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
10/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPaul Signs07/25/2025
DOB NOWSignSigned-offPaul Signs07/24/2025
DOB NOWGeneral ConstructionSigned-offTrinidad Construction07/11/2025
DOB NOWStructuralSigned-offAtlas Construction06/12/2025
DOB NOWStructuralSigned-offAtlas Construction04/02/2025
DOB NOWPlumbingSigned-offSchumacher & Farley P&H02/21/2025
DOB NOWGeneral ConstructionSigned-offProduction Contracting02/10/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co11/04/2022
DOB NOWStructuralSigned-offForte Construction08/01/2022
DOB NOWMechanical SystemsSigned-offForte Construction04/21/2022
DOB NOWStructuralSigned-offAtlas Construction04/15/2022
DOB NOWGeneral ConstructionSigned-offAtlas Construction04/08/2022
DOB NOWPlumbingSigned-offEnobrac Plumbing03/28/2022
DOB NOWStandpipeSigned-offEnobrac Plumbing03/28/2022
DOB NOWSprinklersSigned-offEnobrac Plumbing03/28/2022
DOB NOWGeneral ConstructionSigned-offForte Construction03/22/2022
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co03/15/2022
DOB NOWPlumbingSigned-offCapital Contracting P&H03/11/2022
DOB NOWSignSigned-offPaul Signs01/28/2020
DOB NOWSignSigned-offPaul Signs01/28/2020
DOB NOWSignSigned-offPaul Signs01/27/2020
DOB NOWSignSigned-offPaul Signs03/21/2019
DOB NOWSignSigned-offPaul Signs03/21/2019
DOB NOWSignSigned-offPaul Signs04/10/2018
DOB NOWSignSigned-offPaul Signs04/10/2018
DOB NOWSignSigned-offPaul Signs04/10/2018
BIS—ISSUED5202 Third Avenue03/13/2024
BISOTISSUEDAtlas Construction05/17/2019
BISMHISSUEDAtlas Construction05/17/2019
BISOTISSUEDAtlas Construction05/17/2019
BISSPISSUEDVip Fire Sprinkler05/10/2019
BISPLISSUEDEnobrac Plumbing04/18/2019
BISOTISSUEDAtlas Construction04/15/2019
BISOTISSUEDAtlas Construction04/15/2019
BISMHISSUEDAtlas Construction04/15/2019
BIS—ISSUED5202 Third Avenue09/26/2017
BISSDISSUEDAnthony Gallina H&M05/09/2005
BISSPISSUEDAnthony Gallina H&M10/20/2004
BIS—ISSUEDMilco General Contracting09/21/2004
BISEQISSUEDNew Vision Enterprise08/13/2004
+ 31 more permits on file
1 project · most recent 04/24/2025
Water/Sanitary
FiledStatusContractorScope
04/24/2025Signed-offSchumacher & Farley P&HWater/Sanitary
5 projects · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteJanon ElectricGeneral Wiring
06/20/2022CompleteLCJ Electrical ContractorsGeneral Wiring
03/03/2022CompleteLCJ Electrical Contractors—
08/03/2021CompleteGlo Electric4 meters, 2 new_meters
01/22/2019CompleteR.C.M. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
05/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/10/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/02/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/27/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
10/16/2025FinalJoseph Smerinaprogress
10/16/2025Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
10/10/2025FinalJoseph Smerinaprogress
10/10/2025Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
05/19/2025FinalLEON SKVIRSKYprogress
12/13/2024FinalMAURICIO ANDRADEprogress
12/13/2024Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
12/13/2024MasonryMAURICIO ANDRADEspecial
12/13/2024Post-installed AnchorsMAURICIO ANDRADEspecial
12/13/2024Structural Steel - DetailsMAURICIO ANDRADEspecial
12/13/2024Structural Steel - High Strength BoltingMAURICIO ANDRADEspecial
12/13/2024Structural Steel - WeldingMAURICIO ANDRADEspecial
10/26/2022Fire-Resistant Penetrations and JointsMichael Marchesespecial
10/25/2022Sprinkler SystemsMichael Marchesespecial
10/12/2022Mechanical SystemsMichael Marchesespecial
10/12/2022Fire-Resistant Penetrations and JointsMichael Marchesespecial
10/12/2022HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
10/12/2022Energy Code Compliance InspectionsMichael Marcheseprogress
10/12/2022FinalMichael Marcheseprogress
10/12/2022Maintenance informationMichael Marcheseenergy_progress
10/12/2022Duct leakage testing, insulation and designMichael Marcheseenergy_progress
10/12/2022Shutoff dampersMichael Marcheseenergy_progress
10/12/2022HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
09/14/2022Sprinkler SystemsMichael Marchesespecial
09/13/2022Lighting controlsMichael Marcheseenergy_progress
Latest 25 of 88.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FergusonRetailFloor 1
Project B01228059 Alteration · LOC Issued · 07/23/2025
Project B01228090 Alteration · LOC Issued · 07/23/2025
3K CenterEducationCellar, Floors 1, 2, Roof
Project B00612942 Alteration · LOC Issued · 12/08/2021
Project B00614055 Alteration · LOC Issued · 12/08/2021
Project B00614065 Alteration · LOC Issued · 12/08/2021
Project B00614070 Alteration · LOC Issued · 12/08/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 330 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch37
09/03/2026B00031016-I1Request digital key ↗
09/03/2026B00031013-I1Request digital key ↗
09/03/2026B00031019-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/02/2026B00288359-I1Request digital key ↗
09/02/2026B00288379-I1Request digital key ↗
09/02/2026B00288383-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION41
01/15/2025322113770Open ↗
02/29/2024322113770Open ↗
10/26/2023322113770Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION11
03/21/2024322113770Open ↗
03/11/2024322113770Open ↗
05/22/2019321953481Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
10/21/2019321953481Open ↗
10/21/2019321953481Open ↗
10/11/2019321953481Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/19/2024322113770Open ↗
05/28/2019321645172Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT2
01/21/2025322113770Open ↗
11/23/2021321645172Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/23/2021321645172Open ↗
▸Seals & Professional Certifications128
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/03/2026B00031016-I1Open ↗
09/03/2026B00031013-I1Open ↗
09/03/2026B00031019-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
10/09/2026B00621107-P1Open ↗
10/09/2026B00621107-P1Open ↗
10/09/2026B00621107-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
10/09/2026B00621107-P1Open ↗
09/01/2026B00614065-P1Open ↗
09/01/2026B00614065-P1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
08/12/2021321953481Open ↗
10/22/2019321953490Open ↗
04/18/2019321953481Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/05/2023322113770Open ↗
05/30/2019321953481Open ↗
04/19/2019321953490Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/19/2019321953490Open ↗
04/15/2019321953481Open ↗
04/15/2019321953481Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/13/2010320080292Open ↗
10/09/2009320080292Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/26/2017321645172Open ↗
▸Trade Schedules & Equipment13
▸BISEQUIPMENT USE PERMITS6
08/20/2021321953481Open ↗
08/20/2021321953481Open ↗
08/20/2021321953481Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/22/2019321953481Open ↗
10/15/2019321953481Open ↗
04/19/2019321953490Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
08/20/2021321953481Open ↗
08/20/2021321953481Open ↗
07/27/2021321953481Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/05/2023322113770Open ↗
09/26/2017321645172Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026B08027565-I1Open ↗
08/13/2026B00614065-P3Open ↗
08/13/2026B00612942-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00614070-I1Open ↗
08/13/2026B00614055-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/09/2009320080292Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/07/2019321953481Open ↗
04/18/2019321953481Open ↗
04/18/2019321953481Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/31/2026B00621017-I1Open ↗
08/13/2026B00614065-I1Open ↗
08/13/2026B00614055-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/05/2023322113770Open ↗
07/27/2021321953481Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/27/2021321953481Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/05/2023322113770Open ↗
07/27/2021321953481Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE15
01/15/2025322113770Open ↗
02/29/2024322113770Open ↗
10/26/2023322113770Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/25/2024322113770Open ↗
01/22/2024322113770Open ↗
12/12/2023322113770Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/12/2021321953481Open ↗
11/21/2019321953490Open ↗
03/12/2010320080292Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/09/2009320080292Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00614065-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
09/05/2023322113770Open ↗
10/22/2019321953490Open ↗
05/31/2019321645172Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/09/2025322113770Open ↗
08/12/2021321953481Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION8
03/08/2024322113770Open ↗
09/29/2023322113770Open ↗
09/05/2023322113770Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
08/31/2023322113770Open ↗
04/15/2019321953481Open ↗
04/15/2019321953481Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
11/21/2019321953490Open ↗
09/20/2019321953481Open ↗
06/13/2019321953481Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISPLOT DIAGRAM2
09/05/2023322113770Open ↗
09/26/2017321645172Open ↗